ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / YashONE Wakad Central

Completed No litigation declared Residential / Group Housing project

YashONE Wakad Central

By Vilas Javdekar Eco Shelters Private Limited

RG-MH-04963 · RERA P52100020910 · Last updated on MahaRERA portal: 25 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
45 of 55Construction stages doneacross 5 buildings; furthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

YashONE Wakad Central is a Residential / Group Housing project by Vilas Javdekar Eco Shelters Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100020910 on 16 May 2019. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameYashONE Wakad Central
  • TypeResidential / Group Housing
  • Location
    • Datta Nagar
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100020910
  • ReraGenie IDRG-MH-04963

Builder

  • NameVilas Javdekar Eco Shelters Private Limited
  • Entity typeCompany
  • CINU45200PN2013PTC146349
  • GSTIN27AAECV3556D1ZC
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorAditya Vilas Javdekar
  • Other registrations8 more →
  • Completed9 of 9
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2019PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 May 2019
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings5 building records
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building A - 20 floorsNA210000
Building D - 22 floorsNA230000
Building A - 21 to 22 floorNA20000
Building C - 22 floorsNA220000
Building B - 22 floorsNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 25 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

45 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Internal walls, at 95%.

Building A - 20 floors100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building D - 22 floors81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.55%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Building A - 21 to 22 floor100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building C - 22 floors95%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Building B - 22 floors100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes60%
Open ParkingYes50%

Parking filed851

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots851
Closed/Covered186
Open Space665
BuildingClosed/CoveredOpen SpaceTotal
Building A - 20 floors62240302
Building D - 22 floors40160200
Building A - 21 to 22 floor2810
Building C - 22 floors201737
Building B - 22 floors62240302

Land and ownership14

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,260 sq m
Land owned byThe promoter, with other names on the file
Named landowners14
LandownerVillageDistrict
SHOBHA KHANDU KALAMKARWakadPune
Sunil Khandu KalamkarWakadPune
Archana Khandu KalamkarWakadPune
Sunita Pandurang KalamkarWakadPune
Pravin Pandurang KalamkarWakadPune
Kishore Pandurang KalamkarWakadPune
Vasant Kisan KalamkarWakadPune
Ashok Kisan KalamkarWakadPune
Subhash Kisan KalamkarWakadPune
Suresh Narayan KalamkarWakadPune
Prakash Narayan KalamkarWakadPune
Deepak Narayan KalamkarWakadPune
Sachin Balasaheb KalamkarWakadPune
Mayur Balasaheb KalamkarWakadPune

Approvals and building plan

Permissible FSI29408.0
Proposed, not sanctioned29,408 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIdeal Colony, Paud Road, Pune 411029

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNinad Kulkarni
ArchitectAnuja Joshi
ArchitectShrutika Hadimani
ArchitectKunal Navale
ArchitectLaxman Thite
EngineerJayant Vinayak Inamdar (Structural Engineer)
EngineerSarvesh Javekar
Chartered AccountantRSVA & Co
Chartered AccountantSachin S Dherange
PartnerRole in project
Vilas Javdekar Eco Shelters Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Mar 2023

