Completed No litigation declared Residential / Group Housing project

YOU57 TOWER B

By SANAS DEVELOPERS PRIVATE LIMITED

RG-MH-16444 · RERA P52100025947 · Last updated on MahaRERA portal: 6 Dec 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2023Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Installation of Lifts, 90%
0Complaints at MahaRERAon this registration
Jump to the 100 documents Report an error

YOU57 TOWER B is a Residential / Group Housing project by SANAS DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100025947 on 2 Aug 2020. The registration is recorded completed; possession was promised by 30 Sep 2023.

At a glance

Project

  • NameYOU57 TOWER B
  • TypeResidential / Group Housing
  • Location
    • MIDC PHASE III
    • HINJEWADI
    • Man
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100025947
  • ReraGenie IDRG-MH-16444

Builder

  • NameSANAS DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45309PN2019PTC181901
  • GSTIN27ABBCS5370G1ZA
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsSURENDRA RAMCHANDRA SANAS, SIDDHANTH SURENDRA SANAS, SUDHIR MUKUND KULKARNI
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2020PromisedSep 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Aug 2020
  • Promised completion30 Sep 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed100 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER BNA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

TOWER B: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 6 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed43

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots43
Closed/Covered1
Open Space42

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,800 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4799.0
Proposed, not sanctioned4,799 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKP HSG SOCIETY GEN THIMAYA ROAD EAST STREET CAMP PUNE 411001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPANDIT JOSHI AND ASSOCIATES
EngineerPRASAD KANAWADE
Chartered AccountantNIKITA BAJAJ
PartnerRole in project
SANAS DEVELOPERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Sep 2023

Documents filed100

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Tower B1.pdf6 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert_Tower-B_30_09_2023(revised)_compressed.pdf21 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QA certificate for tower B 30 09 2023.pdf21 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SCANNED FORM 3 (TOWER B)_compressed.pdf21 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: RERA_-FORM_4.pdf14 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OC WING-B.pdf12 Sep 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: You57 Tower B- society formation.pdf11 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE TOWER B 30-06-2023_compressed.pdf14 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 30-06-2023_compressed.pdf14 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM - 2A Tower - B Quality Assurance 30-06-2023.pdf14 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Tower B_compressed.pdf14 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 TOWER B CA Certificate 30-06-2023.pdf14 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE TOWER B.pdf12 May 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOL TOWER B -MARCH2023.pdf12 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31122022.pdf11 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2 31122022.pdf11 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineers Certificate Form 2A 31122022.pdf11 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FORM 3.pdf11 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SIGNED - TOWER B (1)_compressed.pdf27 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM_5-TOWER_B_compressed.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE TOWER B.pdf14 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A-TOWER B.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER_-B-ARCHITECT CERTIFICATE_compressed.pdf12 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE TOWER B_compressed.pdf12 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A-TOWER B_compressed.pdf12 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate TOWER B_compressed.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate tower B_compressed.pdf19 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate tower B_compressed.pdf19 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER B -FORM 1_compressed.pdf16 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower_-_B ARCHITECT CERTIFICATE_compressed.pdf11 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate Form 2 Tower B 30062022_compressed.pdf11 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Form 2A Tower B 30062022_compressed.pdf11 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: TOWER B FORM 3 -FINAL_compressed.pdf11 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECHTS CERTIFICATE-TOWER B_compressed.pdf9 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Certificate Tower B 31 03 2022.pdf9 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Certificate Tower B 31 03 2022.pdf9 Apr 2022
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD TOWER B_compressed.pdf9 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 TOWER B_compressed.pdf9 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A for Tower b.pdf3 Feb 2022
Disclosure of sold/ booked inventoryFile: YOU57 Tower B Sold Unsold List_compressed.pdf3 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -Tower B.pdf29 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's certificate Tower B.pdf29 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 TOWER B_compressed.pdf29 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECHT CERTIFICATE TOWER B.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Tower B.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Engg certificate Tower B.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: SDPL_Tower-B_Sold_Unsoldd Inventory_compressed.pdf7 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED FORM 03-TOWER B.pdf7 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Declaration Tower B_Form D.pdf19 Aug 2021
Declaration about Commencement CertificateFile: Declaration Tower B_Form D.pdf19 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure Sold_unsold Tower B_compressed.pdf19 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Tower B.pdf14 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_TB_30062021_compressed.pdf14 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 05-SIGNED TOWER B (1)_compressed.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_TB_ 30062021_compressed.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_TB_30062021_compressed.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate TB 31-03-2021_compressed.pdf5 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er Certificate TB 31-03-2021_compressed.pdf5 Aug 2021
Disclosure of sold/ booked inventoryFile: Booking List TB_compressed.pdf5 Aug 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 03-SIGNED TOWER B (1)_compressed.pdf5 Aug 2021
Building plan approvalFile: Model_-_Approved-pages-1.pdf14 Jul 2021
Building plan approvalFile: Model_-_Approved-pages-2.pdf14 Jul 2021
Building plan approvalFile: Model_-_Approved-pages-3.pdf14 Jul 2021
Building plan approvalFile: Model_-_Approved-pages-4.pdf14 Jul 2021
Building plan approvalFile: Model_-_Approved-pages-5.pdf14 Jul 2021
Building plan approvalFile: Model_-_Approved-pages-6.pdf14 Jul 2021
Building plan approvalFile: Model_-_Approved-pages-7.pdf14 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Model_-_Approved-pages-1.pdf14 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Model_-_Approved-pages-2.pdf14 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Model_-_Approved-pages-3.pdf14 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Model_-_Approved-pages-4.pdf14 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Model_-_Approved-pages-5.pdf14 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Model_-_Approved-pages-6.pdf14 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: Model_-_Approved-pages-7.pdf14 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate revised 19042021.pdf14 Jul 2021
Proforma of Allotment letterFile: AGREEMENT_FOR_SALE_TOWER-B.pdf14 Jul 2021
Layout approvalFile: Layout.pdf29 Jul 2020
Building plan approvalFile: page1.pdf29 Jul 2020
Building plan approvalFile: page2.pdf29 Jul 2020
Building plan approvalFile: page2.pdf29 Jul 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YOU57 TOWER B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HINJEWADI13,700+ in Pune

Builder: SANAS DEVELOPERS PRIVATE LIMITED

SANAS DEVELOPERS PRIVATE LIMITED has 5 registrations on MahaRERA, including YOU57 TOWER A and YOU57 TOWER B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if YOU57 TOWER B is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YOU57 TOWER B?

The registered promoter entity is SANAS DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45309PN2019PTC181901 and GSTIN 27ABBCS5370G1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YOU57 TOWER B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for YOU57 TOWER B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YOU57 TOWER B?

The professionals named in the filing: Architect: PANDIT JOSHI AND ASSOCIATES; Engineer: PRASAD KANAWADE; Chartered Accountant: NIKITA BAJAJ. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YOU57 TOWER B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YOU57 TOWER B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YOU57 TOWER B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.