YESHWANT SADAN

By ARG LIFE SPACES LLP

RG-MH-17766 · RERA P51800056424 · Last updated on MahaRERA portal: 6 Aug 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
7 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
15 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

YESHWANT SADAN is a Residential / Group Housing project by ARG LIFE SPACES LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800056424 on 31 May 2024. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 9 months from the original filing. 5 of the 20 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameYESHWANT SADAN
  • TypeResidential / Group Housing
  • Location
    • NARIMAN ROAD
    • VILE PARLE (EAST)
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800056424
  • ReraGenie IDRG-MH-17766

Builder

  • NameARG LIFE SPACES LLP
  • Entity typePartnership
  • PartnerGIRISHKUMAR SADANAND GAUD

Key dates

1 months past promisethis monthRegisteredMay 2024First promiseDec 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 May 2024
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed54 files

Current status

25%5 of 20 units booked
105.1%Work done, per cost certificate

Figures as on 6 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
YESHWANT SADANNA7620020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

YESHWANT SADAN: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered24
Open Space2

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area523 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
MISS BHADRASHEELA UMAKANT RANGNEKARVileparleMumbai Suburban
MRS SARITA RAGHUNATH RANGNEKARVileparleMumbai Suburban
SHRI BHARGAV UMAKANT RANGNEKARVileparleMumbai Suburban
MRS ANDREA SHEILA RANGNEKARPen RuralRaigarh

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI995.04
Proposed, not sanctioned995 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchM G ROAD VILE PARLE EAST MUMBAI 400057
Estimated costRs 24.71 cr
Cost incurredRs 25.96 cr
Work done105.07%
BuildingWingEstimatedIncurred
YESHWANT SADANNARs 24.71 crRs 25.96 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectH M JHAVERI & SONS
EngineerH M JHAVERI & SONS
EngineerSUNIL RATILAL SHAH
Chartered AccountantDILIP S SHAH & ASSOCIATES
Chartered AccountantRS DHOLAKIYA
PartnerRole in project
ARG LIFE SPACES LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA31122519188Dec 2025 → Sep 2026

Reason as filed by the promoter1. Plot Area Correction in Property Card There was a discrepancy observed in the plot area mentioned in the Property Card. The process of initiating and completing the area correction took considerable time due to verification, documentation, and approval stages. 2. Correction of MR Plan Following the correction in the Property Card, corresponding changes were required to be made in the MR (Measurement Report) Plan. This revalidation and correction exercise resulted in additional delays as it involved survey work and technical scrutiny. 3. Delay in Order of SLR for Area Correction and Drawing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA Form 1.pdf6 Aug 2026
Withdrawal Update Form 2File: FROM 2 ARG.pdf6 Aug 2026
Withdrawal Update Form 3File: Form-3.pdf6 Aug 2026
Withdrawal Update Form 1File: Form 1(1).pdf3 Aug 2026
Withdrawal Update Form 2File: Form 2 ENGINEER CERTIFICATE 15 04 2026.pdf3 Aug 2026
Withdrawal Update Form 3File: Form-3.pdf3 Aug 2026
Withdrawal Update Form 1File: Form 1(1).pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 ENGINEER CERTIFICATE 15 04 2026.pdf17 Apr 2026
Withdrawal Update Form 3File: Form-3.pdf17 Apr 2026
Withdrawal Update Form 1File: ARCHITECT RERA CERT 07 01 2026.PDF9 Apr 2026
Withdrawal Update Form 2File: Form 2 ARG.pdf9 Apr 2026
Withdrawal Update Form 3File: Form 3 CA(1)_11zon.pdf9 Apr 2026
Withdrawal Update Form 1File: Form 1 ARG LIFE SPACE.pdf31 Dec 2025
Withdrawal Update Form 2File: Form 2 ARG.pdf31 Dec 2025
Withdrawal Update Form 3File: Form 3 CA_11zon.pdf31 Dec 2025
Withdrawal Update Form 1File: FORM 1.pdf19 Dec 2025
Withdrawal Update Form 2File: Form 2 (2) (1).pdf19 Dec 2025
Withdrawal Update Form 3File: Form 3_11zon.pdf19 Dec 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate ARG.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ( Architect certificate).pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Engineer certificate.pdf11 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARG RERA FORM 1.pdf8 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (1).pdf7 Mar 2025
Disclosure of sold/ booked inventoryFile: Inventory ARG.pdf7 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 2.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ARG Form 2 Engineer Certificate.pdf11 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf9 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf9 Nov 2024
Disclosure of sold/ booked inventoryFile: ARG inventory Letter.pdf9 Nov 2024
Details of encumbrances concerned to FinanceFile: ARG ( Encumbrance Letter ).pdf10 Oct 2024
Details of encumbrances concerned to LegalFile: ARG ( Encumbrance Letter ).pdf10 Oct 2024
Proforma of Agreement for saleFile: ARG RERA Agreement for sale.pdf10 Oct 2024
Details of encumbrances concerned to FinanceFile: Non Encumbrance Certificate.pdf15 Apr 2024
Details of encumbrances concerned to LegalFile: Non Encumbrance Certificate.pdf15 Apr 2024
Copy of the legal title reportFile: Copy of the legal title report.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf1 Apr 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (21) (1).pdf30 Mar 2024
Proforma of Allotment letterFile: Model Allotment Letter.pdf30 Mar 2024
Layout approvalFile: Plan Drawing.pdf24 Feb 2024
Building plan approvalFile: Plan Drawing.pdf24 Feb 2024
PAN CardFile: 1 PAN Card.pdf24 Feb 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf24 Feb 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf24 Feb 2024
Copy of Layout Approval (in case of layout)File: Plan Drawing.pdf24 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan Drawing.pdf24 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: First Commencement Certificate.pdf24 Feb 2024
Declaration about Commencement CertificateFile: Format D.pdf24 Feb 2024
Declaration in FORM BFile: FORM B.pdf24 Feb 2024
CERSAI detailsFile: CERSAI Declaration.pdf24 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure of Interest.pdf24 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Declaration.pdf24 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf24 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf24 Feb 2024

How this compares with Mumbai Suburban

25%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 9 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YESHWANT SADAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILE PARLE (EAST)6,700+ in Mumbai Suburban

2 kmYESHWANT SADANCompleted 144Lapsed / revoked 77Other 141Dot size: filed unitsN

Filed coordinates, straight-line distance. 362 registered projects within 2 km.

Builder: ARG LIFE SPACES LLP

ARG LIFE SPACES LLP has 1 registration on MahaRERA, including YESHWANT SADAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if YESHWANT SADAN is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YESHWANT SADAN?

The registered promoter entity is ARG LIFE SPACES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YESHWANT SADAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for YESHWANT SADAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YESHWANT SADAN?

The professionals named in the filing: Architect: H M JHAVERI & SONS; Engineer: H M JHAVERI & SONS; Engineer: SUNIL RATILAL SHAH; Chartered Accountant: DILIP S SHAH & ASSOCIATES; Chartered Accountant: RS DHOLAKIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YESHWANT SADAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YESHWANT SADAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YESHWANT SADAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.