ReraGenieLog inGet a buyer report

Home / Browse projects / Amravati, Maharashtra / DCC Dreamz City Chambers

Registered No litigation declared Commercial project

DCC Dreamz City Chambers

By DREAMZ-CITY REAL ESTATE PVT LTD

RG-MH-91665 · RERA P50300048015 · Last updated on MahaRERA portal: 3 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 17.00 crore secured on the land, in favour of Punjab National Bank

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 12 months from the original
5 of 11Construction stages donefurthest along: Staircases, 95%
144 of 179Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

DCC Dreamz City Chambers is a Commercial project by DREAMZ-CITY REAL ESTATE PVT LTD in Amravati, Maharashtra, registered with MahaRERA as P50300048015 on 7 Dec 2022. Possession is promised by 31 Oct 2026. The completion date has moved by 12 months from the original filing. 35 of the 179 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameDCC Dreamz City Chambers
  • TypeCommercial
  • Location
    • plot no 2/1
    • sheet no 56 D
    • Rallies Plot
    • Amravati (M Corp.)
    • Amravati
    • 444601
  • Pincode444601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50300048015
  • ReraGenie IDRG-MH-91665

Builder

  • NameDREAMZ-CITY REAL ESTATE PVT LTD
  • Entity typeCompany
  • DirectorNARENDRA BHARANI
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2022First promiseOct 2025Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Dec 2022
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 31 Oct 2025)
  • Buildings1 building record
  • Documents filed95 files

Current status

20%35 of 179 units booked
48.5%Work done, per cost certificate

Figures as on 3 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DCC Dreamz CIty ChambersNA940179179

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

DCC Dreamz CIty Chambers: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 3 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes85%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes90%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed208

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots208
Closed/Covered208

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,660 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofPunjab National Bank
Secured amountRs 17.00 crore
CERSAI search filedYes
Declared on12 Dec 2025
LandownerVillageDistrict
Narendra Gopichand BharaniAmravati (M Corp.)Amravati
Manoj Nandlal BharaniAmravati (M Corp.)Amravati

Approvals and building plan

Sanctioning authorityAmravati Municipal corporation
Permissible FSI14091.84
Proposed, not sanctioned5,745 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBus Stand Road, Amravati 444601
Estimated costRs 44.52 cr
Cost incurredRs 21.60 cr
Work done48.51%
BuildingWingEstimatedIncurred
DCC Dreamz CIty ChambersNARs 44.52 crRs 21.60 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMegha Akhil Laddha
EngineerPatankar Consultants Pvt Ltd
Chartered AccountantCA Manish N Khushlani
Chartered AccountantCA Aman Sahu
PartnerRole in project
DREAMZ-CITY REAL ESTATE PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA19122518776Oct 2025 → Oct 2026

Reason as filed by the promoterWe, Dreamz­City Real Estate Pvt Ltd, are promoter of the project DCC Dreamz City Chambers, registered under MahaRERA vide registration number P50300048015. Sir the foresaid project was projected to be completed by 31/10/2025 but due to lesser response in bookings and technical problems raised in the project the project is now bound to be delayed. The project till date is about 50% completed which is also certified by the project architect in form 1 uploaded in MahaRERA portal. Currently out of total 180 units in the project, we have sold 35 units. Out of which 23 have already given their conse

