Home / Browse projects / Pune, Maharashtra / Yashwin NuovoCentro

Completed No litigation declared Others project

Yashwin NuovoCentro

By Vilas Javdekar Lifestyle Developers Pvt. Ltd.

RG-MH-52620 · RERA P52100034523 · Last updated on MahaRERA portal: 29 Oct 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
30 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 80%
7 of 284Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 208 documents Report an error

Yashwin NuovoCentro is a Others project by Vilas Javdekar Lifestyle Developers Pvt. Ltd. in Pune, Maharashtra, registered with MahaRERA as P52100034523 on 11 Apr 2022. The registration is recorded completed; possession was promised by 30 Jun 2026. 277 of the 284 units on this registration are recorded sold or booked, and 30 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameYashwin NuovoCentro
  • TypeOthers
  • Location
    • Shankar Kalate Marg
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100034523
  • ReraGenie IDRG-MH-52620

Builder

  • NameVilas Javdekar Lifestyle Developers Pvt. Ltd.
  • Entity typeCompany
  • CINU45200PN2012PTC144265
  • GSTIN27AAECV1331J1ZE
  • Managing DirectorSarvesh Vilas Javdekar
  • Other registrations5 more →
  • Completed5 of 6
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2022PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Apr 2022
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed208 files

Current status

98%277 of 284 units booked
74.3%Work done, per cost certificate

Figures as on 29 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building BNA32281250125
Building ANA32281510151
Building CommercialNA22088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 29 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 80%.

Building B98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Building A98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Building Commercial91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes70%
Street LightingYes100%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes80%

Parking filed1264

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,264
Closed/Covered1,264
BuildingClosed/CoveredTotal
Building B460460
Building A701701
Building Commercial103103

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,933 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Sep 2025
LandownerVillageDistrict
M/s PrimespaceKothrudPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI35600.0
Proposed, not sanctioned35,452 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKothrud,Pune 411038
Estimated costRs 139.80 cr
Cost incurredRs 103.87 cr
Work done74.3%
BuildingWingEstimatedIncurred
Building ANARs 54.53 crRs 48.00 cr
Building BNARs 45.86 crRs 38.57 cr
-NARs 33.29 crRs 11.30 cr
Building CommercialNARs 6.12 crRs 6.00 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSameer Murari Valimbe
ArchitectDeepali Patidar
ArchitectAsad Jawed Ahmed
ArchitectPrajakta yadav
EngineerSagar Kale
Chartered AccountantAbhijit Mundada
Chartered AccountantSunil Shamrao Nimbalkar
PartnerRole in project
Vilas Javdekar Lifestyle Developers Pvt. Ltd.-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12603180SANYOGITA Aashish PAREKHVilas Javdekar Lifestyle Developers Pvt. Ltd.28/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed208

