ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / YASHODA VRUNDAVAN COMPLEX - C WING

Registered No litigation declared Residential / Group Housing project

YASHODA VRUNDAVAN COMPLEX - C WING

By VARDHMAN REALTY

RG-MH-17927 · RERA P51700076964 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Staircases, 90%
87 of 89Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

YASHODA VRUNDAVAN COMPLEX - C WING is a Residential / Group Housing project by VARDHMAN REALTY in Thane, Maharashtra, registered with MahaRERA as P51700076964 on 10 Jul 2024. Possession is promised by 31 Jul 2027. 2 of the 89 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameYASHODA VRUNDAVAN COMPLEX - C WING
  • TypeResidential / Group Housing
  • Location
    • DONE ROAD
    • POST VANGANI
    • Done
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700076964
  • ReraGenie IDRG-MH-17927

Builder

  • NameVARDHMAN REALTY
  • Entity typePartnership
  • GSTIN27AANFV4539N1ZB
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersVINAY HARILAL SHAH, HARILAL VELJI SHAH, DAKSHA HARILAL SHAH, RUCHI VINAY SHAH
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2024PromisedJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jul 2024
  • Promised completion31 Jul 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed55 files

Current status

2%2 of 89 units booked
58.2%Work done, per cost certificate

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No- 1 Wing CNA88701989

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.

Building No- 1 Wing C: 48% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed147

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots147
Closed/Covered46
Open Space101

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,028 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityDistrict Officer Thane
Permissible FSI11429.43
Proposed, not sanctioned3,028 sq m
Buildings approved5
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMoreshwar Building, Hanuman Road, Vile Parle East, Mumbai- 400057
Estimated costRs 5.87 cr
Cost incurredRs 3.42 cr
Work done58.22%
BuildingWingEstimatedIncurred
Building No- 1 Wing CNARs 5.75 crRs 3.42 cr
-NARs 11.74 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSachin Potdar
EngineerSK Consultants & Engineers
EngineerS K Consultants & Engineers
Chartered AccountantNB Sayed & Associates
PartnerRole in project
Vardhman Realty-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2027

