ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / YASHWANT NIWAS

Registered No litigation declared Residential / Group Housing project

YASHWANT NIWAS

By VIJAYRAJ DEVELOPERS LLP

RG-MH-18041 · RERA P51700077327 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
13 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

YASHWANT NIWAS is a Residential / Group Housing project by VIJAYRAJ DEVELOPERS LLP in Thane, Maharashtra, registered with MahaRERA as P51700077327 on 6 Aug 2024. Possession is promised by 31 Mar 2027. 11 of the 24 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameYASHWANT NIWAS
  • TypeResidential / Group Housing
  • Location
    • MAHARSHI KARVE ROAD
    • NAUPADA
    • Thane (M Corp.)
    • Thane
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700077327
  • ReraGenie IDRG-MH-18041

Builder

  • NameVIJAYRAJ DEVELOPERS LLP
  • Entity typePartnership
  • GSTIN27AARFV7711N1ZB
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersMALAY VIJAY YEOLEKAR, VIJAY CHINTAMAN YEOLEKAR
  • Other registrations4 more →
  • Completed2 of 5
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Aug 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed54 files

Current status

46%11 of 24 units booked
92.5%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
YASHWANT NIWASNA131318624

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

YASHWANT NIWAS: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed48

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots48
Closed/Covered24
Open Space24

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area596 sq m
Land owned byNot the promoter
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Jul 2025
LandownerVillageDistrict
Chandrika Deepesh KaneThane (M Corp.)Thane
Rajendra Deepesh KaneThane (M Corp.)Thane
Dwijendra Deepesh KaneThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation Thane
Permissible FSI2078.04
Proposed, not sanctioned2,078 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKONKAN NAGAR CHS LTD P N KOTNIS MARG OPPOSITE FIRE BRIGADE, MAHIM WEST MUMBAI 400016
Estimated costRs 8.50 cr
Cost incurredRs 7.86 cr
Work done92.45%
BuildingWingEstimatedIncurred
YASHWANT NIWASNARs 6.22 crRs 6.83 cr
-NARs 2.28 crRs 1.03 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectULHAS PRADHAN & ASSOCIATES
EngineerHIRANYAKUMAR N DOSHI
Chartered AccountantSHYAM PRAJAPATI & ASSOCIAYES
PartnerRole in project
VIJAYRAJ DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf17 Jun 2026
Withdrawal Update Form 2File: Engineers Certificate (6).pdf17 Jun 2026
Withdrawal Update Form 3File: Form 3 C A Certificate.pdf17 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf6 Feb 2026
Withdrawal Update Form 2File: Engineers Certificate (6).pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3 C A Certificate.pdf6 Feb 2026
Withdrawal Update Form 1File: Architect Certificate_Q2.pdf6 Nov 2025
Withdrawal Update Form 2File: Engineers Certificate_Q2.pdf6 Nov 2025
Withdrawal Update Form 3File: CA Certificate_Q2.pdf6 Nov 2025
Withdrawal Update Form 1File: Form 1.pdf20 Jul 2025
Withdrawal Update Form 2File: Form 2.pdf20 Jul 2025
Withdrawal Update Form 3File: Form 3.pdf20 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Booked Units-Signed Copy.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect_Certificate_Q4.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Certificate_Q4.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers_Certificate_Q4.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 C A Certificate.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certtificate.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclousre of Sold and Booked Units.pdf23 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf31 Jul 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A yashwant niwas.pdf31 Jul 2024
Proforma of Agreement for saleFile: Agreement to Sell as per RERA Act - Final.pdf12 Jul 2024
Proforma of Allotment letterFile: Allottment Letter - New.pdf12 Jul 2024
Deviation Report with respect to Allotment letterFile: No Deviation Allotment.pdf12 Jul 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation Agt.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf17 Jun 2024
Other - LegalFile: REGISTERED P O A THANE.pdf12 Jun 2024
Other - LegalFile: REGISTERED D A THANE_compressed.pdf12 Jun 2024
Other - TechnicalFile: ANNEXURE A DECLARATION CUM UNDERTAKING.pdf7 Jun 2024
Layout approvalFile: SANCTION PLAN 12TH FLOOR.pdf30 Apr 2024
Copy of Layout Approval (in case of layout)File: SANCTION PLAN 12TH FLOOR.pdf30 Apr 2024
CERSAI detailsFile: Cersai details.pdf30 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTEREST.pdf27 Apr 2024
Copy of the legal title reportFile: Title Certificate Report - Format A.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE YASHWANT NIWAS.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engeers-certificate.pdf18 Apr 2024
Details of encumbrances concerned to FinanceFile: SELF DECLARATION YASHWANT NIWAS.pdf13 Apr 2024
Details of encumbrances concerned to LegalFile: SELF DECLARATION YASHWANT NIWAS.pdf13 Apr 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT C C.pdf13 Apr 2024
Declaration in FORM BFile: Affidavit cum declaration RERA Yashwant niwas.pdf13 Apr 2024
Declaration in FORM BFile: REGISTERED D A THANE.pdf13 Apr 2024
Layout approvalFile: SANCTION PLAN 12TH FLOOR SECTION.pdf2 Apr 2024
Building plan approvalFile: SANCTION PLAN 12TH FLOOR.pdf2 Apr 2024
Building plan approvalFile: SANCTION PLAN 12TH FLOOR SECTION.pdf2 Apr 2024
PAN CardFile: PAN CARD VDLLP.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: SANCTION PLAN 12TH FLOOR SECTION.pdf2 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN 12TH FLOOR.pdf2 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: SANCTION PLAN 12TH FLOOR SECTION.pdf2 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: C C GROUND TO 12TH FLOOR.pdf2 Apr 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
MADHU MADHURA CHS LTDF P 11 TPS V PRARTHANA SAMAJ ROAD VILE PARLE EAST MUMBAI 40005732CompletedSep 2021Sep 2018
ROOPALI VILE PARLE CHS LTDF P 143 TPS V ANANT WAMAN VARTAK MARG VILE PARLE EAST MUMBAI 40005732CompletedMar 2016Late, Mar 2016

How this compares with Thane

46%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YASHWANT NIWAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAUPADA7,600+ in Thane

2 kmYASHWANT NIWASCompleted 98Lapsed / revoked 69Other 133Dot size: filed unitsN

Filed coordinates, straight-line distance. 300 registered projects within 2 km.

Builder: VIJAYRAJ DEVELOPERS LLP

VIJAYRAJ DEVELOPERS LLP has 5 registrations on MahaRERA, including ALOK SAHANIWAS CHS LTD AND ALOK APARTMENT CHS LTD and GOPADMA CHS LTD. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if YASHWANT NIWAS is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YASHWANT NIWAS?

The registered promoter entity is VIJAYRAJ DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27AARFV7711N1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YASHWANT NIWAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for YASHWANT NIWAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YASHWANT NIWAS?

The professionals named in the filing: Architect: ULHAS PRADHAN & ASSOCIATES; Engineer: HIRANYAKUMAR N DOSHI; Chartered Accountant: SHYAM PRAJAPATI & ASSOCIAYES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YASHWANT NIWAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YASHWANT NIWAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YASHWANT NIWAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.