Home / Browse projects / Pune, Maharashtra / YashONE Hinjawadi - Phase II

Completed No litigation declared Residential / Group Housing project

YashONE Hinjawadi - Phase II

By Vilas Javdekar Eco Shelters Private Limited

RG-MH-15838 · RERA P52100024108 · Last updated on MahaRERA portal: 5 Sep 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

YashONE Hinjawadi - Phase II is a Residential / Group Housing project by Vilas Javdekar Eco Shelters Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100024108 on 21 Jan 2020. The registration is recorded completed; possession was promised by 30 Mar 2025.

At a glance

Project

  • NameYashONE Hinjawadi - Phase II
  • TypeResidential / Group Housing
  • Location
    • Maan Street
    • Hinjawadi
    • Man
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024108
  • ReraGenie IDRG-MH-15838

Builder

  • NameVilas Javdekar Eco Shelters Private Limited
  • Entity typeCompany
  • CINU45200PN2013PTC146349
  • GSTIN27AAECV3556D1ZC
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorAditya Vilas Javdekar
  • Other registrations8 more →
  • Completed9 of 9
  • Declared earlier projects2 →

Key dates

this monthRegisteredJan 2020PromisedMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Jan 2020
  • Promised completion30 Mar 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building E - 22 floorsNA250000
Building D - 21 floorsNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

Building E - 22 floors100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building D - 21 floors100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed344

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots344
Closed/Covered344
BuildingClosed/CoveredTotal
Building E - 22 floors176176
Building D - 21 floors168168

Land and ownership13

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,300 sq m
Land owned byThe promoter, with other names on the file
Named landowners13
LandownerVillageDistrict
Shivaji Nivrutti ThakarManPune
Pandit Nivrutti ThakarManPune
Pralhad Nivrutti ThakarManPune
Raju Jaysing ThakarManPune
Yuvraj Jaysing ThakarManPune
Changunabai Jaysing ThakarManPune
Gita Rohidas ThakarManPune
Shyam Rohidas ThakarManPune
Dnyaneshwari Rohidas ThakarManPune
Devdas Pandit ThakarManPune
Jagdish Shivaji ThakarManPune
Parag Shripatrao MatePune (M Corp.)Pune
Santosh JaysingThakarManPune

Approvals and building plan

Permissible FSI25929.53
Proposed, not sanctioned24,846 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSarthak Terraces, Kothrud, Pune

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSameer Murari Valimbe
ArchitectAnuja Joshi
ArchitectShrutika Hadimani
ArchitectNinad Kulkarni
ArchitectKunal Navale
EngineerSarvesh Javdekar
Chartered AccountantAbhijit Mundada
Chartered AccountantSachin S Dherange
PartnerRole in project
Vilas Javdekar Eco Shelters Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Nov 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Nov 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 29 Jun 2023