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Yashoda Vrundavan Complex-C Wing as on Sep 2025.pdf25 May 2026
Withdrawal Update Form 1File: Form 1 - Yashoda Vrundavan Complex-C Wing as on Sep 2025.pdf25 May 2026
Withdrawal Update Form 1File: Form 1 Yashoda Vrundavan Complex-C Wing As on 31-12-2025.pdf25 May 2026
Withdrawal Update Form 1File: Form 1 - Yashoda Vrundavan Complex as on March 2026.pdf25 May 2026
Withdrawal Update Form 2File: Form 2 - Yashoda Vrundavan Complex-C Wing as on June 2025.pdf25 May 2026
Withdrawal Update Form 2File: Form 2 Yashoda Vrundavan Complex-C Wing As on 31-12-2025.pdf25 May 2026
Withdrawal Update Form 2File: Form 2 Yashoda Vrundavan Complex-C Wing As on 31-12-2025.pdf25 May 2026
Withdrawal Update Form 2File: Form 2 Yashoda Vrundavan Complex-C Wing_As on 31-03-2026.pdf25 May 2026
Withdrawal Update Form 3File: Form 3 Yashoda Vrundavan Complex - C Wing 30-06-2025.pdf25 May 2026
Withdrawal Update Form 3File: Form 3 Yashoda Vrundavan Complex-C Wing_As on 30-09-2025.pdf25 May 2026
Withdrawal Update Form 3File: Form 3 Yashoda Vrundavan Complex-C Wing As on 31-12-2025.pdf25 May 2026
Withdrawal Update Form 3File: Form 3 Yashoda Vrundavan Complex-C Wing_As on 31-03-2026.pdf25 May 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Yashoda Vrundavan Complex - C Wing 31-03-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Yashoda Vrundavan Complex - C Wing as on March 2025.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Yashoda Vrundavan Complex - C Wing as on March 2025.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Yashoda Vrundavan Complex - C Wing 31-12-2024.pdf15 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Yashoda Vrundavan Complex - C wing as on Dec 2024.pdf15 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Yashoda Vrundavan Complex C Wing as on September 2024.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Yashoda Vrundavan Complex C Wing as on Dec 2024.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Yashoda Vrundavan Complex - C Wing 30-09-2024.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Yashoda Vrundavan Complex - C Wing as on Sept 2024.pdf10 Jan 2025
Building plan approvalFile: Dec Yashoda Merged.pdf9 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Dec Yashoda Merged.pdf9 Jul 2024
Other - FinanceFile: Dec Yashoda Merged.pdf5 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Order 50.pdf11 Jun 2024
Building plan approvalFile: done blue print 3_11zon.pdf10 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: done blue print 3_11zon.pdf10 Jun 2024
Details of encumbrances concerned to FinanceFile: Finance.pdf6 May 2024
Details of encumbrances concerned to LegalFile: Finance.pdf6 May 2024
CERSAI detailsFile: Cersai.pdf6 May 2024
Other - LegalFile: Vardhman realty partnership deed_compressed.pdf6 May 2024
Other - LegalFile: 10 sale agreement_compressed.pdf6 May 2024
Other - LegalFile: 12 sale agreement_compressed.pdf6 May 2024
Other - LegalFile: 415 sale agreement_compressed_compressed.pdf6 May 2024
Copy of the legal title reportFile: vardhman realty done title.pdf11 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA.pdf2 Apr 2024
Other - TechnicalFile: CC confirmation.pdf2 Apr 2024
Other - TechnicalFile: CC confirmation_1.pdf2 Apr 2024
Layout approvalFile: 1 Building Plan Approval _ NA Order for plotted development (26).pdf15 Mar 2024
PAN CardFile: Vardhaman Realty PAN.pdf15 Mar 2024
Details of encumbrances concerned to FinanceFile: Encumbrance in legal _compressed.pdf15 Mar 2024
Details of encumbrances concerned to LegalFile: Encumbrance in legal _compressed.pdf15 Mar 2024
Copy of Layout Approval (in case of layout)File: 1 Building Plan Approval _ NA Order for plotted development (26).pdf15 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC 06022024.pdf15 Mar 2024
Declaration about Commencement CertificateFile: Declaration about CC_compressed.pdf15 Mar 2024
Declaration in FORM BFile: Form B_compressed.pdf15 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (Daksha shah)_compressed.pdf15 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (HARILAL shah)_compressed.pdf15 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (ruchi shah)_compressed.pdf15 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (Vinay shah)_compressed.pdf15 Mar 2024
Proforma of Agreement for saleFile: VARDHAMAN REALTY FINAL DRAFT.pdf15 Mar 2024
Proforma of Allotment letterFile: Allotment Letter.pdf15 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf15 Mar 2024
Deviation Report with respect to Allotment letterFile: Deviation in allotment letter _compressed.pdf15 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation in Agreement for sale _compressed.pdf15 Mar 2024

How this compares with Thane

2%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YASHODA VRUNDAVAN COMPLEX - C WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near POST VANGANI7,600+ in Thane

2 kmYASHODA VRUNDAVAN COMPLECompleted 3Lapsed / revoked 5Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: VARDHMAN REALTY

VARDHMAN REALTY has 3 registrations on MahaRERA, including NOVA LUXURIA and YASHODA VRUNDAVAN COMPLEX - C WING. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if YASHODA VRUNDAVAN COMPLEX - C WING is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YASHODA VRUNDAVAN COMPLEX - C WING?

The registered promoter entity is VARDHMAN REALTY, a partnership as per the filing. Its GSTIN 27AANFV4539N1ZB can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YASHODA VRUNDAVAN COMPLEX - C WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for YASHODA VRUNDAVAN COMPLEX - C WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YASHODA VRUNDAVAN COMPLEX - C WING?

The professionals named in the filing: Architect: Sachin Potdar; Engineer: SK Consultants & Engineers; Engineer: S K Consultants & Engineers; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YASHODA VRUNDAVAN COMPLEX - C WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YASHODA VRUNDAVAN COMPLEX - C WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YASHODA VRUNDAVAN COMPLEX - C WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.