Yes Residency

By Yemul& Sancheti Associates

RG-MH-24865 · RERA P52100010630 · Last updated on MahaRERA portal: 12 Aug 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 66 months
  • 4 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2024Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 95%
2Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

Yes Residency is a Residential / Group Housing project by Yemul& Sancheti Associates in Pune, Maharashtra, registered with MahaRERA as P52100010630 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2024. The completion date has moved by 66 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameYes Residency
  • TypeResidential / Group Housing
  • Location
    • Hadapsar
    • Haveli
    • Pune
    • 411028
  • Pincode411028
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100010630
  • ReraGenie IDRG-MH-24865

Builder

  • NameYemul& Sancheti Associates
  • Entity typePartnership
  • PartnersMr Rahul Dattatray Yemul, Amol Dattatray Yemul, Anand Vinod Sancheti, Vinod Dhanraj Sancheti
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toJun 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion30 Jun 2024
  • Revised completionRevised to 30 Jun 2024 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed102 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Yes ResidencyNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Yes Residency: 80% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 12 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes75%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed66

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots66
Closed/Covered66

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4716.51
Proposed, not sanctioned4,652 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSadashiv Peth

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPrakash Kulkarni
Chartered AccountantAditya Patil
PartnerRole in project
Yemul& Sancheti Associates-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100017428Dec 2018 → Jun 2024

Reason as filed by the promoterDue to the Revised building plans and TDR related issues

EXT52100002479Dec 2018 → Jun 2021

Reason as filed by the promoterAt the time of registration of project with MahaRERA, we had planned for the finance from own contribution/ construction finance. However, we could not arrange the funds from financial institutions and advances from customer as expected.

EXT52100005865Dec 2018 → Jun 2021

Reason as filed by the promoterAt the time of registration of the project with MAHARERA, we had planned for the finance form own contribution/ construction finance. However, we could not arrange funds form financial institutions and advances from customer as expected. We request you to extend our project completion due date up to 30/06/2021. We apologize for the same.

EXT52100011992Dec 2018 → Jun 2023

Reason as filed by the promoterWork on the project was halted due to COVID-19 & Also funds are not received from the customers.

Litigation declared1

CaseCourtStatus
586/2017SpecialOn going

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC005000000022923MANJUSHA BHUSARIYEMUL AND SANCHETI ASSOCIATES18/04/2019
CC005000000053912ASHA GANGURDEYEMUL AND SANCHETI ASSOCIATES10/01/2020

