Home / Browse projects / Thane, Maharashtra / ZIDANE TOWER
ZIDANE TOWER
RG-MH-28887 · RERA P51700027374 · Last updated on MahaRERA portal: 21 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ZIDANE TOWER is a Mixed project by STONEWORK DEVELOPERS LLP in Thane, Maharashtra, registered with MahaRERA as P51700027374 on 6 Dec 2020. Possession was promised by 30 Jun 2025 and is now 16 months past that date. 62 of the 82 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameZIDANE TOWER
- TypeMixed
- Location
- NASIK HIGHWAY
- MILLAT NAGAR
- Bhiwandi (M Corp.)
- Bhiwandi
- Thane
- 421302
- Pincode421302
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700027374
- ReraGenie IDRG-MH-28887
Builder
- NameSTONEWORK DEVELOPERS LLP
- Entity typePartnership
- GSTIN27AEEFS0264G1Z4
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnerSHAHNAWAZ FAROOQUE AHMED MOMIN
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on6 Dec 2020
- Promised completion30 Jun 2025
- Revised completionNone
- Buildings1 building record
- Documents filed91 files
Current status
Figures as on 21 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ZIDANE TOWER | NA | 11 | 11 | 65 | 16 | 81 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 21 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 0%.
ZIDANE TOWER91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
NA Plot Without StructureNot stated
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 21 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 0% |
Parking filed13
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MOHD YUSUF RAMZAN MOMIN | Bhiwandi (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ZIDANE TOWER | NA | Rs 11.25 cr | Rs 10.80 cr |
| - | NA | Rs 1.25 cr | Rs 1.20 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | WAHEED AHMAD HAMEED AHMAD ANSARI |
| Architect | HK DESIGN CONSULTANTS |
| Engineer | WAHEED AHMAD HAMEED AHMAD ANSARI |
| Engineer | Momin Shuraem Saud Ahmad |
| Chartered Accountant | B M CHAUHAN AND CO |
| Partner | Role in project |
|---|---|
| STONEWORK DEVELOPERS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed91
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form-1 Stonework Developers 30-06-2025.pdf | 21 Nov 2025 |
| Withdrawal Update Form 2File: Form-2 Stonework Developers 30-06-2025.pdf | 21 Nov 2025 |
| Withdrawal Update Form 3File: Form-3 Stonework Developers 30-06-2025.pdf | 21 Nov 2025 |
| Form 1File: Form-1 Architect Stonework.pdf | 4 Nov 2025 |
| Form 2File: Form-2 Stonework 31-03-24.pdf | 4 Nov 2025 |
| Form 3File: Form-3 Zidane Tower 31-03-2024.pdf | 4 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD.pdf | 4 Nov 2025 |
| Form 1File: Form-1.pdf | 4 Nov 2025 |
| Form 2File: Form-2.pdf | 4 Nov 2025 |
| Form 3File: Form-3-15-12-2022_Stonework.pdf | 4 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD.pdf | 4 Nov 2025 |
| Form 1File: Form-1 Architect Stonework_30-03-2023.pdf | 4 Nov 2025 |
| Form 2File: Form-2_Stonework_31-03-2023.pdf | 4 Nov 2025 |
| Form 3File: Form-3_Stonework_31-03-2023_Signed.pdf | 4 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD.pdf | 4 Nov 2025 |
| Form 1File: FORM 1 STONEWORK DEVELOPERS 30_06_23.pdf | 3 Oct 2025 |
| Form 2File: Form-2_Stonework_30-06-2023.pdf | 3 Oct 2025 |
| Form 3File: Form-3_Stonework_30-06-2023_Signed.pdf | 3 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD.pdf | 3 Oct 2025 |
| Form 1File: Form-1_Stonework_30-09-2023.pdf | 3 Oct 2025 |
| Form 2File: Form-2_Stonework_30-09-2023.pdf | 3 Oct 2025 |
| Form 3File: Form-3_Stonework_30-09-2023_Signed.pdf | 3 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD.pdf | 3 Oct 2025 |
| Form 1File: Form-1 Architect Stonework.pdf | 3 Oct 2025 |
| Form 2File: Form-2 Engineer Stonework.pdf | 3 Oct 2025 |
| Form 3File: Form-3_Stonework-Dec-23.pdf | 3 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD.pdf | 3 Oct 2025 |
| Form 1File: Form-1 Stone 30-06-24.pdf | 3 Oct 2025 |
| Form 2File: Form-2 30-06-24 Stonework.pdf | 3 Oct 2025 |
| Form 3File: Form-3 Zidane Tower 30-06-2024.pdf | 3 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD.pdf | 3 Oct 2025 |
| Form 1File: Form-1 Stonework 30-09-2024.pdf | 3 Oct 2025 |
| Form 2File: Form-2 30-09-24 Stonework.pdf | 3 Oct 2025 |
| Form 3File: Form-3 Stonework 30-09-2024.pdf | 3 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD.pdf | 3 Oct 2025 |
| Form 1File: Form-1 Stonework 31-12-2024.pdf | 3 Oct 2025 |
| Form 2File: Form-2 31-12-24 Stonework.pdf | 3 Oct 2025 |
| Form 3File: Form-3 Stonework 31-12-2024.pdf | 3 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD.pdf | 3 Oct 2025 |