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 208 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: YNC_Part Completion Certificate_ A & B Wing_Dated- 09102025.pdf29 Oct 2025
Occupational CertificateFile: YNC_Completion Certificate_ Shops & IHP_Dated- 29082025.pdf29 Oct 2025
Withdrawal Update Form 1File: Architect certificate YNC 30-09-25.pdf11 Oct 2025
Withdrawal Update Form 2File: Engineer certificate YNC 30-09-25.pdf11 Oct 2025
Withdrawal Update Form 3File: CA certificate YNC 30-09-25.pdf11 Oct 2025
Form 5 (FY 2024-2025)File: VJLDPL_Form 5_P52100034523_YNC.pdf30 Sep 2025
Withdrawal Update Form 1File: Architech Certificate YNC 30-06-25.pdf18 Aug 2025
Withdrawal Update Form 2File: Engineer Certificate YNC 2 30-06-25.pdf18 Aug 2025
Withdrawal Update Form 3File: YNC CA Certificate signed Updated.pdf18 Aug 2025
Form 2A (FY 2024-2025)File: YNC_Form2A_31032025_Signed.pdf26 Jun 2025
Form 1File: YNC_Architect_31032025_Signed.pdf6 May 2025
Form 2File: YNC_Engineer_31032025_Signed.pdf6 May 2025
Form 3File: CA certificate (Form 3)_Nuovo Centro_ Combined Signed_.pdf6 May 2025
Disclosure of Sold and Booked InventoryFile: YNC_Sold Inventory_31032025_Signed.pdf6 May 2025
OthersFile: YNC_Form2A_31032025_Signed.pdf6 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: YNC_Form2A_31032025_Signed.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: YNC_Architect_31032025_Signed.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate (Form 3)_Nuovo Centro_ Combined Signed_.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: YNC_Engineer_31032025_Signed.pdf22 Apr 2025
Disclosure of sold/ booked inventoryFile: YNC_Sold Inventory_31032025_Signed.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate YNC 1 18-03-25_signed.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Nuovo Centro combined_signed.pdf20 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate YNC 1 18-03-25_signed.pdf20 Mar 2025
Layout approvalFile: 01- Layout_compressed.pdf22 Jan 2025
Layout approvalFile: 01- Layout_compressed.pdf22 Jan 2025
Building plan approvalFile: 02- Basement Plan_compressed.pdf22 Jan 2025
Building plan approvalFile: 03- Ground Floor_compressed.pdf22 Jan 2025
Building plan approvalFile: 04- Mezzanine Floor_compressed.pdf22 Jan 2025
Building plan approvalFile: 05- Wing A_B_Club House_compressed.pdf22 Jan 2025
Building plan approvalFile: 06- Wing A,B_Club House_compressed.pdf22 Jan 2025
Building plan approvalFile: 07- Wing A,B_Club House_compressed.pdf22 Jan 2025
Building plan approvalFile: 08- Wing A,B_Club House_compressed.pdf22 Jan 2025
Building plan approvalFile: 09- Wing A,B_compressed.pdf22 Jan 2025
Building plan approvalFile: 10- Wing A,B_compressed.pdf22 Jan 2025
Building plan approvalFile: 11- Wing A,B_compressed.pdf22 Jan 2025
Building plan approvalFile: 12- Wing A,B_compressed.pdf22 Jan 2025
Building plan approvalFile: 13- Wing A,B_compressed.pdf22 Jan 2025
Building plan approvalFile: 14- Wing A,B_compressed.pdf22 Jan 2025
Building plan approvalFile: 02- Basement Plan_compressed.pdf22 Jan 2025
Building plan approvalFile: 03- Ground Floor_compressed.pdf22 Jan 2025
Building plan approvalFile: 04- Mezzanine Floor_compressed.pdf22 Jan 2025
Building plan approvalFile: 05- Wing A,B,Club House_compressed.pdf22 Jan 2025
Building plan approvalFile: 06- Wing A,B,Club House_compressed.pdf22 Jan 2025
Building plan approvalFile: 07- Wing A,B,Club House_compressed.pdf22 Jan 2025
Building plan approvalFile: 08- Wing A,B,Club House_compressed.pdf22 Jan 2025
Building plan approvalFile: 09- Wing A and B_compressed.pdf22 Jan 2025
Building plan approvalFile: 10- Wing A and B_compressed.pdf22 Jan 2025
Building plan approvalFile: 11- Wing A and B_compressed.pdf22 Jan 2025
Building plan approvalFile: 12- Wing A and B_compressed.pdf22 Jan 2025
Building plan approvalFile: 13- Wing A and B_compressed.pdf22 Jan 2025
Building plan approvalFile: 14- Wing A and B_compressed.pdf22 Jan 2025
Copy of Layout Approval (in case of layout)File: 01- Layout_compressed.pdf22 Jan 2025
Copy of Layout Approval (in case of layout)File: 01- Layout_compressed.pdf22 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Dated -12072024_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 14- Wing A,B_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 03- Ground Floor_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 04- Mezzanine Floor_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 05- Wing A,B,Club House_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 06- Wing A,B,Club House_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 07- Wing A,B,Club House_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 08- Wing A,B,Club House_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 09- Wing A and B_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 10- Wing A and B_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 11- Wing A and B_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 12- Wing A and B_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 13- Wing A and B_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 14- Wing A and B_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 13- Wing A,B_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 02- Basement Plan_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 03- Ground Floor_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 04- Mezzanine Floor_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 05- Wing A_B_Club House_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 06- Wing A,B_Club House_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 07- Wing A,B_Club House_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 08- Wing A,B_Club House_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 09- Wing A,B_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 10- Wing A,B_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 11- Wing A,B_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 12- Wing A,B_compressed.pdf22 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 02- Basement Plan_compressed.pdf22 Jan 2025

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Yashwin EncoreS No 146 1A 1 to 5 Wakad Pune 411057518CompletedDec 2023Jun 2022
MHADA Yashwin EncoreS No 146 1A 1 Binsheti Part Wakad Pune 41105764CompletedDec 2023Oct 2021
PortiaS.NO. 270 1 11 PALLOD FARM IN FRONT OF BHARAT PETROLEUM PETROL PUMP BANER PUNE 41104532CompletedDec 2018Late, Sep 2019

How this compares with Pune

98%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Yashwin NuovoCentro on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wakad13,700+ in Pune

2 kmYashwin NuovoCentroCompleted 152Lapsed / revoked 57Other 89Dot size: filed unitsN

Filed coordinates, straight-line distance. 298 registered projects within 2 km.

Builder: Vilas Javdekar Lifestyle Developers Pvt. Ltd.

Vilas Javdekar Lifestyle Developers Pvt. Ltd. has 6 registrations on MahaRERA, including Portia and Yashwin Encore. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Yashwin NuovoCentro is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Yashwin NuovoCentro?

The registered promoter entity is Vilas Javdekar Lifestyle Developers Pvt. Ltd., a company as per the filing. Its CIN U45200PN2012PTC144265 and GSTIN 27AAECV1331J1ZE can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Yashwin NuovoCentro?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Yashwin NuovoCentro?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Yashwin NuovoCentro?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Yashwin NuovoCentro?

The professionals named in the filing: Architect: Sameer Murari Valimbe; Architect: Deepali Patidar; Architect: Asad Jawed Ahmed; Architect: Prajakta yadav; Engineer: Sagar Kale; Chartered Accountant: Abhijit Mundada. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Yashwin NuovoCentro?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Yashwin NuovoCentro. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Yashwin NuovoCentro to a free account