ZEN

By NEELKANTH REALTORS PVT LTD

RG-MH-39902 · RERA P51700049797 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Podiums (if any), 95%
6 of 83Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

ZEN is a Residential / Group Housing project by NEELKANTH REALTORS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700049797 on 24 Feb 2023. Possession is promised by 31 Dec 2026. 77 of the 83 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameZEN
  • TypeResidential / Group Housing
  • Location
    • POKHARAN ROAD NO 2
    • THANE
    • Thane (M Corp.)
    • 400610
  • Pincode400610
  • RERA no.P51700049797
  • ReraGenie IDRG-MH-39902

Builder

  • NameNEELKANTH REALTORS PVT LTD
  • Entity typeCompany
  • DirectorsBHAVIK BHIMJYANI, YOGESH DAWDA
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Current status

93%77 of 83 units booked
68.0%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ZENNA221983083

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 95%.

ZEN: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)95%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises66%
Sanitary Fittings within the flats / premises12%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.3%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes90%
Street LightingYes0%
Community BuildingsYes30%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes60%
Water conservation /Rain water harvestingYes75%
Energy managemcntYes80%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area205 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Feb 2026

Approvals and building plan

Sanctioning authorityHANE MUNICIPAL CORPORATION, THANE
Permissible FSI3144.13
Proposed, not sanctioned3,144 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVASANT VIHAR, POKHARAN ROPAD NO 2
Estimated costRs 16.50 cr
Cost incurredRs 11.22 cr
Work done68.01%
BuildingWingEstimatedIncurred
ZENNARs 16.50 crRs 11.22 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR. SHASHIKANT V DESHMUKH
Engineerkshitij patil
Chartered AccountantNEHALI & CO
PartnerRole in project
NEELKANTH REALTORS PVT LTD-

Litigation declared2

CaseCourtStatus
6470/2017Bombay High CourtPending
391/2017Court of Civil Judge ThanePending

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12602595Kamal Jugal AroraKamal Jugal Arora04/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architects Certificate - Mar 26.pdf9 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate - Mar 26.pdf9 Jun 2026
Withdrawal Update Form 3File: CA Certificate - March 26.pdf9 Jun 2026
Withdrawal Update Form 1File: Architect Certificate - June 25 - Signed.pdf5 Jun 2026
Withdrawal Update Form 1File: Architect Certificate - September 25 - Signed.pdf5 Jun 2026
Withdrawal Update Form 1File: Architect Certificate - December 25 - Signed.pdf5 Jun 2026
Withdrawal Update Form 2File: Form 2 - Engineer Certificate - June 25.pdf5 Jun 2026
Withdrawal Update Form 2File: Form 2 - Engineer Certificate - Sep 25.pdf5 Jun 2026
Withdrawal Update Form 2File: Form 2 - Engineer Certificate - Dec 25.pdf5 Jun 2026
Withdrawal Update Form 3File: Signed CA Certificate ZEN -Q-1-June 24.pdf5 Jun 2026
Withdrawal Update Form 3File: CA Certificate - September 25 - Signed.pdf5 Jun 2026
Withdrawal Update Form 3File: CA Certificate - December 25 - Signed.pdf5 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 ( Zen) _ Q-3.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3 CA Certificate Zen-Dec24.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Zen -Q-3.pdf18 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5 FY 23-24_ZEN.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5 FY 23-24_ZEN.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Architect Certificate-ZEN -Q1.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2-ZEN-June 24.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate ZEN -Q-1-June 24.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf7 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Q-4 ZEN.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf23 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate - Mar-23.pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Rera-Dec23-Zen.pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec 23.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec 23.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 23.pdf1 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Ca Certificate Dec 23.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate-ZEN- Sep-23.pdf28 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate-ZEN- Sep-23.pdf26 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A-Engineer Certificate 2022-23.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineering Certificate -Sep-23.pdf25 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Sep-23.pdf25 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate March-23.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- CA Certificate Zen-June 23.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate - June-23.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate June-23.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineer Certificate march 23.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- CA Certificate Zen-June 23.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23 - Zen.pdf11 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA-Zen-June-23 FORM 1.pdf7 Sep 2023
Details of encumbrances concerned to FinanceFile: Encumbrance fianancial.pdf18 Feb 2023
Details of encumbrances concerned to LegalFile: Encumbrance fianancial.pdf18 Feb 2023
CERSAI detailsFile: CERSAI_Search_Report_200260711253_For_Asset_Based_Search_18_02_2023_15_33_39_245.pdf18 Feb 2023
Proforma of Agreement for saleFile: Agreement for Sale BRB- Clean.pdf18 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report for agreement for sale.pdf18 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser in other real esate -Yogesh Dawda.pdf30 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser in other real estate -BRB.pdf30 Jan 2023
Copy of the legal title reportFile: Title Report -Zen.pdf14 Dec 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf14 Dec 2022
Building plan approvalFile: PLANS 2.pdf22 Nov 2022
Building plan approvalFile: PLANS 3.pdf22 Nov 2022
Building plan approvalFile: PLANS 4.pdf22 Nov 2022
Building plan approvalFile: PLANS 5.pdf22 Nov 2022
Building plan approvalFile: PLANS 6.pdf22 Nov 2022
Building plan approvalFile: PLANS 7.pdf22 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance legal.pdf22 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance legal.pdf22 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: PLANS 2.pdf22 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: PLANS 3.pdf22 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: PLANS 4.pdf22 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: PLANS 5.pdf22 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: PLANS 6.pdf22 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: PLANS 7.pdf22 Nov 2022
Declaration in FORM BFile: Form- B.pdf1 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration on seprate bank account.pdf22 Oct 2022
Layout approvalFile: PLANS 1.pdf11 Oct 2022
Copy of Layout Approval (in case of layout)File: PLANS 1.pdf11 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf11 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Zen.pdf30 Sep 2022
Deviation Report with respect to Allotment letterFile: Devation AFS.pdf30 Sep 2022
PAN CardFile: company pan card.pdf18 Aug 2022
Declaration about Commencement CertificateFile: CC covering letter.pdf18 Aug 2022

How this compares with Thane

93%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ZEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THANE7,600+ in Thane

Builder: NEELKANTH REALTORS PVT LTD

NEELKANTH REALTORS PVT LTD has 2 registrations on MahaRERA, including Lakeview and ZEN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ZEN is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ZEN?

The registered promoter entity is NEELKANTH REALTORS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ZEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ZEN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ZEN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ZEN?

The professionals named in the filing: Architect: AR. SHASHIKANT V DESHMUKH; Engineer: kshitij patil; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ZEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ZEN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ZEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.