| Form 1File: Form-1 Stone 31-03-25.pdf | 3 Oct 2025 |
| Form 2File: Form-2 31-03-25 Stonework.pdf | 3 Oct 2025 |
| Form 3File: Form 3 Stonework Developers LLP 31-03-2025.pdf | 3 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCOLURE OF SOLD AND UNSOLD.pdf | 3 Oct 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21_Signed.pdf | 28 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22_Signed.pdf | 28 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23_Signed.pdf | 28 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Stonework_30-03-2023.pdf | 27 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 STONEWORK DEVELOPERS 30_06_23.pdf | 27 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Stonework_30-09-2023.pdf | 27 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Stonework.pdf | 27 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Stonework_31-03-2023.pdf | 27 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Stonework_30-06-2023.pdf | 27 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2_Stonework_30-09-2023.pdf | 27 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineer Stonework.pdf | 27 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Stonework_31-03-2023_Signed.pdf | 27 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Stonework_30-06-2023_Signed.pdf | 27 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Stonework_30-09-2023_Signed.pdf | 27 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 123.pdf | 27 Feb 2024 |
| Layout approvalFile: C1_compressed_Gplus1.pdf | 27 Jan 2023 |
| Layout approvalFile: C2_compressed_2-7th.pdf | 27 Jan 2023 |
| Layout approvalFile: C3_compressed_8-9th.pdf | 27 Jan 2023 |
| Building plan approval or NA orderFile: C4_compressed_10-11th.pdf | 27 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: No Legal Encumbrance Decleration.pdf | 27 Jan 2023 |
| Details of encumbrances concerned to LegalFile: No Legal Encumbrance Decleration.pdf | 27 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: C1_compressed_Gplus1.pdf | 27 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: C2_compressed_2-7th.pdf | 27 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: C3_compressed_8-9th.pdf | 27 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: C4_compressed_10-11th.pdf | 27 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: ZIDANE CC upto 12 floor.pdf | 27 Jan 2023 |
| Declaration about Commencement CertificateFile: Format D.pdf | 27 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2021.pdf | 27 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2022.pdf | 27 Jan 2023 |
| CERSAI detailsFile: CERSAI_Declaration.pdf | 27 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-15-12-2022_Stonework.pdf | 27 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_Shahnawaz.pdf | 27 Jan 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf | 27 Jan 2023 |
| Copy of the legal title reportFile: Title Report.pdf | 2 Dec 2020 |
| Copy of the legal title reportFile: Search Report.pdf | 2 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate.pdf | 2 Dec 2020 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 2 Dec 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 91 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ZIDANE TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MILLAT NAGAR7,600+ in Thane
Filed coordinates, straight-line distance. 40 registered projects within 2 km.
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: STONEWORK DEVELOPERS LLP
STONEWORK DEVELOPERS LLP has 2 registrations on MahaRERA, including ZIDANE TOWER and HARSHA APARTMENT CO-OPERATIVE HOUSING SOCIETY LIMITED. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that ZIDANE TOWER shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if ZIDANE TOWER is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ZIDANE TOWER?
The registered promoter entity is STONEWORK DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27AEEFS0264G1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ZIDANE TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ZIDANE TOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ZIDANE TOWER?
The professionals named in the filing: Architect: WAHEED AHMAD HAMEED AHMAD ANSARI; Architect: HK DESIGN CONSULTANTS; Engineer: WAHEED AHMAD HAMEED AHMAD ANSARI; Engineer: Momin Shuraem Saud Ahmad; Chartered Accountant: B M CHAUHAN AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ZIDANE TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback