Home / Browse projects / Pune, Maharashtra / YASHWIN HINJAWADI

Completed No litigation declared Others project

YASHWIN HINJAWADI

By Vilas Javdekar Eco Shelters Private Limited

RG-MH-01289 · RERA P52100000037 · Last updated on MahaRERA portal: 13 Dec 2024

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
48 of 55Construction stages doneacross 5 buildings; furthest along: Staircases, 95%
2Complaints at MahaRERAon this registration
Jump to the 176 documents Report an error

YASHWIN HINJAWADI is a Others project by Vilas Javdekar Eco Shelters Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100000037 on 16 Jun 2017. The registration is recorded completed; possession was promised by 30 Jun 2025. 2 complaints are on record with the regulator.

At a glance

Project

  • NameYASHWIN HINJAWADI
  • TypeOthers
  • Location
    • HINJAWADI
    • Man
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000037
  • ReraGenie IDRG-MH-01289

Builder

  • NameVilas Javdekar Eco Shelters Private Limited
  • Entity typeCompany
  • CINU45200PN2013PTC146349
  • GSTIN27AAECV3556D1ZC
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorAditya Vilas Javdekar
  • Other registrations8 more →
  • Completed9 of 9
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2017PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Jun 2017
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings5 building records
  • Documents filed176 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Yashwin Hinjawadi ANA230000
Yashwin Hinjawadi DNA230000
Yashwin Hinjawadi CNA230000
Yashwin Hinjawadi BNA230000
VJ Happiness StreetNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 13 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

48 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Staircases, at 95%.

Yashwin Hinjawadi A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Yashwin Hinjawadi D100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Yashwin Hinjawadi C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Yashwin Hinjawadi B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
VJ Happiness Street73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities15

As on 13 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes80%
Street LightingYes90%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes85%
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes90%
Open ParkingYes90%

Parking filed982

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots982
Closed/Covered561
Open Space421
BuildingClosed/CoveredOpen SpaceTotal
Yashwin Hinjawadi A14037177
Yashwin Hinjawadi D13337170
Yashwin Hinjawadi C13337170
Yashwin Hinjawadi B14238180
VJ Happiness Street13272285

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area40,820 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI61588.47
Proposed, not sanctioned61,588 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSarthak Terraces, Kothrud, Pune 411029

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Vilas Javdekar Eco Shelters Private Limited-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12604052Abhishek Arvind KumarVilas Javdekar Eco Shelters Private Limited29/06/2026
CC12604159Anand Kumar MishraVilas Javdekar Eco Shelters Private Limited03/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 13 Dec 2024

