  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2024Possession promisedmoved 9 months from the original
0 of 19Construction stages donefurthest along: Earth work and other leveling..., 0%
92 of 92Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 53 documents Report an error

Woodsville is a Residential/Group Housing project by VINIT S AMIN in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/318/PR/190114/002291 on 14 Jan 2019. Possession is promised by 30 Sep 2024. The completion date has moved by 9 months from the original filing. 0 of the 92 units on this registration are recorded sold or booked, and 0 of 19 construction stages are filed complete.

At a glance

Project

  • NameWoodsville
  • TypeResidential/Group Housing
  • Location
    • Udupi
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1273/318/PR/190114/002291
  • ReraGenie IDRG-KA-06316

Builder

  • NameVINIT S AMIN
  • Other registrations6 more →
  • Past their filed date5
  • Declared earlier projects7 →

Key dates

this monthRegisteredJan 2019First promiseDec 2023Revised toSep 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on14 Jan 2019
  • Promised completion30 Sep 2024
  • Revised completionRevised to 30 Sep 2024 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed53 files

Current status

0%0 of 92 units booked

Figures as on Not stated, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WOODSVILLE---92092

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on Not stated, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 19 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.

Building: 0% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on Not stated, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalNoNot applicable
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,943 sq m
Land owned byNot the promoter
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 32.62 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGISH CHANDRA DHARA
EngineerM. GOPAL BHAT

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2023 → Sep 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed53

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/318/PR/190114/002291 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Woodville BL - 25-10-2018-
Approved Plan-
Single Layput-
PROFORMA OF - DEED OF SALE-
PROFORMA OF - AGREEMENT FOR SALE - RERA-1-
13 Sale Deed-
Section Drawing-
Woodsville Brochure-
FIRE NOC - WOODSVILLE-
SPECIFICATIONS-
EC-ilovepdf-compressed-
ilovepdf_merged-
ilovepdf_merged-ilovepdf-compressed-
Convertion Order-ilovepdf-compressed-
FIRE NOC - WOODSVILLE-
imgonline-com-ua-CompressToSize-F78l7KjeFUv92pB-
BSNL-
Unnamed document-
Stability Certificate-
Section Drawing-
Section Drawing-
Advocte Search report-
Balance Sheet 2017 - 2018File: Balance Sheet.JPG-
Balance Sheet 2016 - 2017File: BL 2017-18 - 22.jpg-
Balance Sheet 2015 - 2016File: BALANCE SHEET 2016.jpg-
Audited Profit and Loss Statement 2017 - 2018File: Profit & Loss-ilovepdf-compressed.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P & L 2018-18.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit & loss 2016.pdf-
Cash Flow Statement 2017 - 2018File: Cash Flow.JPG-
Cash Flow Statement 2015 - 2016File: CASH FLOW.jpg-
Auditor's Report 2017 - 2018File: Audit Report-ilovepdf-compressed-ilovepdf-compressed.pdf-
Auditor's Report 2016 - 2017File: Audit report-ilovepdf-compressed.pdf-
Auditor's Report 2015 - 2016File: Report 2016-.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: AKG.JPG-
Income Tax Return Acknowledgement 2016 - 2017File: AKG 2017-18 - 2.jpg-
Income Tax Return Acknowledgement 2015 - 2016File: AKG 2016.jpg-
Form B-
Prospectus/BrochureFile: Woodsville_Brochure_Frn.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1273_318_PR_190114_002291.xlsx-
Stability CertificateFile: Stability Certificate.PDF-
Road cutting permission letter issued by the planning Authority for laying Water supply line, sanitary line, UFile: Road cutting permmision.pdf-
NOC issued by the Fire Force department after completion of workFile: FIRE CC.pdf-
Occupancy CertificateFile: OCUPANCY CERTIFICATE ON 10-1-2023.pdf-
Consent for operation issued by KSPCBFile: Pollution Control_compressed.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: License Lift-1_merged.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: VINITH S AMIN APPROVAL ELE.pdf-
Common Area and other amenities facilities are completed or not and details of handling over of the same to asFile: DOD_compressed_compressed.pdf-
Details of undivided share of land handed over to the association of allotteesFile: MINUTES OF THE 1STAGM OF Woodsville 08-04-2023 1.pdf-
Architect certificate for having completed the work(in format no 5)File: Form - 5.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4 CC Woodsville.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Woodsville - Affidavit.pdf-
Engineer CertificateFile: Form - 6.pdf-
Water permmisionFile: Water Woodsville.pdf-

How this compares with Udupi

0%of this project is bookeddistrict median 0%
22%of Udupi projects moved their completion datethis one moved by 9 months
0%of Udupi registrations have lapsed or been cancelledthis one is on the register

Computed across the 260+ Udupi projects on ReraGenie, from their own filings.

Keep Woodsville on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Udupi260+ in Udupi

2 kmWoodsvilleOther 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: VINIT S AMIN

VINIT S AMIN has 7 registrations on RERA Karnataka, including RAINTREE and Grasslands - Forest Hills. Its filings disclose 7 earlier RERA Karnataka projects, none completed yet. Read the full track record. See more projects on the Udupi district page.

Frequently asked questions

What are my rights if Woodsville is delayed beyond 30 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Woodsville?

The registered promoter entity is VINIT S AMIN. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Woodsville?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Woodsville?

The professionals named in the filing: Architect: YOGISH CHANDRA DHARA; Engineer: M. GOPAL BHAT. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Woodsville?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Woodsville. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Woodsville to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.