ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / WISTERIA SQUARE 1

Registered No litigation declared Residential / Group Housing project

WISTERIA SQUARE 1

By RAJDEEP REALTORS

RG-MH-29248 · RERA P51700028141 · Last updated on MahaRERA portal: 18 Jul 2026

Source: official MahaRERA filing

Red flags

  • 8 complaints at MahaRERA
  • Completion date moved by 54 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 54 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 61%
71 of 355Units unsoldnot recorded sold or booked
8Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

WISTERIA SQUARE 1 is a Residential / Group Housing project by RAJDEEP REALTORS in Thane, Maharashtra, registered with MahaRERA as P51700028141 on 4 Feb 2021. Possession is promised by 31 Dec 2028. The completion date has moved by 54 months from the original filing. 284 of the 355 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 8 complaints are on record with the regulator.

At a glance

Project

  • NameWISTERIA SQUARE 1
  • TypeResidential / Group Housing
  • Location
    • GCC CLUB ROAD
    • VINAY NAGAR
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700028141
  • ReraGenie IDRG-MH-29248

Builder

  • NameRAJDEEP REALTORS
  • Entity typeCompany
  • DirectorKETAN TOKERSHI SHAH

Key dates

this monthRegisteredFeb 2021First promiseJun 2024Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Feb 2021
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed76 files

Current status

80%284 of 355 units booked
33.9%Work done, per cost certificate

Figures as on 18 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WISTERIA SQUARE 1NA232329956355

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 61%.

WISTERIA SQUARE 1: 34% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure61%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed322

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots322
Closed/Covered161
Open Space161

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area397 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 May 2025
LandownerVillageDistrict
RAVI DEVELOPMENTSBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMIRA BHAYANDER MUNICIPAL CORPORATION
Permissible FSI5000.0
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKANDIVALI WEST
Estimated costRs 77.40 cr
Cost incurredRs 26.23 cr
Work done33.89%
BuildingWingEstimatedIncurred
WISTERIA SQUARE 1NARs 69.66 crRs 26.23 cr
-NARs 7.74 cr-

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANISH AND ASSOCIATES
Architectzeeshan
EngineerSUBHASH SINGH
EngineerSUBASH SINGH
Chartered AccountantNITISH S DUBE
Chartered AccountantSAYAD ALI
Chartered AccountantBAJRANG PRAJAPAT
Chartered AccountantJyoti Wadhmode And Associates
Chartered AccountantJyoti Waghmode And Associates
PartnerRole in project
RAJDEEP REALTORS & DEVELOPERS PVT LTD-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700024318Jun 2024 → Jun 2025

Reason as filed by the promoterdocument uploaded

EA23072502171Jun 2024 → Dec 2028

Reason as filed by the promoterWe respectfully seek an extension of registration for Wisteria Square 1 up to 31/12/2028 due to multiple unforeseen but justifiable delays: 1. Regulatory Coordination Delays: There were unavoidable delays in obtaining revised building permissions and NOCs from concerned authorities despite timely submissions and proactive follow-ups. These procedural dependencies significantly extended our timelines. 2. Labour Shortages & Migration: The construction schedule was affected by intermittent labour shortages during FY 2023-2024, caused by seasonal migration patterns and post-pandemic workforce fluc