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: VJESPL RERA NUMBER P52100024108_Y1H Ph2.pdf5 Sep 2023
Architect’s Certificate on Completion of Project (Form 4)File: Yashone hinjawadi phase II Form 4.pdf5 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Y1H Ph-2_compressed.pdf18 Jul 2023
Disclosure of sold/ booked inventoryFile: yashone hinjawadi ph 2 sold unsold_compressed.pdf14 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: YashONE_Hinjawadi_Phase_2_June23.pdf12 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Y1H Ph-2.pdf12 Jul 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Y1H- E Society Registration Certificate.pdf1 Jul 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Y1H- D Society Registration Certificate.pdf1 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: YashONE Hinjewadi- D Building-Part OC dated 08-05-2023_compressed.pdf29 Jun 2023
OtherFile: Y1H2.pdf12 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG_Y1_HINJAWADI_PH2.pdf24 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Yashone_Hinjawadi_Ph2_compressed.pdf20 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QA_Y1_H_ph2.pdf15 Apr 2023
Disclosure of sold/ booked inventoryFile: Y1_HINJAWADI_PH_2_compressed.pdf14 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Y1H Ph-2.pdf21 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion - Y1H Building E.pdf18 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Y1H Phase-2_compressed.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArYHPh2_311222.pdf16 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng_Cert_Y1H Ph2 Sep22.pdf6 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Yashone hinjawadi p2_compressed.pdf24 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Yashone Hinjawadi Phase-2.pdf3 Oct 2022
Disclosure of sold/ booked inventoryFile: SI_Y1H_PHASE II_JUNE 2022_compressed.pdf10 Aug 2022
Disclosure of sold/ booked inventoryFile: ARCH_Y1H PH2_JUNE 2022.pdf8 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH_Y1H PH2_JUNE 2022.pdf31 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert_Y1H Phase-2.pdf31 Jul 2022
OtherFile: Y1H P2 QPR Sep21.pdf14 Dec 2021
Disclosure of sold/ booked inventoryFile: Y1H Ph II_Inventory_Sept 2021_compressed.pdf14 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A YashONE Hinjawadi Phase 2 Sept 21.pdf9 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: VJESPL_Y1H_Phase II_Form 5_2020-2021.pdf30 Sep 2021
Details of encumbrancesFile: Encumberance letter_Y1H_Ph II_revised_07092021.pdf23 Sep 2021
Proforma of Allotment letterFile: Y1H Phase II - ATS Draft_26082021.pdf26 Aug 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Y1H_Phase II_Society Formation.pdf22 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Y1H_PhaseII_June2021_compressed.pdf31 Jul 2021
Disclosure of sold/ booked inventoryFile: YashONE Hinjawadi Phase II_compressed.pdf22 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: YashONE Hinjawadi_Phase II_March 2021.pdf13 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: YASHONE HINJAWADI PHASE 2.pdf31 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Y1H_Phase II_Dec 202000010001.pdf5 Feb 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Y1H_Phase II_Dec 202000010001.pdf19 Jan 2021
OtherFile: Change in Survey number_Y1H Phase II.pdf21 Dec 2020
Layout approvalFile: Sanction Layout for Y1H_D wing.pdf19 Nov 2020
Building plan approvalFile: Refuge Floor plan_compressed.pdf19 Nov 2020
Building plan approvalFile: Typical Floor plan_compressed.pdf19 Nov 2020
Copy of Layout Approval (in case of layout)File: Sanction Layout for Y1H_D wing.pdf19 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: Refuge Floor plan_compressed.pdf19 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: Typical Floor plan_compressed.pdf19 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf19 Nov 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_ Y1H_Ph II_June 2020.pdf8 Oct 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Y1H Phase II_Sept 2020_compressed.pdf8 Oct 2020
Details of Restarting of Construction work post lockdownFile: Y1H_Ph II_Restart letter.pdf4 Aug 2020
Declaration in FORM BFile: Form B - Promoter0001_compressed.pdf14 Jan 2020
OtherFile: Declaration - Common area0001.pdf14 Jan 2020
Layout approvalFile: Layout_compressed.pdf13 Jan 2020
Building plan approvalFile: Building Plan 1_compressed.pdf13 Jan 2020
Building plan approvalFile: Building Plan 2_compressed.pdf13 Jan 2020
Copy of the legal title reportFile: TSR 0001_compressed.pdf13 Jan 2020
Copy of the legal title reportFile: TSR- Y1H - Phase II.pdf13 Jan 2020
Copy of the legal title reportFile: SUPLEMENTAL TSR.pdf13 Jan 2020
Details of encumbrancesFile: ENCUMBERANCE LETTER.pdf13 Jan 2020
Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf13 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 1_compressed.pdf13 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2_compressed.pdf13 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement_compressed.pdf13 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Y1H - Phase II.pdf13 Jan 2020
Proforma of Allotment letterFile: ATS and Allotment.pdf13 Jan 2020
OtherFile: ATS Confirmation.pdf13 Jan 2020
PAN CardFile: 1 VJESPL PAN.pdf10 Jan 2020

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
PrudentiaSurvey no 173 2 2A 3 and 173 2 2A 4 Near Datta Mandir Wakad Taluka Mulshi District Pune 411057133CompletedJun 2019May 2019
Palash Boulevard Phase 1Gat No 510 Pirangut Tal Mulshi Dist Pune188CompletedSep 2017Apr 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YashONE Hinjawadi - Phase II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjawadi13,700+ in Pune

2 kmYashONE Hinjawadi - PhasCompleted 33Lapsed / revoked 18Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 97 registered projects within 2 km.

Builder: Vilas Javdekar Eco Shelters Private Limited

Vilas Javdekar Eco Shelters Private Limited has 9 registrations on MahaRERA, including YASHWIN HINJAWADI and Prudentia - Phase 1. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if YashONE Hinjawadi - Phase II is delayed beyond 30 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YashONE Hinjawadi - Phase II?

The registered promoter entity is Vilas Javdekar Eco Shelters Private Limited, a company as per the filing. Its CIN U45200PN2013PTC146349 and GSTIN 27AAECV3556D1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YashONE Hinjawadi - Phase II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for YashONE Hinjawadi - Phase II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YashONE Hinjawadi - Phase II?

The professionals named in the filing: Architect: Sameer Murari Valimbe; Architect: Anuja Joshi; Architect: Shrutika Hadimani; Architect: Ninad Kulkarni; Architect: Kunal Navale; Engineer: Sarvesh Javdekar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YashONE Hinjawadi - Phase II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YashONE Hinjawadi - Phase II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YashONE Hinjawadi - Phase II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.