Registered No litigation declared Others project

ROYAL TOWER

By ANIL LAXMICHAND BOTHRA

RG-MH-50351 · RERA P50300052769 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Stilt Floor, 85%
44 of 44Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

ROYAL TOWER is a Others project by ANIL LAXMICHAND BOTHRA in Amravati, Maharashtra, registered with MahaRERA as P50300052769 on 22 Sep 2023. Possession is promised by 28 Dec 2028. 0 of the 44 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameROYAL TOWER
  • TypeOthers
  • Location
    • SATURNA ROAD
    • SAI NAGAR
    • Amravati (M Corp.)
    • Amravati
    • 444607
  • Pincode444607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50300052769
  • ReraGenie IDRG-MH-50351

Builder

  • NameANIL LAXMICHAND BOTHRA
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredSep 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Sep 2023
  • Promised completion28 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed102 files

Current status

0%0 of 44 units booked
64.0%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROYAL TOWERNA76202444

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 85%.

ROYAL TOWER: 65% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth100%
Stilt Floor85%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area812 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jan 2026

Approvals and building plan

Sanctioning authorityAMRAVATI MUNCIPAL CORPORATION
Permissible FSI3299.74
Proposed, not sanctioned3,189 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDAWA BAZAR JAISTAMBH SQUARE AMRAVATI 444601
Estimated costRs 6.72 cr
Cost incurredRs 4.30 cr
Work done63.99%
BuildingWingEstimatedIncurred
ROYAL TOWERNARs 6.52 crRs 4.25 cr
-NARs 20.00 lakhRs 4.92 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGIRISH NAGPURE & ASSOCIATES
ArchitectNK DESIGN STUDIO
EngineerPANKAJ DESHMUKH
EngineerASHISH K AGRAWAL
Chartered AccountantCA DEEPAK ZAMBANI GAD & ASSOCIATES
Chartered AccountantKochar Mehta and Co LLP
Chartered AccountantANMOL BARDIA
PartnerRole in project
ANIL LAXMICHAND BOTHRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 Dec 2028