Complaints filed with MahaRERA8

Case no.ComplainantRespondentFiled
CC006000000396507TARNINDARSINGH JASWANTSINGH MEHTABRAJDEEP REALTORS16/07/2023
CC006000000397701MIRZA DANISH SALIM BAIGSQUARE YARDS03/10/2023
CC006000000591342kapil gagalRajdeep Reatilors07/08/2024
CC12400047Ganeshkumar AgrawalRAJDEEP REALTORS06/09/2024
CC12400139Seema Mangilal GuptaRAJDEEP REALTORS18/09/2024
CC12400913Shalini Seuli SridharSHALINI SEULI SRIDHAR28/11/2024
CC12502283Ashley Roydon RodriquesRAJDEEP REALTORS & DEVELOPERS PVT LTD07/07/2025
CC12602308Shivprasad Chetai KanojiaRAJDEEP REALTORS & DEVELOPERS PVT LTD19/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Jan 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Sept form 1.pdf18 Jul 2026
Withdrawal Update Form 2File: Sept form 2.pdf18 Jul 2026
Withdrawal Update Form 3File: Sept form 3.pdf18 Jul 2026
Form 1File: june 24 (1).pdf3 Jun 2025
Form 2File: Eng june 24 (1).pdf3 Jun 2025
Form 3File: CA Certificate Wisteria Sqaure JUNE 24 (1) (1).pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Q1.pdf3 Jun 2025
Form 1File: sept 24 (1).pdf3 Jun 2025
Form 2File: Eng sept 24 (1).pdf3 Jun 2025
Form 3File: CA Certificate Wisteria Sqaure SEP 24 (1).pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Q2.pdf3 Jun 2025
Form 1File: dec 24 (1).pdf3 Jun 2025
Form 2File: Eng dec 24 (1).pdf3 Jun 2025
Form 3File: CA Certificate Wisteria Sqaure DEC 24 (2).pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Q3.pdf3 Jun 2025
Form 1File: march 25 (1).pdf3 Jun 2025
Form 2File: Eng march 25 (1).pdf3 Jun 2025
Form 3File: CA Certificate Wisteria Sqaure MARCH 25 (1).pdf3 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Q4.pdf3 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.PDF14 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QA-WISTERIA SQUARE.pdf12 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank Declaration of Wisteria Squares.pdf6 Aug 2024
Declaration in FORM BFile: Affidavit Cum declaration.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate DT21.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate DT21-1.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect Certificate sep 21.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect Certificate dec 21.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect Certificate mar 22.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect Certificate june 22.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Architect Certificate sep 22.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect Certificate dec 22.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Architect Certificate mar 23.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Architect Certificate june 23.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Architect Certificate sep 23.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 Architect Certificate dec 23.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13 Architect Certificate mar 24.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14 Architect Certificate june 24.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: june 24.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 Engineer S Certificate Dt March 2024.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 Engineer S Certificate Dt Dec 2023.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Engineer S Certificate Dt Sep 2023.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Engineer S Certificate Dt June 2023.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Engineer S Certificate Dt March 2023.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer S Certificate Dt Dec 2022.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer S Certificate Dt Sep 2022.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer S Certificate Dt june 2022.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer S Certificate Dt March 2022.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer S Certificate Dt Dec 2021.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer S Certificate Dt Sep 2021.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer S Certificate Dt June 2021.pdf3 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer S Certificate Dt March 2021.pdf3 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate 20-21.pdf3 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate 21-22.pdf3 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate 22-23.pdf3 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate 23-24.pdf3 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance Certificate 23-24.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf3 Aug 2024
CERSAI detailsFile: CERSAI_Search_Report_200315913760_For_Asset_Based_Search_03_08_2024_15_03_11_909.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RJDP - CA - 01.pdf3 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DocScanner 03-Aug-2024 12-55 pm.pdf3 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Bhavya J Shah.pdf3 Aug 2024
Proforma of Agreement for saleFile: Agreement - Wisteria Square.pdf17 Jul 2024
Declaration in FORM BFile: 28-01-2021.pdf30 Jan 2021
PAN CardFile: KETAN T SHAH PAN CARD.pdf28 Jan 2021
OtherFile: Rajdeep Realtors 07-05-2012.pdf28 Jan 2021
Layout approvalFile: LAYOUT APPROVAL.pdf18 Jan 2021
Building plan approvalFile: MYSCAN_20190510_0005.PDF18 Jan 2021
Copy of the legal title reportFile: TITLE CERTIFICATE SURVEY NO-105 1-2 87-2 88-1C.pdf18 Jan 2021
Details of encumbrancesFile: Wisteria Square.pdf18 Jan 2021
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf18 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_20190510_0005.PDF18 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: CC COMPRESSED.pdf18 Jan 2021
Declaration in FORM BFile: Affidavit cum Declaration.pdf18 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate wisteria.pdf18 Jan 2021
Proforma of Allotment letterFile: Draft Allotment.pdf18 Jan 2021
Proforma of Allotment letterFile: Draft Offer Letter.pdf18 Jan 2021

How this compares with Thane

80%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 54 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WISTERIA SQUARE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VINAY NAGAR7,600+ in Thane

2 kmWISTERIA SQUARE 1Completed 39Lapsed / revoked 30Other 22Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: RAJDEEP REALTORS

RAJDEEP REALTORS has 1 registration on MahaRERA, including WISTERIA SQUARE 1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if WISTERIA SQUARE 1 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WISTERIA SQUARE 1?

The registered promoter entity is RAJDEEP REALTORS, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WISTERIA SQUARE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against WISTERIA SQUARE 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for WISTERIA SQUARE 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WISTERIA SQUARE 1?

The professionals named in the filing: Architect: ANISH AND ASSOCIATES; Architect: zeeshan; Engineer: SUBHASH SINGH; Engineer: SUBASH SINGH; Chartered Accountant: NITISH S DUBE; Chartered Accountant: SAYAD ALI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WISTERIA SQUARE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WISTERIA SQUARE 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WISTERIA SQUARE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.