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf3 Apr 2026
Form 2File: Form 2.pdf3 Apr 2026
Form 3File: Form 3.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory.pdf3 Apr 2026
Form 1File: Form 1.pdf3 Apr 2026
Form 2File: Form 2.pdf3 Apr 2026
Form 3File: Form 3.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory.pdf3 Apr 2026
Form 1File: Form 1.pdf3 Apr 2026
Form 2File: Form 2.pdf3 Apr 2026
Form 3File: Form 3.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory.pdf3 Apr 2026
Form 1File: Form 1.pdf3 Apr 2026
Form 2File: Form 2.pdf3 Apr 2026
Form 3File: Form 3.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory.pdf3 Apr 2026
Form 1File: Form 1.pdf3 Apr 2026
Form 2File: Form 2.pdf3 Apr 2026
Form 3File: Form 3.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory.pdf3 Apr 2026
Form 1File: Form 1.pdf3 Apr 2026
Form 2File: Form 2.pdf3 Apr 2026
Form 3File: Form 3.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory.pdf3 Apr 2026
Form 1File: Form 1.pdf3 Apr 2026
Form 2File: Form 2.pdf3 Apr 2026
Form 3File: Form 3.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory.pdf3 Apr 2026
Form 1File: Form 1.pdf3 Apr 2026
Form 2File: Form 2.pdf3 Apr 2026
Form 3File: Form 3.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory.pdf3 Apr 2026
Form 1File: Form 1.pdf3 Apr 2026
Form 2File: Form 2.pdf3 Apr 2026
Form 3File: Form 3.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory.pdf3 Apr 2026
Form 1File: Form 1.pdf3 Apr 2026
Form 2File: Form 2.pdf3 Apr 2026
Form 3File: Form 3.pdf3 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory.pdf3 Apr 2026
Form 2A (FY 2025-2026)File: DCC-Form 2A.pdf3 Apr 2026
Form 5 (FY 2024-2025)File: DCC-FORM 5.pdf3 Apr 2026
Withdrawal Update Form 1File: 05 DCC-Architect Letter-Oct 25-13-12-2025.pdf19 Dec 2025
Withdrawal Update Form 2File: 05 DCC 311025 Engg Certi-Oct 2025.pdf19 Dec 2025
Withdrawal Update Form 3File: CA Certi-Oct 2025.pdf19 Dec 2025
Withdrawal Update Form 1File: FORM 1 300625.pdf12 Dec 2025
Withdrawal Update Form 1File: FORM 1 300925.pdf12 Dec 2025
Withdrawal Update Form 2File: 03 DCC 300625 Engineer Certificate.pdf12 Dec 2025
Withdrawal Update Form 2File: 04 DCC 300925Engineer Certificate -.pdf12 Dec 2025
Withdrawal Update Form 3File: CA Certi-June 2025.pdf12 Dec 2025
Withdrawal Update Form 3File: CA Certi-Sept 2025.pdf12 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dt 300624.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dt 300924.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dt 300624.pdf1 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dt 300924.pdf1 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_compressed.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30623.pdf20 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 300923.pdf20 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 311223.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 30623.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 30923.pdf20 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 311223.pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: dcc form 3 30623.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: dcc form 3 30923.pdf4 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: dcc form 3 311223_compressed.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf1 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (2).pdf1 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_0001_compressed.pdf25 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: dcc 22_0001 (2).pdf25 Sep 2023
Copy of the legal title reportFile: Plot 2 1 Purchase Deed.pdf26 Nov 2022
Copy of the legal title reportFile: Plot No 2 Purchase Deed.pdf26 Nov 2022
Copy of the legal title reportFile: PR Card.pdf26 Nov 2022
Details of encumbrances concerned to FinanceFile: Legal Encumbrance Com.pdf26 Nov 2022
Details of encumbrances concerned to LegalFile: Legal Encumbrance Com.pdf26 Nov 2022
Other - LegalFile: Declaration and Sale Deed.pdf9 Nov 2022
Other - TechnicalFile: Declaration and Sale Deed.pdf9 Nov 2022
Building plan approvalFile: AMC Sanction Plans.pdf1 Nov 2022
Layout approvalFile: Plot NA Order.pdf1 Nov 2022
PAN CardFile: PAN Card.pdf1 Nov 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Dreamzland Business ParkBorgaon Dharmale Nagpur Road Amravati 444901600CompletedMar 2020Mar 2020

How this compares with Amravati

20%of this project is bookeddistrict median 0%
8%of Amravati projects moved their completion datethis one moved by 12 months
33%of Amravati registrations have lapsed or been cancelledthis one is on the register

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep DCC Dreamz City Chambers on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Rallies Plot450+ in Amravati

2 kmDCC Dreamz City ChambersCompleted 19Lapsed / revoked 12Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 38 registered projects within 2 km.

Builder: DREAMZ-CITY REAL ESTATE PVT LTD

DREAMZ-CITY REAL ESTATE PVT LTD has 1 registration on MahaRERA, including DCC Dreamz City Chambers. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if DCC Dreamz City Chambers is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DCC Dreamz City Chambers?

The registered promoter entity is DREAMZ-CITY REAL ESTATE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DCC Dreamz City Chambers?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DCC Dreamz City Chambers?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DCC Dreamz City Chambers?

The professionals named in the filing: Architect: Megha Akhil Laddha; Engineer: Patankar Consultants Pvt Ltd; Chartered Accountant: CA Manish N Khushlani; Chartered Accountant: CA Aman Sahu. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DCC Dreamz City Chambers?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DCC Dreamz City Chambers. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DCC Dreamz City Chambers to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.