Documents filed176

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 176 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 240808_VJ HS RHS Part Completion Certificate dated 08-08-2024.pdf13 Dec 2024
Other - TechnicalFile: YH_Form 4_07122024.pdf13 Dec 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: VJHS- Society Registration Certificate.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECH YASHWIN HINJAWADI_signed.pdf22 Oct 2024
Certificates of CA (Form 3)File: CA Certificate_YH_signed_compressed.pdf22 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER YH_signed.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY YASHWIN SUPERNOVA-signed.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY VJ HPS-signed.pdf22 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 1_Form 5 VJ Yashwin Hinjawadi_promoter name missing_signed.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: Inventory_YH_30062024_signed.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY YASHWIN HINJAWADI_signed.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1_Form 2A_YH_31032024.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1_Form 2A_YH_31032024.pdf15 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer_certificate_yashwin_hinjawadi_signed.pdf13 Jul 2024
Certificates of CA (Form 3)File: CA Certificate_YH_signed.pdf13 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_certificate_Yashwin_Hinjawadi_signed.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: VJHS_Inventory_31032024_signed_compressed.pdf20 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1_Architect_YH_AJ_31032024_signed.pdf15 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1_Engineer Certificate_YH_signed.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1_Form 2A_YH_31032024.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: 1_YH_Inventory_31032024_signed.pdf15 Apr 2024
Certificates of CA (Form 3)File: 1_CA Certificate_YH_signed_compressed.pdf15 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 12 shops OC dated 03-10-2022.pdf11 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: VJ HS LHS coliving OC dated 14102022.pdf11 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: S No 286 Maan-VJ HS RHS -Eating House Shop NO 13 14 15 16 OC_16062023.pdf11 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: VJ HS RHS Part Completion Certificate dated 22-12-2023.pdf11 Apr 2024
Layout approvalFile: 01- Layout_compressed.pdf10 Apr 2024
Building plan approvalFile: 02- Basement-02 and Basement-01_compressed.pdf10 Apr 2024
Building plan approvalFile: 03- Ground Floor (Commercial and Commercial and Multiplex)_compressed.pdf10 Apr 2024
Building plan approvalFile: 04- 1st Floor and Typical Floor (Commercial)_compressed.pdf10 Apr 2024
Building plan approvalFile: 05- 6th Floor and Terrace Floor (Commercial)_compressed.pdf10 Apr 2024
Building plan approvalFile: 06- Mezzanine and 1st Floor (Commercial and Multiplex)_compressed.pdf10 Apr 2024
Building plan approvalFile: 07- 2nd 3rd and Terrace Floor (Commercial and Multiplex)_compressed.pdf10 Apr 2024
Copy of the legal title reportFile: 01- Layout_compressed.pdf10 Apr 2024
Copy of Layout Approval (in case of layout)File: 01- Layout_compressed.pdf10 Apr 2024
Building Plan Approval (IOD)File: 02- Basement-02 and Basement-01_compressed.pdf10 Apr 2024
Building Plan Approval (IOD)File: 03- Ground Floor (Commercial and Commercial and Multiplex)_compressed.pdf10 Apr 2024
Building Plan Approval (IOD)File: 04- 1st Floor and Typical Floor (Commercial)_compressed.pdf10 Apr 2024
Building Plan Approval (IOD)File: 05- 6th Floor and Terrace Floor (Commercial)_compressed.pdf10 Apr 2024
Building Plan Approval (IOD)File: 06- Mezzanine and 1st Floor (Commercial and Multiplex)_compressed.pdf10 Apr 2024
Building Plan Approval (IOD)File: 07- 2nd 3rd and Terrace Floor (Commercial and Multiplex)_compressed.pdf10 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Dated- 13032024_compressed.pdf10 Apr 2024
Declaration about Commencement CertificateFile: Yashwin Hinjawadi_CC declaration_13032024_signed.pdf10 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 12 Architect_YH_31122023.pdf15 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Engineer Certificate_YH.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: 12 Sold Unsold_YH_31122023_signed.pdf15 Jan 2024
Certificates of CA (Form 3)File: 12 CA Certificate_YH_compressed.pdf15 Jan 2024
Declaration about Commencement CertificateFile: YH_CC declaration_signed.pdf19 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_YH_signed.pdf10 Oct 2023
Certificates of CA (Form 3)File: CA Certificate_YH_compressed.pdf10 Oct 2023
Disclosure of sold/ booked inventoryFile: YH_compressed.pdf9 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect_YH_Sept 2023_signed.pdf7 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: VJESPL RERA NUMBER P52100000037_YH.pdf5 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: VJESPL RERA NUMBER P52100000037_YH.pdf5 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer- YH.pdf22 Jul 2023
Certificates of CA (Form 3)File: CA-YH_compressed.pdf22 Jul 2023
Disclosure of sold/ booked inventoryFile: Yashwin_ Hinjawadi Sold Unsold_compressed.pdf14 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Yashwin_hinjawadi_june23.pdf12 Jul 2023
OtherFile: YH.pdf12 May 2023
Layout approvalFile: 01_compressed_compressed.pdf6 May 2023
Building plan approvalFile: 02_compressed.pdf6 May 2023
Building plan approvalFile: 03_compressed.pdf6 May 2023
Building plan approvalFile: 03_compressed.pdf6 May 2023
Building plan approvalFile: 04_compressed.pdf6 May 2023
Building plan approvalFile: 05_compressed.pdf6 May 2023
Building plan approvalFile: 06_compressed.pdf6 May 2023
Building plan approvalFile: 07_compressed.pdf6 May 2023
Building plan approvalFile: 09_compressed.pdf6 May 2023
Copy of Layout Approval (in case of layout)File: 01_compressed_compressed.pdf6 May 2023
Building Plan Approval (IOD)File: 02_compressed.pdf6 May 2023
Building Plan Approval (IOD)File: 03_compressed.pdf6 May 2023
Building Plan Approval (IOD)File: 03_compressed.pdf6 May 2023
Building Plan Approval (IOD)File: 04_compressed.pdf6 May 2023
Building Plan Approval (IOD)File: 05_compressed.pdf6 May 2023
Building Plan Approval (IOD)File: 06_compressed.pdf6 May 2023
Building Plan Approval (IOD)File: 07_compressed.pdf6 May 2023
Building Plan Approval (IOD)File: 09_compressed.pdf6 May 2023
Commencement Certificates / NA Order for plotted developmentFile: CC_Dated-26042033_compressed.pdf6 May 2023
Declaration about Commencement CertificateFile: CC DeclarationVJ Happiness Street.pdf6 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: YH_compressed.pdf19 Apr 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PrudentiaSurvey no 173 2 2A 3 and 173 2 2A 4 Near Datta Mandir Wakad Taluka Mulshi District Pune 411057133CompletedJun 2019May 2019
Palash Boulevard Phase 1Gat No 510 Pirangut Tal Mulshi Dist Pune188CompletedSep 2017Apr 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YASHWIN HINJAWADI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near HINJAWADI13,700+ in Pune

2 kmYASHWIN HINJAWADICompleted 20Lapsed / revoked 7Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: Vilas Javdekar Eco Shelters Private Limited

Vilas Javdekar Eco Shelters Private Limited has 9 registrations on MahaRERA, including YASHWIN HINJAWADI and Prudentia - Phase 1. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if YASHWIN HINJAWADI is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YASHWIN HINJAWADI?

The registered promoter entity is Vilas Javdekar Eco Shelters Private Limited, a company as per the filing. Its CIN U45200PN2013PTC146349 and GSTIN 27AAECV3556D1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YASHWIN HINJAWADI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against YASHWIN HINJAWADI?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for YASHWIN HINJAWADI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in YASHWIN HINJAWADI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YASHWIN HINJAWADI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YASHWIN HINJAWADI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.