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: Conveyance.pdf25 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: VJESPL RERA NUMBER P52100020910_Y1WC.pdf16 Sep 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Yashone Wakad Central A- Society Registration Certificate.pdf18 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Yashone Wakad Central B- Society Registration Certificate.pdf18 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Yashone Wakad Central C- Society Registration Certificate.pdf18 Apr 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Yashone Wakad Central D- Society Registration Certificate.pdf18 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM4_Y1_WC.pdf10 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: y1wc_Oc.pdf23 Mar 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CC_C_D_BLDG_Y1WC.pdf3 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: YashONE Wakad Central.pdf25 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert_Y1WC.pdf17 Jan 2023
Certificates of CA (Form 3)File: CA Certificate_Y1WC_compressed.pdf17 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng_Cert_Y1WC Sep22.pdf6 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Yashone wakad_compressed.pdf24 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: YashONE Wakad Central.pdf3 Oct 2022
Disclosure of sold/ booked inventoryFile: SI_Y1WC_JUNE 2022_compressed.pdf10 Aug 2022
Disclosure of sold/ booked inventoryFile: ARCH_Y1WC_JUNE 2022.pdf8 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_Y1WC_JUNE 2022.pdf31 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_Y1WC_JUNE 2022.pdf31 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert_Y1WC.pdf31 Jul 2022
OtherFile: Y1WC QPR Sep21.pdf14 Dec 2021
Disclosure of sold/ booked inventoryFile: 5 Y1WC_Inventory_Sept 2021_compressed.pdf14 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A YashONE Wakad Central Sept 21.pdf9 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: VJESPL_YashONE Wakad Central_Form 5_2020-2021.pdf30 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Y1WC_Society Formation.pdf22 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Y1WC_June2021_compressed.pdf31 Jul 2021
Disclosure of sold/ booked inventoryFile: YashONE Wakad Central_compressed.pdf29 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: YashONE Wakad Central_March 2021.pdf13 Apr 2021
Building plan approvalFile: 21 and 22 floor_compressed.pdf8 Apr 2021
Layout approvalFile: Revised Layout_compressed.pdf8 Apr 2021
Copy of Layout Approval (in case of layout)File: Revised Layout_compressed.pdf8 Apr 2021
Building Plan Approval (IOD)File: 21 and 22 floor_compressed.pdf8 Apr 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_revised_compressed.pdf8 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: YASHONE WAKAD CENTRAL.pdf31 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Y1WC_Dec 20200001.pdf5 Feb 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Y1WC_Sept 2020_compressed.pdf8 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_Y1WC_June 2020.pdf8 Oct 2020
Details of Restarting of Construction work post lockdownFile: Y1WC_Restart letter.pdf17 Jun 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Y1W.pdf4 Apr 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: YASHONE WAKAD_Form 24 - Sept 2019.pdf3 Mar 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Y1 WAKAD - FORM 2A - JUNE 201900010001_compressed.pdf3 Mar 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Y1WC - Form 2A - Dec 20190001_compressed.pdf8 Jan 2020
Details of encumbrancesFile: Encumberance - YashONE Wakad Central_22112019.pdf24 Dec 2019
OtherFile: AFS change_Y1WC_22112019.pdf24 Dec 2019
Layout approvalFile: Y1WC - Revised Sanctioned 31102019 .pdf12 Nov 2019
Copy of Layout Approval (in case of layout)File: Y1WC - Revised Sanctioned 31102019 .pdf12 Nov 2019
Building plan approvalFile: Y1 Wakad - Building Plan 1.pdf14 May 2019
Building plan approvalFile: Y1 Wakad - Building Plan 2.pdf14 May 2019
Layout approvalFile: Y1 Wakad - Layout.pdf14 May 2019
PAN CardFile: 1 Pan Card.pdf14 May 2019
Copy of the legal title reportFile: Y1 Wakad - TSR.pdf14 May 2019
Details of encumbrancesFile: Y1 Wakad - Encumbrance certificate.pdf14 May 2019
Copy of Layout Approval (in case of layout)File: Y1 Wakad - Layout.pdf14 May 2019
Building Plan Approval (IOD)File: Y1 Wakad - Building Plan 1.pdf14 May 2019
Building Plan Approval (IOD)File: Y1 Wakad - Building Plan 2.pdf14 May 2019
Commencement Certificates / NA Order for plotted developmentFile: Y1 Wakad - Commencement certificate.pdf14 May 2019
Declaration in FORM BFile: Y1 Wakad - Form B - Promoter.pdf14 May 2019
Certificates of CA (Form 3)File: Y1 Wakad - CA certificate.pdf14 May 2019
Proforma of Allotment letterFile: Y1 Wakad - ATS.pdf14 May 2019
OtherFile: Y1 Wakad - ATS confirmation letter.pdf14 May 2019

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PrudentiaSurvey no 173 2 2A 3 and 173 2 2A 4 Near Datta Mandir Wakad Taluka Mulshi District Pune 411057133CompletedJun 2019May 2019
Palash Boulevard Phase 1Gat No 510 Pirangut Tal Mulshi Dist Pune188CompletedSep 2017Apr 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YashONE Wakad Central on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wakad13,700+ in Pune

2 kmYashONE Wakad CentralCompleted 136Lapsed / revoked 52Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 267 registered projects within 2 km.

Builder: Vilas Javdekar Eco Shelters Private Limited

Vilas Javdekar Eco Shelters Private Limited has 9 registrations on MahaRERA, including YASHWIN HINJAWADI and Prudentia - Phase 1. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if YashONE Wakad Central is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YashONE Wakad Central?

The registered promoter entity is Vilas Javdekar Eco Shelters Private Limited, a company as per the filing. Its CIN U45200PN2013PTC146349 and GSTIN 27AAECV3556D1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YashONE Wakad Central?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for YashONE Wakad Central?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YashONE Wakad Central?

The professionals named in the filing: Architect: Ninad Kulkarni; Architect: Anuja Joshi; Architect: Shrutika Hadimani; Architect: Kunal Navale; Architect: Laxman Thite; Engineer: Jayant Vinayak Inamdar (Structural Engineer). Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YashONE Wakad Central?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YashONE Wakad Central. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YashONE Wakad Central to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.