Home / Browse projects / Thane, Maharashtra / YASHREE
YASHREE
RG-MH-03255 · RERA P51700021165 · Last updated on MahaRERA portal: 1 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 60 months
- 4 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
YASHREE is a Residential / Group Housing project by LGS DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700021165 on 14 Jun 2019. Possession is promised by 31 Mar 2028. The completion date has moved by 60 months from the original filing. 11 of the 73 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameYASHREE
- TypeResidential / Group Housing
- Location
- PIPELINE ROAD DHOKALI
- NEAR TMC OFFICE THANE WEST
- Thane (M Corp.)
- Thane
- 400607
- Pincode400607
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700021165
- ReraGenie IDRG-MH-03255
Builder
- NameLGS DEVELOPERS
- Entity typePartnership
- PartnerPRAKASH SHAMJI BARVADIYA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Jun 2019
- Promised completion31 Mar 2028
- Revised completionRevised to 31 Mar 2028 (originally 30 Mar 2023)
- Buildings1 building record
- Documents filed74 files
Current status
Figures as on 1 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| YASHREE | NA | 21 | 20 | 73 | 0 | 73 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
YASHREE: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25% |
Progress on shared amenities15
As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed19
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| YASHREE | NA | Rs 17.31 cr | Rs 13.85 cr |
| - | NA | Rs 1.50 cr | Rs 25.00 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AKRUTI CONSULTANTS |
| Architect | RIGHT SPACE CONSULTANTS |
| Engineer | VINAYAK CHOPDEKAR & ASSOCIATES |
| Chartered Accountant | HARSHADA TAWDE |
| Chartered Accountant | Jiyan Shah & Co |
| Chartered Accountant | MANISH MOTILAL YADAC |
| Chartered Accountant | MMY & ASSOCIATES |
| Partner | Role in project |
|---|---|
| LGS DEVELOPERS | - |
Extensions applied for4
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe earlier promoter couldn't start the project on time and due to covid various permission got delayed, hence they approach the current Promoter. All units in project are unsold. As lot of time lost by earlier promoter, the current promoter need extension. Therefore requesting you to kindly allow the extension.
Reason as filed by the promoter15floors for the building are already done since the last time. 5floors are pending which should be completed well within the extended time requested by us. Request you to kindly grant us the extension to complete the project and deliver the same within the extended timelines. Agreement signed by the flat buyers does not require the developer to obtain permission from the respective buyer to extend the project.
Reason as filed by the promoter20 floors for the building are already been done since the last time. 1floor and interiors are pending, which should be completed well within the extended time requested by us. Request you to kindly grant us the extension to complete the project and deliver the same within the extended timelines. Agreement signed by the flat buyers does not require the developer to obtain permission from the respective buyer to extend the project.
Reason as filed by the promoterAll floors for the building are already been done since the last extension. Interiors are pending, which should be completed well within the extended time requested by us. Delay in sales has impacted the development of the project. But we are confident to close the project in the proposed deadline. Request you to kindly grant us the extension to complete the project and deliver the same within the extended timelines. Agreement signed by the flat buyers does not require the developer to obtain permission from the respective buyer to extend the project.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Apr 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Apr 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 May 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2028
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: LGS_FORM 5_FY25-26.pdf | 1 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 - Q4_FY25-26.pdf | 24 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 - Q4_FY25-26.pdf | 24 Jun 2026 |
| Withdrawal Update Form 3File: LGS_Form3_Q4_FY25-26.pdf | 24 Jun 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 18 Feb 2026 |
| Withdrawal Update Form 1File: Sept Form 1.pdf | 18 Feb 2026 |
| Withdrawal Update Form 1File: Dec Form 1.pdf | 18 Feb 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 18 Feb 2026 |
| Withdrawal Update Form 2File: Sept Form 2.pdf | 18 Feb 2026 |
| Withdrawal Update Form 2File: Dec Form 2.pdf | 18 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 signed.pdf | 18 Feb 2026 |
| Withdrawal Update Form 3File: Sept Form 3.pdf | 18 Feb 2026 |
| Withdrawal Update Form 3File: Dec Form 3.pdf | 18 Feb 2026 |
| Form 5 (FY 2023-2024)File: LGS_FORM 5_FY23-24.pdf | 28 May 2025 |
| Form 5 (FY 2024-2025)File: LGS_FORM 5_FY24-25.pdf | 28 May 2025 |
| Form 2File: LGS Form 2 Q1.pdf | 27 May 2025 |
| Form 1File: LGS Developer Rera Letter Q1.pdf | 27 May 2025 |
| Form 3File: Form 3_Q1.pdf | 27 May 2025 |
| Disclosure of Sold and Booked InventoryFile: LGS Q1 Sold Unsold.pdf | 27 May 2025 |