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1 signed.pdf21 May 2026
Withdrawal Update Form 2File: form 2 signed.pdf21 May 2026
Withdrawal Update Form 3File: form 3 q4 signed .pdf21 May 2026
Withdrawal Update Form 1File: FORM-1.pdf4 Mar 2026
Withdrawal Update Form 2File: FORM 2.pdf4 Mar 2026
Withdrawal Update Form 3File: FORM-3.pdf4 Mar 2026
Withdrawal Update Form 1File: FORM-1.pdf21 Feb 2026
Withdrawal Update Form 2File: Royal_Form 2_300925.pdf21 Feb 2026
Withdrawal Update Form 3File: FORM-3.pdf21 Feb 2026
Withdrawal Update Form 1File: FORM-1.pdf17 Feb 2026
Withdrawal Update Form 2File: Royal_Form 2_300925.pdf17 Feb 2026
Withdrawal Update Form 3File: FORM-3.pdf17 Feb 2026
Form 5 (FY 2023-2024)File: Form 5 RERA 2023-24.pdf2 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 RERA 2024-25.pdf2 Feb 2026
Withdrawal Update Form 1File: Royal_Form 1_300625.pdf11 Dec 2025
Withdrawal Update Form 1File: Royal_Form 1_300925.pdf11 Dec 2025
Withdrawal Update Form 2File: Royal_Form 2_300625.pdf11 Dec 2025
Withdrawal Update Form 2File: Royal_Form 2_300925.pdf11 Dec 2025
Withdrawal Update Form 3File: Royal_Form 3_300625.pdf11 Dec 2025
Withdrawal Update Form 3File: Royal_Form 3_300925.pdf11 Dec 2025
Form 1File: Royal Tower_Form 1_300923.pdf14 Aug 2025
Form 2File: Royal Tower_Form 2_300923.pdf14 Aug 2025
Form 3File: Royal Tower_Form 3_300923.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Royal Tower_SoldUnsold_300923.pdf14 Aug 2025
Form 1File: Royal Tower_Form 1_311223.pdf14 Aug 2025
Form 2File: Royal Tower_Form 2_311223.pdf14 Aug 2025
Form 3File: Royal Tower_Form 3_311223.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Royal Tower_SoldUnsold_311223.pdf14 Aug 2025
Form 1File: Royal Tower_Form 1_310324.pdf14 Aug 2025
Form 2File: Royal Tower_Form 2_310324.pdf14 Aug 2025
Form 3File: Royal Tower_Form 3_300624.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Royal Tower_SoldUnsold_310324.pdf14 Aug 2025
OthersFile: Royal Tower_Form 2A_310324.pdf14 Aug 2025
Form 1File: Form 1 30-6-2024.pdf14 Aug 2025
Form 2File: from 2 , 30-06-24.pdf14 Aug 2025
Form 3File: Royal Tower_Form 3_300624_compressed.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Royal Tower_SoldUnsold_300624.pdf14 Aug 2025
Form 1File: Form 1 30-9-2024.pdf14 Aug 2025
Form 2File: from 2,30-09-24.pdf14 Aug 2025
Form 3File: Royal Tower_Form 3_300924.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Royal Tower_SoldUnsold_300924.pdf14 Aug 2025
Form 1File: Form 1 31-12-2024.pdf14 Aug 2025
Form 2File: from 2,31-12-24.pdf14 Aug 2025
Form 3File: Royal Tower_Form 3_311224.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Royal Tower_SoldUnsold_311224.pdf14 Aug 2025
Form 1File: Form 1 31-3-2025.pdf14 Aug 2025
Form 2File: from 2, 31-03-25.pdf14 Aug 2025
Form 3File: Royal Tower_Form 3_310325.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Royal Tower_SoldUnsold_310325.pdf14 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2 , 30-06-24.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2,30-09-24.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2,31-12-24.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2, 31-03-25.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-6-2024.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-9-2024.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2024.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-3-2025.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Royal Tower_Form 3_300624_compressed.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Royal Tower_Form 3_300924_compressed.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Royal Tower_Form 3_311224_compressed.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Royal Tower_Form 3_310325_compressed.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Royal Tower_SoldUnsold_300624.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Royal Tower_SoldUnsold_300924.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Royal Tower_SoldUnsold_311224.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Royal Tower_SoldUnsold_310325.pdf26 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Royal Tower_Form 2A_310324.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Royal Tower_Form 1_300923.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Royal Tower_Form 1_311223.pdf8 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Royal Tower_Form 1_310324.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Royal Tower_Form 2_300923.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Royal Tower_Form 2_311223.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Royal Tower_Form 2_310324.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: Royal Tower_SoldUnsold_300923.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: Royal Tower_SoldUnsold_311223.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: Royal Tower_SoldUnsold_310324.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Royal Tower_Form 3_300923.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Royal Tower_Form 3_311223.pdf8 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Royal Tower_Form 3_310324.pdf8 Jul 2024
Other - TechnicalFile: Anil Bothra Declaration.pdf2 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DOC.pdf7 Aug 2023

How this compares with Amravati

0%of this project is bookeddistrict median 0%
8%of Amravati projects moved their completion datethis one has not
33%of Amravati registrations have lapsed or been cancelledthis one is on the register

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep ROYAL TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SAI NAGAR450+ in Amravati

2 kmROYAL TOWERCompleted 17Lapsed / revoked 4Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 32 registered projects within 2 km.

Builder: ANIL LAXMICHAND BOTHRA

ANIL LAXMICHAND BOTHRA has 2 registrations on MahaRERA, including LAXMI RESIDENCY SATURNA and ROYAL TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if ROYAL TOWER is delayed beyond 28 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROYAL TOWER?

The registered promoter entity is ANIL LAXMICHAND BOTHRA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROYAL TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROYAL TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROYAL TOWER?

The professionals named in the filing: Architect: GIRISH NAGPURE & ASSOCIATES; Architect: NK DESIGN STUDIO; Engineer: PANKAJ DESHMUKH; Engineer: ASHISH K AGRAWAL; Chartered Accountant: CA DEEPAK ZAMBANI GAD & ASSOCIATES; Chartered Accountant: Kochar Mehta and Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROYAL TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROYAL TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROYAL TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.