ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / YOU57 TOWER A

Completed No litigation declared Residential / Group Housing project

YOU57 TOWER A

By SANAS DEVELOPERS PRIVATE LIMITED

RG-MH-13004 · RERA P52100021770 · Last updated on MahaRERA portal: 16 Aug 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 98%
1Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

YOU57 TOWER A is a Residential / Group Housing project by SANAS DEVELOPERS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100021770 on 23 Jul 2019. The registration is recorded completed; possession was promised by 30 Dec 2022. 1 complaint is on record with the regulator.

At a glance

Project

  • NameYOU57 TOWER A
  • TypeResidential / Group Housing
  • Location
    • MIDC PHASE III
    • HINJEWADI
    • Man
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100021770
  • ReraGenie IDRG-MH-13004

Builder

  • NameSANAS DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsSURENDRA RAMCHANDRA SANAS, SIDDHANTH SURENDRA SANAS
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2019PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Jul 2019
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER ANA210000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.

TOWER A: 84% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises81%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.72%

Progress on shared amenities15

As on 16 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes55%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered72
Open Space10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,800 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4570.48
Proposed, not sanctioned4,570 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKP HSG SOCIETY GEN THIMAYA ROAD EAST STREET CAMP PUNE 411001

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPANDIT JOSHI & ASSOCIATES
EngineerPRASAD N KANAWADE
Chartered AccountantNIKITA BAJAJ
PartnerRole in project
SANAS DEVELOPERS PRIVATE LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12600659Manisha Jairaj MoonSANAS DEVELOPERS PRIVATE LIMITED04/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Apr 2022

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: YOU57Tower A.pdf16 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM_5-TOWER_A_compressed.pdf20 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form_4.pdf5 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: TOWER A - FORM 1_compressed.pdf16 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Eng Certificate Tower A_compressed.pdf16 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A QA Tower A_compressed.pdf16 Jul 2022
Certificates of CA (Form 3)File: FORM 3 CA certificate TOWER A_compressed.pdf16 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART_OC_YOU57_TOWER-A.pdf21 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower_-_A_compressed.pdf11 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Certificate Tower A 31 03 2022.pdf9 Apr 2022
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD-TOWER A_compressed.pdf9 Apr 2022
Certificates of CA (Form 3)File: FORM-3 TOWER A_compressed.pdf9 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 A Tower A.pdf3 Feb 2022
Disclosure of sold/ booked inventoryFile: YOU57 Tower A Sold Unsold List_compressed.pdf3 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -Tower A_compressed.pdf29 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engieer's certificate Tower A.pdf29 Jan 2022
Certificates of CA (Form 3)File: FORM 3 -TOWER A_compressed.pdf29 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE TOWER A.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg certificate Tower A.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Engg certificate Tower A.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: SDPL_Tower-A_Sold_Unsoldd Inventory_compressed.pdf7 Oct 2021
Certificates of CA (Form 3)File: SIGNED FORM 03-TOWER A.pdf7 Oct 2021
Declaration about Commencement CertificateFile: Dec Comm Certificate TA.pdf25 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Tower A.pdf14 Aug 2021
Certificates of CA (Form 3)File: CA Certificate_TA_30062021_compressed.pdf14 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_TA_ 30062021_compressed.pdf13 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_TA_30062021_compressed.pdf13 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Certificate TA 31-03-2021_compressed.pdf5 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er Certificate TA 31-03-2021_compressed.pdf5 Aug 2021
Disclosure of sold/ booked inventoryFile: Booking List TA_compressed.pdf5 Aug 2021
Disclosure of sold/ booked inventoryFile: Tower-A Inventory sold-unsold_compressed.pdf3 Aug 2021
Certificates of CA (Form 3)File: FORM 03-SIGNED TOWER A_compressed.pdf3 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 05-SIGNED TOWER A_compressed.pdf3 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Arch Cert TA 31122020.pdf4 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers Cert TA 31122020.pdf4 Mar 2021
Certificates of CA (Form 3)File: CA Certificte 30122020.pdf4 Mar 2021
Proforma of Allotment letterFile: Agreement For Sale YOU57 Tower A.pdf2 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Arch Cert TA 31032020.pdf1 Oct 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Arch Cert TA 30062020.pdf1 Oct 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineers Cert TA 31032020-min.pdf1 Oct 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Arch Cert TA 30062020.pdf1 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Annul Report SDPL TA Form 5_FY 2019-20.pdf1 Oct 2020
Building plan approvalFile: Saction Plan_YOU57_5-5.pdf19 Jul 2019
Building plan approvalFile: Saction Plan_YOU57_6-6.pdf19 Jul 2019
Building plan approvalFile: Saction Plan_YOU57_7.pdf19 Jul 2019
Layout approvalFile: Hinjewadi YOU57 IOD.pdf19 Jul 2019
Building plan approvalFile: Saction Plan_YOU57_3-3.pdf19 Jul 2019
Building plan approvalFile: Sanction Plan 1_1.pdf19 Jul 2019
Building plan approvalFile: Sanction Plan 1_2.pdf19 Jul 2019
Building plan approvalFile: Saction Plan_YOU57_4-4.pdf19 Jul 2019
Copy of the legal title reportFile: Search Report.pdf19 Jul 2019
Details of encumbrancesFile: No Encumbrances.pdf19 Jul 2019
Copy of Layout Approval (in case of layout)File: Hinjewadi YOU57 IOD.pdf19 Jul 2019
Building Plan Approval (IOD)File: Sanction Plan 1_1.pdf19 Jul 2019
Building Plan Approval (IOD)File: Sanction Plan 1_2.pdf19 Jul 2019
Building Plan Approval (IOD)File: Saction Plan_YOU57_3-3.pdf19 Jul 2019
Building Plan Approval (IOD)File: Saction Plan_YOU57_4-4.pdf19 Jul 2019
Building Plan Approval (IOD)File: Saction Plan_YOU57_5-5.pdf19 Jul 2019
Building Plan Approval (IOD)File: Saction Plan_YOU57_6-6.pdf19 Jul 2019
Building Plan Approval (IOD)File: Saction Plan_YOU57_7.pdf19 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 18_03_2019.pdf19 Jul 2019
Declaration in FORM BFile: Declaration Form B.pdf19 Jul 2019
Certificates of CA (Form 3)File: CA Certificate 15072019.pdf19 Jul 2019
Proforma of Allotment letterFile: Allotment Letter.pdf19 Jul 2019
Proforma of Allotment letterFile: Agreement for Sale Final_YOU57.pdf19 Jul 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YOU57 TOWER A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HINJEWADI13,700+ in Pune

2 kmYOU57 TOWER ACompleted 39Lapsed / revoked 12Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 77 registered projects within 2 km.

Builder: SANAS DEVELOPERS PRIVATE LIMITED

SANAS DEVELOPERS PRIVATE LIMITED has 5 registrations on MahaRERA, including YOU57 TOWER A and YOU57 TOWER B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if YOU57 TOWER A is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YOU57 TOWER A?

The registered promoter entity is SANAS DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YOU57 TOWER A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against YOU57 TOWER A?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for YOU57 TOWER A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YOU57 TOWER A?

The professionals named in the filing: Architect: PANDIT JOSHI & ASSOCIATES; Engineer: PRASAD N KANAWADE; Chartered Accountant: NIKITA BAJAJ. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YOU57 TOWER A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YOU57 TOWER A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YOU57 TOWER A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.