Home / Browse projects / Raigarh, Maharashtra / YUVARNA RESIDENCY
YUVARNA RESIDENCY
RG-MH-17563 · RERA P52000054838 · Last updated on MahaRERA portal: 13 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
YUVARNA RESIDENCY is a Residential / Group Housing project by BHARAT MANGILAL JAIN in Raigarh, Maharashtra, registered with MahaRERA as P52000054838 on 15 Feb 2024. Possession is promised by 31 Mar 2027. 7 of the 20 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameYUVARNA RESIDENCY
- TypeResidential / Group Housing
- Location
- NA
- Pen (M Cl)
- Pen
- Raigarh
- 402107
- Pincode402107
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000054838
- ReraGenie IDRG-MH-17563
Builder
- NameBHARAT MANGILAL JAIN
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Feb 2024
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed65 files
Current status
Figures as on 13 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| YUVARNA RESIDENCY | NA | 7 | 5 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.
YUVARNA RESIDENCY: 62% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 10% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed27
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| YUVARNA RESIDENCY | NA | Rs 2.61 cr | Rs 2.61 cr |
| - | NA | Rs 29.00 lakh | Rs 29.00 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AR KULDIP HAJARE |
| Engineer | HEMANT NIMBKAR |
| Engineer | HARSH JAIN |
| Engineer | GRUHA KALPANA ARCHITECT & INTERIOR DESIGNER |
| Chartered Accountant | CA SHRIKANT DONGRE |
| Chartered Accountant | Atul A Shetye |
| Partner | Role in project |
|---|---|
| BHARAT MANGILAL JAIN | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 22 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jan 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM 2A_ MARCH 26_ YUVARNA RESIDENCY.pdf | 13 Aug 2026 |
| Withdrawal Update Form 1File: FORM 1_ DEC 25_ YUVARNA RESIDENCY.pdf | 11 Aug 2026 |
| Withdrawal Update Form 1File: FORM 1_ MAR 26_ YUVARNA RESIDENCY.pdf | 11 Aug 2026 |
| Withdrawal Update Form 1File: FORM 1_ JUNE 26_ YUVARNA RESIDENCY.pdf | 11 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2_ DEC 25_ YUVARNA RESIDENCY.pdf | 11 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2_ MAR 26_ YUVARNA RESIDENCY.pdf | 11 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2_ JUNE 26_ YUVARNA RESIDENCY.pdf | 11 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3_ DEC 25_ YUVARNA RESIDENCY_compressed.pdf | 11 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3_ MAR 26_ YUVARNA RESIDENCY_compressed.pdf | 11 Aug 2026 |
| Withdrawal Update Form 3File: FORM 3_ JUNE 26_ YUVARNA RESIDENCY_compressed.pdf | 11 Aug 2026 |
| Form 1File: FORM 1_ SEP 25_ YUVARNA RESIDENCY.pdf | 16 Mar 2026 |
| Form 2File: FORM 2_ SEP 25_ YUVARNA RESIDENCY.pdf | 16 Mar 2026 |
| Form 3File: FORM 3_ SEP 25_ YUVARNA RESIDENCY_compressed.pdf | 16 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 25_ YUVARNA RESIDENCY.pdf | 16 Mar 2026 |
| Form 1File: FORM 1_ MARCH 25_ YURVANA RESIDENCY.pdf | 6 Mar 2026 |
| Form 2File: FORM 2_ MARCH 25_ YUVARNA RESIDENCY.pdf | 6 Mar 2026 |
| Form 3File: FORM 3_ MARCH 25_ YUVARNA RESIDENCY_compressed.pdf | 6 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 25_ YUVARNA RESIDENCY.pdf | 6 Mar 2026 |
| Form 1File: FORM 1_ JUNE 25_ YUVARNA RESIDENCY.pdf | 6 Mar 2026 |
| Form 2File: FORM 2_ JUNE 25_ YUVARNA RESIDENCY.pdf | 6 Mar 2026 |
| Form 3File: FORM 3_ JUNE 25_ YUVARNA RESIDENCY_compressed.pdf | 6 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 25_ YUVARNA RESIDENCY.pdf | 6 Mar 2026 |
| Form 5 (FY 2024-2025)File: FORM 5_ MARCH 25_ YUVARNA RESIDENCY.pdf | 6 Mar 2026 |
| Form 2A (FY 2023-2024)File: FORM 2A_ MARCH 23-24_ YUVARNA RESIDENCY.pdf | 27 Nov 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A_ MARCH 25_ YUVARNA RESIDENCY.pdf | 27 Nov 2025 |
