Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Mar 2032Possession promisedno revision filed
0 of 8Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
88 of 88Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 18 documents Report an error

Jai Amba Palm City- Queen Palm Wing A B is a Residential / Group Housing project by M/s Grand Palm City LLP in Amravati, Maharashtra, registered with MahaRERA as PR1031012600665 on 4 Jun 2026. Possession is promised by 31 Mar 2032. 0 of the 88 units on this registration are recorded sold or booked, and 0 of 8 construction stages are filed complete.

At a glance

Project

  • NameJai Amba Palm City- Queen Palm Wing A B
  • TypeResidential / Group Housing
  • Location
    • Plot No 1 Survey No 87/1/A Mouje Kathora Bu
    • Kathora Bk.
    • Amravati
    • 444602
  • Pincode444602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1031012600665
  • ReraGenie IDRG-MH-55361

Builder

  • NameM/s Grand Palm City LLP
  • Entity typePartnership
  • GSTIN27ABCFG0944N1Z6
  • Authorized signatoryNilesh Prakashrao Thakare
  • PartnerYogita Nileshrao Thakare
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2026PromisedMar 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Jun 2026
  • Promised completion31 Mar 2032
  • Revised completionNone
  • Buildings2 building records
  • Documents filed18 files

Current status

0%0 of 88 units booked

Figures as on 3 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Jai Amba Palm City- Queen Palm Wing A BJai Amba Palm City- Queen Palm Wing A 121144044
Jai Amba Palm City- Queen Palm Wing A BJai Amba Palm City- Queen Palm Wing B121144044

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 8 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

Jai Amba Palm City- Queen Palm Wing A B · wing Jai Amba Palm City- Queen Palm Wing A 0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Jai Amba Palm City- Queen Palm Wing A B · wing Jai Amba Palm City- Queen Palm Wing B0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed78

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots78
Stilt / Ground78
BuildingStilt / GroundTotal
Jai Amba Palm City- Queen Palm Wing A B Jai Amba Palm City- Queen Palm Wing A3939
Jai Amba Palm City- Queen Palm Wing A B Jai Amba Palm City- Queen Palm Wing B3939

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area43,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Mar 2026

Approvals and building plan

Sanctioning authorityMaharashtra Government Town Planning and Valuation Department
Permissible FSI10919.7
Proposed, not sanctioned10,920 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAPMC BUILDING, OLD COTTON MARKET, MALVIYA CHOWK, AMRAVATI, DISTT.AMRAVATI. MAHARASHTRA 444601

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTEJAS PATIL
EngineerKRISHNA GUPTA
Chartered AccountantASHUTOSH RAJPUT
PartnerRole in project
M/s Grand Palm City LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2032

Documents filed18

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: SITE PLAN_compressed.pdf3 Jun 2026
Building plan approvalFile: BPA BUILT UP AREA.pdf20 Mar 2026
Building plan approvalFile: QUEEN PALM WING AB.pdf14 Mar 2026
Building plan approvalFile: BPA ARECA PALM WING A.pdf14 Mar 2026
Building plan approvalFile: BPA ARECA PALM WING B.pdf14 Mar 2026
Building plan approvalFile: BPA ARECA PALM WING C.pdf14 Mar 2026
Building plan approvalFile: BPA CLUB HOUSE.pdf14 Mar 2026
Building plan approvalFile: BPA KING PALM WING AB.pdf14 Mar 2026
Building plan approvalFile: BPA LAYOUT SITE PLAN.pdf14 Mar 2026
Building plan approvalFile: BPA MAJESTIC PALM WING AB.pdf14 Mar 2026
Building plan approvalFile: BPA ROYAL PALM.pdf14 Mar 2026
Building plan approvalFile: BPA SCHOOL BUILDING.pdf14 Mar 2026
Building plan approvalFile: BPA UMBRELLA PALAM WING A.pdf14 Mar 2026
Building plan approvalFile: BPA UMBRELLA PALM WING BC.pdf14 Mar 2026
Building plan approvalFile: BPA UMBRELLA PALM WING D.pdf14 Mar 2026
Building plan approvalFile: BPA WINDMILL PALM WING AB.pdf14 Mar 2026
Building plan approvalFile: PHONIX PALM WING AB.pdf14 Mar 2026
Declaration and undertaking (Annexure A)File: DECLEARATION CUM UNDERTAKING_0001.pdf14 Mar 2026

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Jai Amba Palm City- Areca Palm Wing A,B,CPM1031012502604Plot No 1 Survey No 87/1/A Mouje Kathora Bu, Amravati204Mar 2026OngoingDec 2031Not due yet

How this compares with Amravati

0%of this project is bookeddistrict median 0%
8%of Amravati projects moved their completion datethis one has not
33%of Amravati registrations have lapsed or been cancelledthis one is on the register

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep Jai Amba Palm City- Queen Palm Wing A B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Plot No 1 Survey No 87/1/A Mouje Kathora Bu450+ in Amravati

2 kmJai Amba Palm City- QueeCompleted 11Lapsed / revoked 6Other 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 32 registered projects within 2 km.

Builder: M/s Grand Palm City LLP

M/s Grand Palm City LLP has 1 registration on MahaRERA, including Jai Amba Palm City- Queen Palm Wing A B. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if Jai Amba Palm City- Queen Palm Wing A B is delayed beyond 31 Mar 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Jai Amba Palm City- Queen Palm Wing A B?

The registered promoter entity is M/s Grand Palm City LLP, a partnership as per the filing. Its GSTIN 27ABCFG0944N1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Jai Amba Palm City- Queen Palm Wing A B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Jai Amba Palm City- Queen Palm Wing A B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Jai Amba Palm City- Queen Palm Wing A B?

The professionals named in the filing: Architect: TEJAS PATIL; Engineer: KRISHNA GUPTA; Chartered Accountant: ASHUTOSH RAJPUT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Jai Amba Palm City- Queen Palm Wing A B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Jai Amba Palm City- Queen Palm Wing A B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Jai Amba Palm City- Queen Palm Wing A B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.