Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2034Possession promisedno revision filed
0 of 17Construction stages donefurthest along: Earth work and other leveling..., 90%
141 of 342Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 147 documents Report an error

MANDAVI DOWNTOWN is a Residential/Group Housing project by MANDAVI CONSTRUCTIONS in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/318/PR/210625/007857 on 21 Jun 2025. Possession is promised by 1 Mar 2034. 201 of the 342 units on this registration are recorded sold or booked, and 0 of 17 construction stages are filed complete.

At a glance

Project

  • NameMANDAVI DOWNTOWN
  • TypeResidential/Group Housing
  • Location
    • Udupi
    • 576102
  • Pincode576102
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1273/318/PR/210625/007857
  • ReraGenie IDRG-KA-58593

Builder

  • NameMANDAVI CONSTRUCTIONS
  • Entity typePartnership Firm
  • GSTIN29ABWFM3446PIZ5
  • Authorized SignatoryGLEN DIAS

Key dates

this monthRegisteredJun 2025PromisedMar 2034

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on21 Jun 2025
  • Promised completion1 Mar 2034
  • Revised completionNone
  • Buildings3 building records
  • Documents filed147 files

Current status

59%201 of 342 units booked
6.0%Of the estimated cost spent so far

Figures as on 12 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER A---1140114
TOWER B---1140114
TOWER C---1140114

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 12 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 17 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 90%.

Building: 29% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work90%
Foundation footing work90%
Upto Plinth Level60%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)60%
Retaining wall (All types)0%
RCC or MS Framed structure60%
Masonry Construction60%
Plastering inside , outside & Ceiling40%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work25%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 12 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasYes0%
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementNoNot applicable
TerraceYes0%
Outer WallYes0%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership6

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,972 sq m
Land owned byNot the promoter
Named landowners6
LandownerVillageDistrict
AGNEL JULIANA DSOUZA--
PRAMITHA DSOUZA--
PRAMITHA DSOUZA--
PRAMITHA DSOUZA--
PRAMITHA DSOUZA--
PRAMITHA DSOUZA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 85.00 cr
Cost incurredRs 5.10 cr
Spent of the estimate6.0%
BuildingWingEstimatedIncurred
-NARs 85.00 crRs 5.10 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKAUSHIK U
EngineerSHASHI KUMAR
Chartered AccountantJEEVAN SHETTY

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed147

As listed on the registration, under the names the promoter filed them with; the newest 80 of 147 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/318/PR/210625/007857 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Down Town_compressed.pdf12 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Downtwon Architecture Certificate Q2.pdf12 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Downtown Engineer Certificate Q 2.pdf12 Oct 2026
Q2 2026-27 Water supply and sewage board12 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)12 Oct 2026
Q2 2026-27 Fire and Safety12 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: form 4 downtown-compressed.pdf13 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Mandavi Downtown Architect.pdf13 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Maandavi Downtown Engineer.pdf13 Jul 2026
Q1 2026-27 Water supply and sewage board13 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)13 Jul 2026
Q1 2026-27 Fire and Safety13 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 DOWNTOWN_compressed.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Mandavi Downtown Architect.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: FORM 6 DOWNTOWN.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: mandavi constructions chartered accountants certificate quarterly _compressed.pdf17 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Mandavi constructions Architects certificate -compressed (1).pdf17 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Mandavi constructions Engineers certificate -compressed.pdf17 Jan 2026
Q3 2025-26 Water supply and sewage board17 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)17 Jan 2026
Q3 2025-26 KPTCL- BESCOM17 Jan 2026
Q3 2025-26 Fire and Safety17 Jan 2026
Original Single Plot layout planFile: Single site Plan.pdf19 Mar 2025
Original Single Plot layout planFile: Single site.pdf19 Mar 2025
Master planFile: CDP with proposed site.jpg19 Mar 2025
Village MapFile: VILLAGE MAP with proposed site.jpg19 Mar 2025
Building LicenseFile: Building License.pdf19 Mar 2025
ClarificationFile: Clarification.pdf19 Mar 2025
Original single site plan and orderFile: Original Single layout order with plan.pdf11 Mar 2025
Building licenseFile: Building License.pdf11 Mar 2025
Approved plansFile: approved plan.pdf11 Mar 2025
PlanFile: approved plan 1.pdf11 Mar 2025
planFile: approved plan 2.pdf11 Mar 2025
PlanFile: approved plan 3.pdf11 Mar 2025
PlanFile: approved plan 4.pdf11 Mar 2025
PlanFile: approved plan 5.pdf11 Mar 2025
PlanFile: approved plan 6.pdf11 Mar 2025
PlanFile: approved plan 7.pdf11 Mar 2025
Master PlanFile: CDP with proposed site.jpg11 Mar 2025
Village MapFile: VILLAGE MAP WITH PROPOSED SITE.jpg11 Mar 2025
KSPCBFile: KSPCB.pdf11 Mar 2025
latest dated self-attested copy of the Engineer license certificate.File: Engineer license dated.pdf11 Mar 2025
STP design drawingFile: STP.pdf11 Mar 2025
Mescom NOCFile: Mescom NOC Affidavit.pdf11 Mar 2025
Mescom LetterFile: Mescom letter.pdf11 Mar 2025
Mescom LetterFile: Mescom letter dt 04.pdf11 Mar 2025
Water NOCFile: Water NOC self attested.pdf11 Mar 2025
Airport NOC.File: Airport NOC.pdf11 Mar 2025
By LawFile: Bye Law.pdf11 Mar 2025
source of water supply to the projectFile: well 1.jpeg11 Mar 2025
wellFile: well 2.jpeg11 Mar 2025
wellFile: well.jpeg11 Mar 2025
Agreement for Sale (AFS)File: AOS new.pdf11 Mar 2025
ClarificationFile: Clarification.pdf11 Mar 2025
RTC, survey 293/4-
Mutation, survey 293/4-
Encumbrance Certificate, survey 293/4-
Conversion/Alienation Order, survey 293/4-
Sale/Title/Gift Deed, survey 293/4-
Khatha, survey 293/4-
RTC, survey 293/5-
Mutation, survey 293/5-
Encumbrance Certificate, survey 293/5-
Conversion/Alienation Order, survey 293/5-
Sale/Title/Gift Deed, survey 293/5-
Khatha, survey 293/5-
RTC, survey 293/6-
Mutation, survey 293/6-
Encumbrance Certificate, survey 293/6-
Conversion/Alienation Order, survey 293/6-
Sale/Title/Gift Deed, survey 293/6-
Khatha, survey 293/6-
RTC, survey 293/7-
Mutation, survey 293/7-
Encumbrance Certificate, survey 293/7-
Conversion/Alienation Order, survey 293/7-

How this compares with Udupi

59%of this project is bookeddistrict median 0%
22%of Udupi projects moved their completion datethis one has not
0%of Udupi registrations have lapsed or been cancelledthis one is on the register

Computed across the 260+ Udupi projects on ReraGenie, from their own filings.

Keep MANDAVI DOWNTOWN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Udupi260+ in Udupi

2 kmMANDAVI DOWNTOWNOther 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: MANDAVI CONSTRUCTIONS

MANDAVI CONSTRUCTIONS has 1 registration on RERA Karnataka, including MANDAVI DOWNTOWN. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Udupi district page.

Frequently asked questions

What are my rights if MANDAVI DOWNTOWN is delayed beyond 1 Mar 2034?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MANDAVI DOWNTOWN?

The registered promoter entity is MANDAVI CONSTRUCTIONS, a partnership firm as per the filing. Its GSTIN 29ABWFM3446PIZ5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MANDAVI DOWNTOWN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at MANDAVI DOWNTOWN?

The professionals named in the filing: Architect: KAUSHIK U; Engineer: SHASHI KUMAR; Chartered Accountant: JEEVAN SHETTY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MANDAVI DOWNTOWN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MANDAVI DOWNTOWN. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MANDAVI DOWNTOWN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.