| Form 5 (FY 2023-2024)File: FORM 5_ MARCH 24_ YUVARNA RESIDENCY.pdf | 27 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 24.pdf | 26 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ JUNE 24.pdf | 26 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ SEP 24.pdf | 26 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ DEC 24.pdf | 26 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ MARCH 24.pdf | 26 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ JUNE 24.pdf | 26 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ SEP 24.pdf | 26 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ DEC 24.pdf | 26 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ MARCH 24.pdf | 26 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ JUNE 24.pdf | 26 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ SEP 24.pdf | 26 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ DEC 24.pdf | 26 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ JUNE 24.pdf | 26 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ SEP 24.pdf | 26 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ DEC 24.pdf | 26 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: MAIL.pdf | 5 Feb 2024 |
| Details of encumbrances concerned to LegalFile: MAIL.pdf | 5 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 5 Feb 2024 |
| Declaration in FORM BFile: form b.pdf | 5 Feb 2024 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf | 5 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPAR.pdf | 5 Feb 2024 |
| Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (1) (1).pdf | 5 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (1)_merged_organized_compressed.pdf | 25 Jan 2024 |
| Other - TechnicalFile: other tech.pdf | 25 Jan 2024 |
| Layout approvalFile: 5 Copy of Layout Approval (in case of layout) PRINT.pdf | 23 Jan 2024 |
| Building plan approvalFile: 5 Copy of Layout Approval (in case of layout) PRINT.pdf | 23 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 5 Copy of Layout Approval (in case of layout) PRINT.pdf | 23 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 Copy of Layout Approval (in case of layout) PRINT.pdf | 23 Jan 2024 |
| Copy of the legal title reportFile: 1 Copy of the legal title report (1).pdf | 22 Jan 2024 |
| Other - LegalFile: 17 Legal Other_compressed.pdf | 22 Jan 2024 |
| PAN CardFile: 1 PAN CARD.pdf | 21 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: 4 b Details of encumbrances concerned to Legal.pdf | 21 Jan 2024 |
| Details of encumbrances concerned to LegalFile: 4 b Details of encumbrances concerned to Legal.pdf | 21 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificates NA Order for plotted development PRINT.pdf | 21 Jan 2024 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (1).pdf | 21 Jan 2024 |
| CERSAI detailsFile: 12 CERSAI details.pdf | 21 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 14 Disclosure of Interest in Other Real Estate Organizations.pdf | 21 Jan 2024 |
| Proforma of Allotment letterFile: 16 Proforma of Allotment letter.pdf | 21 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: 20 Deviation Report with respect to Allotment letter.pdf | 21 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep YUVARNA RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NA5,900+ in Raigarh
Filed coordinates, straight-line distance. 75 registered projects within 2 km.
HAWARE GRANDE
HAWARE GRANDE
KALINDI ELITE
KALINDI REALTORS PRIVATE LIMITED
GOKUL
SUYASH BUILDERS AND DEVELOPERS
OSCAR HEIGHTS
OSCAR BUILDERS
dbafna ONE
D Bafna Properties
MITHILA
SATHE SCHEMES LLP
See every Raigarh project, with the district possession charts
Builder: BHARAT MANGILAL JAIN
BHARAT MANGILAL JAIN has 1 registration on MahaRERA, including YUVARNA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if YUVARNA RESIDENCY is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of YUVARNA RESIDENCY?
The registered promoter entity is BHARAT MANGILAL JAIN, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in YUVARNA RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for YUVARNA RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at YUVARNA RESIDENCY?
The professionals named in the filing: Architect: AR KULDIP HAJARE; Engineer: HEMANT NIMBKAR; Engineer: HARSH JAIN; Engineer: GRUHA KALPANA ARCHITECT & INTERIOR DESIGNER; Chartered Accountant: CA SHRIKANT DONGRE; Chartered Accountant: Atul A Shetye. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in YUVARNA RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback