1 Sadabaug Phase-III

By Lalita Dharamchand Phulfagar

RG-MH-58073 · RERA P52100076649 · Last updated on MahaRERA portal: 17 May 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
1 of 11Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

1 Sadabaug Phase-III is a Plotted project by Lalita Dharamchand Phulfagar in Pune, Maharashtra, registered with MahaRERA as P52100076649 on 20 Jun 2024. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 10 of the 11 units on this registration are recorded sold or booked.

At a glance

Project

  • Name1 Sadabaug Phase-III
  • TypePlotted
  • Location
    • Mauje Shirur
    • Shirur
    • Pune
    • 412210
  • Pincode412210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100076649
  • ReraGenie IDRG-MH-58073

Builder

  • NameLalita Dharamchand Phulfagar
  • Entity typeIndividual
  • Other registrations2 more →
  • Past their filed date3
  • Declared earlier projects1 →

Key dates

1 months past promisethis monthRegisteredJun 2024PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2024
  • Promised completion30 Sep 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed76 files

Current status

91%10 of 11 units booked
141.6%Work done, per cost certificate

Figures as on 17 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 17 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes65%
Street LightingYes55%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,435 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional development Authority

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchH No 2197, Mutha Empire, Near Post Office, Revenue Colony
Estimated costRs 96.00 lakh
Cost incurredRs 1.36 cr
Work done141.59%
BuildingWingEstimatedIncurred
-NARs 96.00 lakhRs 1.36 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRahul Shah
EngineerMahendra Phulfagar
Chartered AccountantCA Priyesh Jain
Chartered Accountantnilesh raut
Chartered AccountantAbhishek Gadiya
PartnerRole in project
Lalita Dharamchand Phulfagar-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Architect Certificate 31032026 Phase-III.pdf17 May 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 31032026 Phase-III.pdf17 May 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 31032026 Phase-III.pdf17 May 2026
Withdrawal Update Form 1File: Architect Certificte Phase 3.pdf10 Feb 2026
Withdrawal Update Form 2File: Eng Cert Phase III.pdf10 Feb 2026
Withdrawal Update Form 3File: CA Cert Phase III.pdf10 Feb 2026
Form 5 (FY 2024-2025)File: Form-5 RERA Audit FY 2024-25 Phase-III.pdf28 Jan 2026
Form 2A (FY 2024-2025)File: Quality Assu Phase III.pdf13 Jan 2026
Form 1File: Form-1 Architect Certificate 30092025.pdf30 Oct 2025
Form 2File: Form-2 Engineer Certificate 30092025.pdf30 Oct 2025
Form 3File: Form-3 CA Certificate Phase-III 30092025.pdf30 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold booked Inventory 30092025.pdf30 Oct 2025
Form 1File: Form-1 Architect Certificate Phase-III 30062025.pdf31 Jul 2025
Form 2File: Form-2 Engineer Certificate Phase-III 3062025.pdf31 Jul 2025
Form 3File: Form-3 CA Certificate Phase-III 30062025.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Phase-III 30062025.pdf31 Jul 2025
Form 1File: Form-1 Architect Certificate 30092024 Phase-III.pdf25 Jul 2025
Form 2File: Form-2 Engineer Certificate 30092024 Phase-III.pdf25 Jul 2025
Form 3File: Form-3 CA Certificate 30092024 Phase-III.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory 30092024.pdf25 Jul 2025
Form 1File: Form-1 Architect Certificate 31122024 Phase-III.pdf25 Jul 2025
Form 2File: Form-2 Engineer Certificate Phase III 31122024.pdf25 Jul 2025
Form 3File: Form-3 CA Certificate Phase III 31122024.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-Booked Inventory Phase III 31122024.pdf25 Jul 2025
Form 1File: Form-1 Architect Certificate 31032025 Phase-III.pdf25 Jul 2025
Form 2File: Form-2 Engineer Certificate 31032025 Phase-III.pdf25 Jul 2025
Form 3File: Form-3 CA Certificate Phase-III 31032025.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold booked Inventory Ph III 31032025.pdf25 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate Phase III 31122024.pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate Phase III 31122024.pdf13 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory Phase III 31122024.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 30092024 Phase-III.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate 30092024 Phase-III.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30062024 Phase-III.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 30092024 Phase-III.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory 30062024.pdf9 Dec 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory 30092024.pdf9 Dec 2024
