Home / Browse projects / Pune, Maharashtra / Yashwin SukhNiwas

Completed No litigation declared Residential / Group Housing project

Yashwin SukhNiwas

By GROWISA ADVISORS

RG-MH-16460 · RERA P52100025982 · Last updated on MahaRERA portal: 16 Sep 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
33 of 44Construction stages doneacross 4 buildings; furthest along: External plumbing and external plaster, 98%
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

Yashwin SukhNiwas is a Residential / Group Housing project by GROWISA ADVISORS in Pune, Maharashtra, registered with MahaRERA as P52100025982 on 7 Aug 2020. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameYashwin SukhNiwas
  • TypeResidential / Group Housing
  • Location
    • Maan
    • Hinjawadi
    • Man
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100025982
  • ReraGenie IDRG-MH-16460

Builder

  • NameGROWISA ADVISORS
  • Entity typePartnership
  • PartnerGHANSHYAM JANGALDAS SUKHWANI

Key dates

this monthRegisteredAug 2020PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Aug 2020
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings4 building records
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A - upto 13 floors sanctionedNA140000
Building B - upto 13 floors sanctionedNA140000
Building C - upto 13 floors sanctioned, 14th floor proposedNA150000
Building D - upto 13th floors sanctioned, 14th floor proposeNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 16 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is External plumbing and external plaster, at 98%.

Building A - upto 13 floors sanctioned91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building B - upto 13 floors sanctioned91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building C - upto 13 floors sanctioned, 14th floor proposed90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.96%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Building D - upto 13th floors sanctioned, 14th floor propose89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 16 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes95%
Street LightingYes85%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes90%
Open ParkingYes90%

Parking filed105

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots105
Closed/Covered79
Open Space26
BuildingClosed/CoveredOpen SpaceTotal
Building A - upto 13 floors sanctioned21728
Building B - upto 13 floors sanctioned21728
Building C - upto 13 floors sanctioned, 14th floor proposed20626
Building D - upto 13th floors sanctioned, 14th floor propose17623

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,264 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
VILAS JAVDEKAR ECO HOMESKothrudPune

Approvals and building plan

Permissible FSI14790.0
Proposed, not sanctioned13,003 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEx Servicemen Colony 48, Paud Phata, Pune 411038

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Vishwas Kulkani/ Ar. Hrshikesh Kulkarni
ArchitectSameer Murari Valimbe
EngineerSarvesh Javdekar
Chartered AccountantR.V. Nevatiya
Chartered AccountantSupriya Abhijit Mundada
PartnerRole in project
GROWISA ADVISORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Apr 2023

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: GROWISA ADVISORS RERA NUMBER P52100025982.pdf16 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion_YSNW_Building A and B.pdf15 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion -YSNW - Building C and D_14102022.pdf15 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Yashwin Sukhniwas Completion Certificate 2 units_24032023.pdf15 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: Sukhniwas_Form4.pdf7 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Yashwin Sukhniwas Certificate A.pdf5 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Yashwin Sukhniwas Certificate B.pdf5 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Yashwin Sukhniwas Society Certificate C.pdf5 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Yashwin Sukhniwas Certificate D .pdf5 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Yashwin SukhNiwas_Archi_Sept 2022.pdf7 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng_Cert_Sukhniwas_Sep22.pdf6 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Sukhniwas.pdf14 Oct 2022
Disclosure of sold/ booked inventoryFile: SI_YASHWIN SUKHNIWAS_compressed.pdf10 Aug 2022
OtherFile: YASH SHUKNIWAS.pdf14 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A Yashwin SukhNiwas Sept 21.pdf9 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Y SukhNiwas_Form 5_2020 - 2021.pdf2 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SukhNiwas_June2021_compressed.pdf31 Jul 2021
OtherFile: Growisa_Survey number update letter.pdf24 Jul 2021
Proforma of Allotment letterFile: Revised ATS for SukhNiwas_05062021.pdf5 Jun 2021
Disclosure of sold/ booked inventoryFile: Yashwin SukhNiwas_compressed.pdf29 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Yashwin SukhNiwas_March 2021.pdf13 Apr 2021
Layout approvalFile: Layout Revised.pdf8 Apr 2021
Building plan approvalFile: Typical floor plan.pdf8 Apr 2021
Copy of Layout Approval (in case of layout)File: Layout Revised.pdf8 Apr 2021
Building Plan Approval / NA Order for plotted developmentFile: Typical floor plan.pdf8 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf8 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Yashwin SulhNiwas_Dec 20200001.pdf5 Feb 2021
OtherFile: Yashwin Sukhniwas_RERA Clarifications.pdf13 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Yashwin SukhNiwas_Sept 2020_compressed.pdf8 Oct 2020
Building plan approvalFile: Typical Floor_A_06102020.pdf7 Oct 2020
Building plan approvalFile: Typical Floor_B_06102020.pdf7 Oct 2020
Building plan approvalFile: Typical Floor_C_06102020.pdf7 Oct 2020
Building plan approvalFile: Typical Floor_D_06102020.pdf7 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Typical Floor_A_06102020.pdf7 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Typical Floor_B_06102020.pdf7 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Typical Floor_C_06102020.pdf7 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Typical Floor_D_06102020.pdf7 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: CC_06102020.pdf7 Oct 2020
Building plan approvalFile: Elevation - A and B wing.PDF1 Aug 2020
Building plan approvalFile: Terrace Floor - A and B wing.PDF1 Aug 2020
Layout approvalFile: 4 Master Layout.PDF1 Aug 2020
Building plan approvalFile: 9 A and B wing - Typical Floor.PDF1 Aug 2020
PAN CardFile: Growisa Advisors-Pan card.pdf1 Aug 2020
Copy of the legal title reportFile: 2 TSR_Growisa.pdf1 Aug 2020
Details of encumbrancesFile: 3 Encumberance letter_Growisa.pdf1 Aug 2020
Copy of Layout Approval (in case of layout)File: 4 Master Layout.PDF1 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: 9 A and B wing - Typical Floor.PDF1 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Elevation - A and B wing.PDF1 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: Terrace Floor - A and B wing.PDF1 Aug 2020
Commencement Certificates / NA Order for plotted developmentFile: 8 Commencement Certificate_Growisa.pdf1 Aug 2020
Declaration in FORM BFile: 6 Form B_Growisa.pdf1 Aug 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 CA certificate_Growisa.pdf1 Aug 2020
Proforma of Allotment letterFile: 5 ATS_Growisa.pdf1 Aug 2020
Proforma of Allotment letterFile: 5 Allotment Letter_Growisa.pdf1 Aug 2020
OtherFile: 10 ATS Confirmation letter_Growisa.pdf1 Aug 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Yashwin SukhNiwas on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjawadi13,700+ in Pune

2 kmYashwin SukhNiwasCompleted 34Lapsed / revoked 18Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 98 registered projects within 2 km.

Builder: GROWISA ADVISORS

GROWISA ADVISORS has 1 registration on MahaRERA, including Yashwin SukhNiwas. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Yashwin SukhNiwas is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yashwin SukhNiwas?

The registered promoter entity is GROWISA ADVISORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yashwin SukhNiwas?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Yashwin SukhNiwas?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yashwin SukhNiwas?

The professionals named in the filing: Architect: Ar. Vishwas Kulkani/ Ar. Hrshikesh Kulkarni; Architect: Sameer Murari Valimbe; Engineer: Sarvesh Javdekar; Chartered Accountant: R.V. Nevatiya; Chartered Accountant: Supriya Abhijit Mundada. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yashwin SukhNiwas?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yashwin SukhNiwas. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yashwin SukhNiwas to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.