Home / Browse projects / Amravati, Maharashtra / Vivanta Infinity Private Limited

Registered No litigation declared Others project

Vivanta Infinity Private Limited

By VIVANTA INFINITY PRIVATE LIMITED

RG-MH-89760 · RERA P50300031314 · Last updated on MahaRERA portal: 22 May 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 18 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Amravati registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
1 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 95%
69 of 197Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

Vivanta Infinity Private Limited is a Others project by VIVANTA INFINITY PRIVATE LIMITED in Amravati, Maharashtra, registered with MahaRERA as P50300031314 on 15 Oct 2021. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 18 months from the original filing. 128 of the 197 units on this registration are recorded sold or booked, and 1 of 22 construction stages are filed complete.

At a glance

Project

  • NameVivanta Infinity Private Limited
  • TypeOthers
  • Location
    • University road
    • Biyani Square
    • Camp
    • Amravati (M Corp.)
    • Amravati
    • 444602
  • Pincode444602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50300031314
  • ReraGenie IDRG-MH-89760

Builder

  • NameVIVANTA INFINITY PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN27AAICV0183C1ZH
  • DirectorsJaya Sanjay Harwani, Rochit Sanjay Harwani

Key dates

1 months past promisethis monthRegisteredOct 2021First promiseMar 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Oct 2021
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Mar 2025)
  • Buildings2 building records
  • Documents filed107 files

Current status

65%128 of 197 units booked
101.2%Work done, per cost certificate

Figures as on 22 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Vivanta The InfinityNA14136262124
Vivanta The CampNA131273073

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 95%.

Vivanta The Infinity57%
ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)0%
Plinth95%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%
Vivanta The Camp56%
ActivityProgress
Excavation95%
Basement (if any)95%
Podiums (if any)0%
Plinth95%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 22 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes55%
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes20%
Community BuildingsYes40%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed166

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots166
Closed/Covered166
BuildingClosed/CoveredTotal
Vivanta The Infinity101101
Vivanta The Camp6565

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,422 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityAmravati Municipal corporation
Permissible FSI23765.68
Proposed, not sanctioned23,766 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHAMLA, NAGPUR, MAHARASHTRA 440025
Estimated costRs 53.87 cr
Cost incurredRs 54.50 cr
Work done101.17%
BuildingWingEstimatedIncurred
Vivanta The InfinityNARs 28.87 crRs 29.91 cr
Vivanta The CampNARs 19.24 crRs 19.94 cr
-NARs 5.75 crRs 4.64 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY NAGPURE AND ASSOCIATES
ArchitectRahul Farkade
EngineerP S PATHANKAR AND ASSOCIATES
EngineerHARSHAL THAKRA
EngineerPravin Purankar
Chartered AccountantCA AMAN H SAHU H SAHU
Chartered AccountantCA LALIT TAMBI OMPRAKASH TAMBI
Chartered AccountantASHUTOSH RAJPUT
PartnerRole in project
VIVANTA INFINITY PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50300027674Mar 2025 → Mar 2026

Reason as filed by the promoterDue to some unavoidable reasons we are unable to complete our project within time. So we request you to kindly accept our request and extend the date of completion. Thank you.