Layout approvalFile: Sanctioned Plan 2-8 18012024 (Highlighted).pdf7 Jun 2024
Layout approvalFile: Sanctioned Plan 1-8 18012024 (Highlighted).pdf7 Jun 2024
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 2-8 18012024 (Highlighted).pdf7 Jun 2024
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 1-8 18012024 (Highlighted).pdf7 Jun 2024
CERSAI detailsFile: Decalaration-Cum-Undetaking Phase-III 07062024.pdf7 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration abt Separate Bank Ac Phase-III 07062024.pdf7 Jun 2024
Other - TechnicalFile: Decalaration-Cum-Undetaking Phase-III 07062024.pdf7 Jun 2024
Declaration about Commencement CertificateFile: Declaration abt Commencement Certificate Phase-III 25052024.pdf28 May 2024
CERSAI detailsFile: CERSAI Undertaking Phase-III 20052024.pdf28 May 2024
CERSAI detailsFile: CERSAI Search Report 28052024.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 27052024.pdf28 May 2024
Proforma of Agreement for saleFile: Agreement For Sale-Draft Phase-III Vishal Shingavi Mail 22042024.pdf28 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation-Agreement for Sale 28052024.pdf28 May 2024
Other - LegalFile: Court Order 12122020 (Highlighted).pdf28 May 2024
Other - LegalFile: 7-12 Extract 31082023 (Highlighted).pdf28 May 2024
Other - LegalFile: Court Order (1 Page) 12122020.pdf28 May 2024
Other - LegalFile: New Pherfar 12152021 (Highlighted).pdf28 May 2024
Other - TechnicalFile: Annexure-A Declaration-Cum-Undertaking Phase-III 20052024.pdf28 May 2024
PAN CardFile: PAN-Lalita Phulfagar.pdf27 May 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance-Finanace Phase-III 20052024.pdf27 May 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance-Legal and Other 25052024.pdf27 May 2024
Details of encumbrances concerned to LegalFile: No Encumbrance-Finanace Phase-III 20052024.pdf27 May 2024
Details of encumbrances concerned to LegalFile: No Encumbrance-Legal and Other 25052024.pdf27 May 2024
Copy of the legal title reportFile: Legal Title Report 11052024.pdf13 May 2024
Proforma of Allotment letterFile: Proforma Allotment Letter Phase-III Vishal Shingavi.pdf6 May 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter Phase-III.pdf26 Apr 2024
Layout approvalFile: Sanctioned Plan 1-8 18012024.pdf17 Apr 2024
Building plan approval or NA orderFile: NA ORDER 09012024.pdf17 Apr 2024
Copy of Layout Approval (in case of layout)File: Sanctioned Plan 1-8 18012024.pdf17 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER 09012024.pdf17 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 18012024.pdf17 Apr 2024
Declaration about Commencement CertificateFile: CC Authentication Mail Phase-III.pdf17 Apr 2024
Declaration in FORM BFile: Form-B Affidavit Phase-III.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Phase-III.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Certificate Phase-III.pdf17 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Other Projects.pdf17 Apr 2024
Other - LegalFile: Sale Deed 22032011.pdf17 Apr 2024
Other - TechnicalFile: Declaration regarding Number of Plots Phase-III.pdf17 Apr 2024
Other - TechnicalFile: CC Authentication Mail Phase-III.pdf17 Apr 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
5 AudumberShirur Pune24CompletedDec 2020Dec 2019

How this compares with Pune

91%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep 1 Sadabaug Phase-III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shirur13,700+ in Pune

2 km1 Sadabaug Phase-IIICompleted 12Lapsed / revoked 17Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 56 registered projects within 2 km.

Builder: Lalita Dharamchand Phulfagar

Lalita Dharamchand Phulfagar has 3 registrations on MahaRERA, including 1 Sadabaug Phase-I and 1 Sadabaug Phase-II. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if 1 Sadabaug Phase-III is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of 1 Sadabaug Phase-III?

The registered promoter entity is Lalita Dharamchand Phulfagar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in 1 Sadabaug Phase-III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for 1 Sadabaug Phase-III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at 1 Sadabaug Phase-III?

The professionals named in the filing: Architect: Rahul Shah; Engineer: Mahendra Phulfagar; Chartered Accountant: CA Priyesh Jain; Chartered Accountant: nilesh raut; Chartered Accountant: Abhishek Gadiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in 1 Sadabaug Phase-III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About 1 Sadabaug Phase-III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save 1 Sadabaug Phase-III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.