| Form 1File: LGS Developer Rera Letter Q2.pdf | 27 May 2025 |
| Form 2File: LGS Form 2 Q2.pdf | 27 May 2025 |
| Form 3File: Form 3 Q2 .pdf | 27 May 2025 |
| Disclosure of Sold and Booked InventoryFile: LGS Q2 Sold Unsold.pdf | 27 May 2025 |
| Form 1File: LGS Developer Rera Letter Q3.pdf | 27 May 2025 |
| Form 2File: LGS Form 2 Q3.pdf | 27 May 2025 |
| Form 3File: Form 3 Q3.pdf | 27 May 2025 |
| Disclosure of Sold and Booked InventoryFile: LGS Q3 Sold Unsold.pdf | 27 May 2025 |
| Form 1File: LGS Developer Rera Letter Q4.pdf | 27 May 2025 |
| Form 2File: LGS Form 2 Q4.pdf | 27 May 2025 |
| Form 3File: Form 3 Q4.pdf | 27 May 2025 |
| Disclosure of Sold and Booked InventoryFile: LGS Q4 Sold Unsold.pdf | 27 May 2025 |
| Declaration in FORM BFile: Form B_Notarised.pdf | 31 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_4thCert.pdf | 31 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 31 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 31 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_FY22-23.pdf | 31 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_FY22-23.pdf | 31 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY23-24.pdf | 31 May 2024 |
| Disclosure of sold/ booked inventoryFile: LGSDevelopers_SoldUnsold.pdf | 31 May 2024 |
| Certificates of CA (Form 3)File: Form 3_CA Certificate_LGSDevelopers.pdf | 31 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form5_SignedbyBoth.pdf | 31 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: LGS Building Permission.pdf | 29 May 2024 |
| Declaration in FORM BFile: FormB.pdf | 29 May 2024 |
| Certificates of CA (Form 3)File: Form 3_CA Certificate_LGSDevelopers.pdf | 21 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: LGS_FORM 5_FY22-23.pdf | 21 May 2024 |
| Proforma of Agreement for saleFile: draft Agg Yashree.pdf | 21 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 17 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2.pdf | 17 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 13 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_compressed.pdf | 13 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3_organized_compressed.pdf | 13 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 6 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate.pdf | 6 Feb 2023 |
| Certificates of CA (Form 3)File: CA Certificate (3)_compressed.pdf | 6 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Audit Report March 22.pdf | 6 Feb 2023 |
| PAN CardFile: PAN LGS developers.pdf | 10 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: engineer Certificate 2A.pdf | 15 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: sold unsold data.pdf | 15 Sep 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: NEW CC.pdf | 13 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Audit Report March 20.pdf | 10 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Audit Report March 21.pdf | 10 Sep 2022 |
| Certificates of CA (Form 3)File: 12 CA Certificate_compressed_compressed (1).pdf | 6 Jun 2019 |
| Building plan approvalFile: scan2-min.pdf | 21 May 2019 |
| Details of encumbrancesFile: Yash Declaration Scanned N Signed_1.pdf | 21 May 2019 |
| Building Plan Approval (IOD)File: scan2-min.pdf | 21 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Engineer Certificate RERA_compressed.pdf | 21 May 2019 |
| Proforma of Allotment letterFile: Agreement for sale-RERA-Yash Developers_220419.pdf | 21 May 2019 |
| Layout approvalFile: scan-min (1) (1).pdf | 30 Apr 2019 |
| PAN CardFile: Yash Developers Pancard.pdf | 30 Apr 2019 |
| Copy of the legal title reportFile: Title Certificate.pdf | 30 Apr 2019 |
| Copy of Layout Approval (in case of layout)File: scan-min (1) (1).pdf | 30 Apr 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 30 Apr 2019 |
| Declaration in FORM BFile: Form 2.pdf | 30 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate for RERA.pdf | 30 Apr 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep YASHREE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR TMC OFFICE THANE WEST7,600+ in Thane
Filed coordinates, straight-line distance. 356 registered projects within 2 km.
Hiranandani Westgate Phase 1
SHODEN DEVELOPERS PRIVATE LIMITED
Forestville - Phase 1
Oberoi Realty Limited
DOSTI WEST COUNTY - PHASE 4- DOSTI PINE
DOSTI ENTERPRISES
Y SQUARE
SHREE MALLINATH ENTERPRISE LLP
Primera
Agile Real Estate Dev Private Limited
UNIQUE VISTAS MHADA BUILDINGNO. 4 5 6 7
MADHU HARSHAD DOSHI
See every Thane project, with the district possession charts
Builder: LGS DEVELOPERS
LGS DEVELOPERS has 1 registration on MahaRERA, including YASHREE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if YASHREE is delayed beyond 31 Mar 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of YASHREE?
The registered promoter entity is LGS DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in YASHREE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for YASHREE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at YASHREE?
The professionals named in the filing: Architect: AKRUTI CONSULTANTS; Architect: RIGHT SPACE CONSULTANTS; Engineer: VINAYAK CHOPDEKAR & ASSOCIATES; Chartered Accountant: HARSHADA TAWDE; Chartered Accountant: Jiyan Shah & Co; Chartered Accountant: MANISH MOTILAL YADAC. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in YASHREE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback