ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / YASHODA AANGAN

Completed No litigation declared Residential / Group Housing project

YASHODA AANGAN

By KONARK ASSOCIATES

RG-MH-19714 · RERA P52100006664 · Last updated on MahaRERA portal: 27 Nov 2023

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 42 months
  • 3 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
14 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 75%
1Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

YASHODA AANGAN is a Residential / Group Housing project by KONARK ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100006664 on 16 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2023. The completion date has moved by 42 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameYASHODA AANGAN
  • TypeResidential / Group Housing
  • Location
    • Thergaon
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100006664
  • ReraGenie IDRG-MH-19714

Builder

  • NameKONARK ASSOCIATES
  • Entity typePartnership
  • PartnersSANDEEP VIMALCHAND JAIN, MANISH PRAKASH JAIN
  • Other registrations5 more →
  • Completed3 of 6
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseDec 2019Revised toJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Aug 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 31 Dec 2019)
  • Buildings2 building records
  • Documents filed103 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
YASHODA AANGAN WING ANA150000
YASHODA AANGAN WING BNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

YASHODA AANGAN WING A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
YASHODA AANGAN WING B62%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes60%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes50%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes70%
Open ParkingYes50%

Parking filed118

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots118
Closed/Covered69
Open Space49
BuildingClosed/CoveredOpen SpaceTotal
YASHODA AANGAN WING A543488
YASHODA AANGAN WING B151530

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,378 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
MR MACCHINDRA BARANEThergaonPune
MR SANJAY BARANEThergaonPune
MR NAVNATH BARNEThergaonPune
MR ABU BARNEThergaonPune

Approvals and building plan

Permissible FSI6702.13
Proposed, not sanctioned4,369 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchEMPIRE ESTATE CHINCHWAD

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMR SACHIN SUTAR
PartnerRole in project
KONARK ASSOCIATES-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100003868Dec 2019 → Dec 2020

Reason as filed by the promoterWork of A wing is 100% complete & part completion certificate of A wing is obtained through certificate no.450/2019.dated 08/08/2019.Work of B wing is 60% complete.Due to delay in loading of TDR from PCMC,Authority and lack of labours during festive season.We request you to please Extend & consider our request.

EXT52100010668Dec 2019 → Jun 2022

Reason as filed by the promoterDue to PENDAMIC COVID-19 Situation the labour shortage thats why we have to extend one year

EXT52100012390Dec 2019 → Jun 2023

Reason as filed by the promoterDUE TO COVID 19

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000238636Santosh Maruti BargeAbu Bhaguji Barne and promoter Konark Associates04/04/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Nov 2023

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: yashda aangan.pdf27 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: yashda aangan.pdf27 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf6 Aug 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf6 Aug 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf6 Aug 2022
Certificates of CA (Form 3)File: YASHODA AANGAN CA CERTIFICATE.pdf6 Aug 2022
Certificates of CA (Form 5)File: Form 5- 2021-22.pdf6 Aug 2022
Building plan approvalFile: YA 1.PDF27 Oct 2021
Building plan approvalFile: YA 2.PDF27 Oct 2021
Building plan approvalFile: YA 3.PDF27 Oct 2021
Building plan approvalFile: YA 4.PDF27 Oct 2021
Building plan approvalFile: YA 5.PDF27 Oct 2021
Building plan approvalFile: YA 6.PDF27 Oct 2021
Building plan approvalFile: YA 7.PDF27 Oct 2021
Building Plan Approval (IOD)File: YA 1.PDF27 Oct 2021
Building Plan Approval (IOD)File: YA 2.PDF27 Oct 2021
Building Plan Approval (IOD)File: YA 3.PDF27 Oct 2021
Building Plan Approval (IOD)File: YA 4.PDF27 Oct 2021
Building Plan Approval (IOD)File: YA 5.PDF27 Oct 2021
Building Plan Approval (IOD)File: YA 6.PDF27 Oct 2021
Building Plan Approval (IOD)File: YA 7.PDF27 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: YA CC NW-21.pdf27 Oct 2021
Declaration about Commencement CertificateFile: CC Declaration Form D.pdf21 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: cerfificates 1.pdf21 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: certificates 2.pdf21 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: certificates 3.pdf21 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: certificates 4.pdf21 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: certificates 4.pdf21 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: certificates 5.pdf21 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: certificates 6.pdf21 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: certificates 7.pdf21 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: certificates 8.pdf21 Aug 2021
Disclosure of sold/ booked inventoryFile: A wing sold unsold.pdf21 Aug 2021
Disclosure of sold/ booked inventoryFile: B wing sold unsold.pdf21 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA 19-20.pdf21 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA 20-21.pdf21 Aug 2021
Building plan approvalFile: YA 1.PDF23 Dec 2020
Building plan approvalFile: YA 2.PDF23 Dec 2020
Building plan approvalFile: YA 3.PDF23 Dec 2020
Building plan approvalFile: YA 4.PDF23 Dec 2020
Building plan approvalFile: YA 5.PDF23 Dec 2020
Building plan approvalFile: YA 6.PDF23 Dec 2020
Building plan approvalFile: YA 7.PDF23 Dec 2020
Building Plan Approval (IOD)File: YA 1.PDF23 Dec 2020
Building Plan Approval (IOD)File: YA 2.PDF23 Dec 2020
Building Plan Approval (IOD)File: YA 3.PDF23 Dec 2020
Building Plan Approval (IOD)File: YA 4.PDF23 Dec 2020
Building Plan Approval (IOD)File: YA 5.PDF23 Dec 2020
Building Plan Approval (IOD)File: YA 6.PDF23 Dec 2020
Building Plan Approval (IOD)File: YA 7.PDF23 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: CC certificates.pdf23 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA form5 (KA).pdf19 Dec 2019
Architect’s Certificate on Completion of Project (Form 4)File: form 4.pdf16 Dec 2019
Building plan approvalFile: MYSCAN_20191211_0001.PDF12 Dec 2019
Building plan approvalFile: MYSCAN_20191211_0002.PDF12 Dec 2019
Building plan approvalFile: MYSCAN_20191211_0003.PDF12 Dec 2019
Building plan approvalFile: MYSCAN_20191211_0004.PDF12 Dec 2019
Building plan approvalFile: MYSCAN_20191211_0005.PDF12 Dec 2019
Building plan approvalFile: MYSCAN_20191211_0006.PDF12 Dec 2019
Building plan approvalFile: MYSCAN_20191211_0007.PDF12 Dec 2019
Building plan approvalFile: MYSCAN_20191211_0008.PDF12 Dec 2019
Building plan approvalFile: MYSCAN_20191211_0009.PDF12 Dec 2019
Building plan approvalFile: MYSCAN_20191211_0010.PDF12 Dec 2019
Building plan approvalFile: MYSCAN_20191211_0011.PDF12 Dec 2019
Building Plan Approval (IOD)File: MYSCAN_20191211_0001.PDF12 Dec 2019
Building Plan Approval (IOD)File: MYSCAN_20191211_0002.PDF12 Dec 2019
Building Plan Approval (IOD)File: MYSCAN_20191211_0003.PDF12 Dec 2019
Building Plan Approval (IOD)File: MYSCAN_20191211_0004.PDF12 Dec 2019
Building Plan Approval (IOD)File: MYSCAN_20191211_0005.PDF12 Dec 2019
Building Plan Approval (IOD)File: MYSCAN_20191211_0006.PDF12 Dec 2019
Building Plan Approval (IOD)File: MYSCAN_20191211_0007.PDF12 Dec 2019
Building Plan Approval (IOD)File: MYSCAN_20191211_0008.PDF12 Dec 2019
Building Plan Approval (IOD)File: MYSCAN_20191211_0009.PDF12 Dec 2019
Building Plan Approval (IOD)File: MYSCAN_20191211_0010.PDF12 Dec 2019
Building Plan Approval (IOD)File: MYSCAN_20191211_0011.PDF12 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: doc06520420191211192648.pdf12 Dec 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Konark Associates.pdf12 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: doc01834220181015175745 CC YA.pdf15 Oct 2018
Certificates of CA (Form 5)File: YA Form5 CA.pdf13 Oct 2018
Building plan approvalFile: YA Plan 5.pdf30 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 42 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep YASHODA AANGAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thergaon13,700+ in Pune

2 kmYASHODA AANGANCompleted 56Lapsed / revoked 43Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 135 registered projects within 2 km.

Builder: KONARK ASSOCIATES

KONARK ASSOCIATES has 6 registrations on MahaRERA, including GRAND CASA and BLUE BREEZE. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if YASHODA AANGAN is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of YASHODA AANGAN?

The registered promoter entity is KONARK ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in YASHODA AANGAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against YASHODA AANGAN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for YASHODA AANGAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at YASHODA AANGAN?

The professionals named in the filing: Architect: MR SACHIN SUTAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in YASHODA AANGAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About YASHODA AANGAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save YASHODA AANGAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.