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Aug 2024

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 1.pdf12 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 2.pdf12 Aug 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 3.pdf12 Aug 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect Form 4.pdf12 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf17 Oct 2023
Certificates of CA (Form 3)File: Form 3.pdf12 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organisations.PDF1 Jun 2023
Proforma of Agreement for saleFile: Proforma of Agreement for Sale_11zon.pdf1 Jun 2023
Building plan approvalFile: scan Besment,Ground floor.pdf31 May 2023
Building plan approvalFile: scan 1st to 6th Floor.pdf31 May 2023
Building plan approvalFile: scan 7th, 8th Floor.pdf31 May 2023
Building plan approvalFile: scan 9th, 10th Floor.pdf31 May 2023
Building plan approvalFile: scan Terres, Elevtion.pdf31 May 2023
Copy of the legal title reportFile: Search and Title Report .PDF31 May 2023
Copy of the legal title reportFile: Certificate of Title.PDF31 May 2023
Building Plan Approval (IOD)File: scan Besment,Ground floor.pdf31 May 2023
Building Plan Approval (IOD)File: scan 1st to 6th Floor.pdf31 May 2023
Building Plan Approval (IOD)File: scan 7th, 8th Floor.pdf31 May 2023
Building Plan Approval (IOD)File: scan 9th, 10th Floor.pdf31 May 2023
Building Plan Approval (IOD)File: scan Terres, Elevtion.pdf31 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf31 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects letter 2022.pdf19 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE, FORM 2.pdf18 Jan 2023
Details of encumbrances concerned to FinanceFile: No Encumbrances Concerned to Legal.pdf3 Jan 2023
Details of encumbrances concerned to LegalFile: No Encumbrances Concerned to Legal.pdf3 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE, FORM 2A.pdf3 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account.pdf3 Jan 2023
Deviation Report with respect to Allotment letterFile: NO DEVIATION IN Respect to ALLOTMENT LETTER.pdf3 Jan 2023
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION IN Model Copy of AGREEMENT.pdf3 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22 Yes.pdf29 Nov 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory.pdf10 Aug 2022
Certificates of CA (Form 3)File: Form 3 Q4.pdf3 Aug 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf25 Jun 2022
CERSAI detailsFile: CERSAI_Search_Report_200240425900_For_Asset_Based_Search_23_06_2022_12_51_17_603.pdf23 Jun 2022
Certificates of CA (Form 3)File: Form 3 Q3.pdf2 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf29 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf11 Apr 2022
Declaration about Commencement CertificateFile: Declaration of CC.pdf13 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 2020.pdf13 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 2021.pdf13 Jan 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY 1compressed.pdf13 Jan 2022
Disclosure of sold/ booked inventoryFile: SOLDUNSOLD INVENTORY 2compressed.pdf13 Jan 2022
Building plan approvalFile: 1 OF 5.pdf4 Dec 2021
Building plan approvalFile: 2 OF 5.pdf4 Dec 2021
Building plan approvalFile: 3 OF 5.pdf4 Dec 2021
Building plan approvalFile: 4 OF 5.pdf4 Dec 2021
Building plan approvalFile: 5 OF 5.pdf4 Dec 2021
Building Plan Approval (IOD)File: 1 OF 5.pdf4 Dec 2021
Building Plan Approval (IOD)File: 2 OF 5.pdf4 Dec 2021
Building Plan Approval (IOD)File: 3 OF 5.pdf4 Dec 2021
Building Plan Approval (IOD)File: 4 OF 5.pdf4 Dec 2021
Building Plan Approval (IOD)File: 5 OF 5.pdf4 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: C C SCAN.pdf4 Dec 2021
Certificates of CA (Form 5)File: Yes Residency_form5.pdf23 Apr 2021
Certificates of CA (Form 3)File: FORM 3_compressed.pdf31 Mar 2021
Certificates of CA (Form 3)File: FORM 3 Q2 Yes Residency-compressed.pdf22 Feb 2021
Certificates of CA (Form 3)File: Form3_YS_Q1.pdf3 Oct 2020
Certificates of CA (Form 3)File: RERA Certificate Yes Residency_compressed.pdf2 Jan 2020
Certificates of CA (Form 3)File: Yes Residency - Q4 (1)_compressed.pdf24 Oct 2019
Certificates of CA (Form 3)File: Yes Residency - Q1 (1)_compressed.pdf24 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf29 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf29 Mar 2019
Certificates of CA (Form 3)File: Yes Residency Form 3_Q3_compressed.pdf29 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q1.pdf27 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf27 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Q1.pdf27 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf27 Dec 2018
Certificates of CA (Form 3)File: Form 3 Q2.pdf27 Dec 2018
Certificates of CA (Form 5)File: Form 5.pdf21 Dec 2018
Commencement Certificates / NA Order for plotted developmentFile: hadapsar commencement.PDF23 Apr 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Q3-.pdf30 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-Q3-.pdf30 Mar 2018
Certificates of CA (Form 3)File: Form3-Q3.pdf30 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf30 Dec 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf30 Dec 2017
Certificates of CA (Form 3)File: FORM 3.pdf30 Dec 2017
Certificates of CA (Form 3)File: Form 3 Pdf.pdf4 Aug 2017
Building plan approvalFile: Yes Residency1.pdf3 Aug 2017
Building plan approvalFile: Yes Residency2.pdf3 Aug 2017
Layout approvalFile: Yes Residency2.pdf3 Aug 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 66 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Yes Residency on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hadapsar13,700+ in Pune

2 kmYes ResidencyCompleted 34Lapsed / revoked 14Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 86 registered projects within 2 km.

Builder: Yemul& Sancheti Associates

Yemul& Sancheti Associates has 2 registrations on MahaRERA, including Yes Residency and Peshwai Enclave. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Yes Residency is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yes Residency?

The registered promoter entity is Yemul& Sancheti Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yes Residency?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Yes Residency?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Yes Residency?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yes Residency?

The professionals named in the filing: Architect: Prakash Kulkarni; Chartered Accountant: Aditya Patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yes Residency?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yes Residency. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yes Residency to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.