EA25022620013Mar 2025 → Sep 2026

Reason as filed by the promoterThe absence of key technical supervisors led to a slowdown in maintaining the required quality standards, forcing a pause in execution to ensure safety compliance.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: arch.pdf22 May 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE Q4 FY 25-26.pdf22 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 (7) (1) (2).pdf22 May 2026
Form 1File: ARCHITECTS CERTIFIVATE 1ST QTR.pdf23 Feb 2026
Form 2File: ENGINEERS CERTIFICATES 1st QTR.pdf23 Feb 2026
Form 3File: FORM NO-3 1st QTR.pdf23 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE 1st QTR 1.pdf23 Feb 2026
Form 1File: ARCHITECTS CERTIFICATE FORM 2nd QTR.pdf23 Feb 2026
Form 2File: ENGINEERS CERTIFICATES 2nd QTR.pdf23 Feb 2026
Form 3File: FORM NO-3 2nd QTR.pdf23 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE 2nd QTR 2.pdf23 Feb 2026
Form 1File: ARCHITECTS CERTIFICATES 3rd QTR.pdf23 Feb 2026
Form 2File: ENGINEER CERTIFICATES 3rd QTR.pdf23 Feb 2026
Form 3File: FORM NO-3 3rd QTR.pdf23 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE 3rd QTR 3.pdf23 Feb 2026
Other - LegalFile: GetUserDocumentFileContent (1).pdf25 Jun 2025
Other - LegalFile: GetUserDocumentFileContent (1).pdf25 Jun 2025
Declaration in FORM BFile: P50300031314_FileName_24.pdf24 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A MARCH-22.pdf19 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A MARCH-23.pdf19 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A MARCH-24.pdf19 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 23-24.pdf16 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate MARCH-25.pdf12 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FY 24-25 FORM 3.pdf12 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FY 24-25 FORM 3.pdf12 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGR CER MARCH-25.pdf12 Jun 2025
Other - LegalFile: Detailed CPMPERT For Balance Work to be Completed.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: DISCLOSER A BUILDING MARCH-25.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: DISCLOSER B BUILDING MARCH-25.pdf12 Jun 2025
Other - TechnicalFile: Detailed CPMPERT For Balance Work to be Completed.pdf12 Jun 2025
Disclosure of sold/ booked inventoryFile: Discloser A Building 28-Feb-25.pdf20 Mar 2025
Disclosure of sold/ booked inventoryFile: Discloser B Building 28-Feb-25.pdf20 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Mar-22.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate June-22.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Sep-22.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Dec-22.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Mar-23.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate june-23.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Sep-23.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Dec-23.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Mar-24.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate June-24.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Sep-24.pdf19 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Dec-24.pdf19 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 ENGR CER MARCH-22.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 ENGR CER JUNE-22.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 ENGR CER SEP-22.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 ENGR CER DEC-22.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 ENGR CER MARCH-23.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 ENGR CER JUNE-23.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 ENGR CER SEP-23.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 ENGR CER DEC-23.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 ENGR CER MARCH-24.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 ENGR CER JUNE-24.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 ENGR CER SEP-24.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 ENGR CER DEC-24.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q4 FY 23-24 FORM3.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 FY 24-25 FORM 3.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 FY 24-25 FORM 3.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 FY 24-25 FORM 3.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: DISCLOSER A BUILDING 30 NOV 24.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSER B BUILDING 30 NOV.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: VIVANTA INIFINITY A-BUILDING DISCLOSER AS ON 26-07-2024.pdf27 Jul 2024
Disclosure of sold/ booked inventoryFile: VIVANTA INIFINITY B-BUILDING DISCLOSER AS ON 26-07-2024.pdf27 Jul 2024
Disclosure of sold/ booked inventoryFile: VIVANTA INIFINITY A-BUILDING DISCLOSER AS ON 31-05-2024.pdf13 Jun 2024
Disclosure of sold/ booked inventoryFile: VIVANTA INIFINITY B-BUILDING DISCLOSER AS ON 31-05-2024.pdf13 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3 Q3 FY 22-23 (1).pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 FY 23-24.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 FY 23-24.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 FY 23-24.pdf22 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM NO 5.pdf31 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3 Q1 FY 22-23.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3 Q2 FY 22-23.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3 Q3 FY 22-23.pdf14 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM NO 3 Q4 FY 22-23.pdf14 Mar 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED A WING.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED B WING.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked Inventory_compressed.pdf23 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - FY 2021-22.pdf11 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5- FY 2021-22.pdf11 Apr 2023

How this compares with Amravati

65%of this project is bookeddistrict median 0%
8%of Amravati projects moved their completion datethis one moved by 18 months
33%of Amravati registrations have lapsed or been cancelledthis one is on the register

Computed across the 450+ Amravati projects on ReraGenie, from their own filings.

Keep Vivanta Infinity Private Limited on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Biyani Square, Camp450+ in Amravati

2 kmVivanta Infinity PrivateCompleted 5Lapsed / revoked 6Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: VIVANTA INFINITY PRIVATE LIMITED

VIVANTA INFINITY PRIVATE LIMITED has 1 registration on MahaRERA, including Vivanta Infinity Private Limited. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Amravati district page.

Frequently asked questions

What are my rights if Vivanta Infinity Private Limited is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vivanta Infinity Private Limited?

The registered promoter entity is VIVANTA INFINITY PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AAICV0183C1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vivanta Infinity Private Limited?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vivanta Infinity Private Limited?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vivanta Infinity Private Limited?

The professionals named in the filing: Architect: SANJAY NAGPURE AND ASSOCIATES; Architect: Rahul Farkade; Engineer: P S PATHANKAR AND ASSOCIATES; Engineer: HARSHAL THAKRA; Engineer: Pravin Purankar; Chartered Accountant: CA AMAN H SAHU H SAHU. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vivanta Infinity Private Limited?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vivanta Infinity Private Limited. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vivanta Infinity Private Limited to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.