ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4

Completed No litigation declared Residential / Group Housing project

Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4

By Wadhwa Construction and Infrastructure Private Limited

RG-MH-54249 · RERA P52000016274 · Last updated on MahaRERA portal: 10 Jun 2024

Source: official MahaRERA filing

Red flags

  • 6 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
7 of 11Construction stages donefurthest along: Staircases, 98%
6Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4 is a Residential / Group Housing project by Wadhwa Construction and Infrastructure Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000016274 on 2 May 2018. The registration is recorded completed; possession was promised by 30 Dec 2026. 6 complaints are on record with the regulator.

At a glance

Project

  • NameWise City, South Block Phase I, Plot RZ8 Building 4 Wing F4
  • TypeResidential / Group Housing
  • Location
    • 36 Mtr DP Road
    • Wadhwa Wise City
    • Wardoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000016274
  • ReraGenie IDRG-MH-54249

Builder

  • NameWadhwa Construction and Infrastructure Private Limited
  • Entity typeCompany
  • CINU70109MH2000PTC129871
  • GSTIN27AAACW5097J1ZU
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsNavin Amarlal Makhija, Manohar Moolchand Chhabria, Navin Amarlal Makhija, Manohar Moolchand Chhabria
  • Other registrations29 more →
  • Completed7 of 30
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredMay 2018PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 May 2018
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed109 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4NA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 98%.

Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%

Progress on shared amenities15

As on 10 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes5%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes4%
Street LightingYes2%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area601 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Valuable Properties Private LimitedMumbai SuburbanMumbai Suburban

Approvals and building plan

Permissible FSI15806.63
Proposed, not sanctioned14,659 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKrystal Building Water field Road, Bandra West Mumbai 400 098

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVisionary Design Architects
ArchitectHiten Sethi Associates
EngineerS R Estimation
Chartered AccountantGmj & Co.
PartnerRole in project
Wadhwa Construction and Infrastructure Private Limited-

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC006000000303252WADHWA CONSTRUCTIONS AND INFRASTRUCTURE PVT LTDMr. Himanshu Kolte09/11/2022
CC006000000334083WADHWA CONSTRUCTIONS AND INFRASTRUCTURE PVT LTDBasantidevi Paras Singh & Paras Bhulan Singh30/01/2023
CC006000000408502WADHWA CONSTRUCTION & INFRASTRUCTURE PRIVATE LIMITEDNagesh jagannath Atpale08/01/2024
CC006000000479944Raj Amar PathakWadhwa Construction & Infrastructure Pvt Ltd05/04/2024
CC12400328Paritosh Pramod PandyaWadhwa Construction and Infrastructure Private Limited04/10/2024
CC12502905VARSHA SHAMSUNDER SAMANTWadhwa Construction and Infrastructure Private Limited19/08/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Dec 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Dec 2023

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: F 4_001.pdf10 Jun 2024
Certificates of CA (Form 3)File: wing F4_001.pdf14 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: F4_001.pdf12 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F4.pdf11 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing F4_001.pdf4 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CIDCO_NAINA_Panvel_vardoli_ITP_BP-236_Amended perm_585_SAP_162_Amm4_OCC (3).pdf26 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: wing F4_001.pdf31 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F4.pdf3 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Wing F4.pdf3 May 2023
Disclosure of sold/ booked inventoryFile: Wing F4.pdf3 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F4.pdf11 Apr 2023
Certificates of CA (Form 3)File: F4.pdf11 Apr 2023
Certificates of CA (Form 3)File: F4.pdf28 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F4.pdf23 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F4.pdf23 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: F4.pdf23 Mar 2023
Disclosure of sold/ booked inventoryFile: F4.pdf23 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F4.pdf17 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: F4.pdf17 Feb 2023
Disclosure of sold/ booked inventoryFile: F4.pdf17 Feb 2023
Certificates of CA (Form 3)File: F4.pdf6 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) F4.pdf30 Jan 2023
Layout approvalFile: 2023-01-12 Wadhwa ITP Rev Master Layout.pdf16 Jan 2023
Copy of Layout Approval (in case of layout)File: 2023-01-12 Wadhwa ITP Rev Master Layout.pdf16 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: F4.pdf6 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: F4.pdf5 Jan 2023
Disclosure of sold/ booked inventoryFile: F4.pdf5 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annual Audit Report of Statutory CA (Form 5) (FY 2021-22) F4.pdf5 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F4.pdf4 Jan 2023
Building plan approvalFile: Approved drawings_7th Sep 2022.pdf26 Dec 2022
Layout approvalFile: Amended ITP Layout-20-05-2019.pdf26 Dec 2022
Copy of Layout Approval (in case of layout)File: Amended ITP Layout-20-05-2019.pdf26 Dec 2022
Building Plan Approval (IOD)File: Approved drawings_7th Sep 2022.pdf26 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: CCLetter.pdf26 Dec 2022
Proforma of Agreement for saleFile: Agreement for Sale.pdf22 Dec 2022
Certificates of CA (Form 3)File: F4.pdf14 Nov 2022
Declaration about Commencement CertificateFile: F4.pdf11 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wise City F4_March2022.pdf25 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Annexure F FORM 5 F4.pdf21 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: F4.pdf18 Apr 2022
Disclosure of sold/ booked inventoryFile: F4.pdf16 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F4.pdf13 Apr 2022
Certificates of CA (Form 3)File: F4.pdf1 Apr 2022
Certificates of CA (Form 3)File: F4.pdf31 Mar 2022
Certificates of CA (Form 3)File: F4.pdf29 Mar 2022
Certificates of CA (Form 3)File: F4.pdf16 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: F4.pdf14 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F4.pdf5 Feb 2022
Certificates of CA (Form 3)File: Wise City - CA Certificate - F4 - Sept 20_compressed_compressed.pdf27 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wise City F4_DEC-2021.pdf14 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F4.pdf3 Dec 2021
Certificates of CA (Form 3)File: Certi_17 - Wing F4_compressed-compressed.pdf22 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: F4.pdf8 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wise City F4_SEP-2021.pdf25 Oct 2021
Disclosure of sold/ booked inventoryFile: F4.pdf20 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wise City F4.pdf20 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F4.pdf19 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F4.pdf19 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: F4.pdf2 Jul 2021
Disclosure of sold/ booked inventoryFile: F4.pdf1 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: CIDCO_NAINA_Panvel_vardoli_ITP_BP-236_Amended perm_585_SAP_162_Amm1_CCLetter-13012021.pdf11 Mar 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2 Sept 2020_F4.pdf11 Mar 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Dec 2020-F4.pdf17 Feb 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Wise City - Mar'20-F4.pdf16 Feb 2021
Details of Restarting of Construction work post lockdownFile: POst-Covid-WiseCity.pdf20 Jul 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F4.pdf7 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wing F4.pdf7 Mar 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Wing F4.pdf7 Mar 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: F4.pdf7 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_ Panvel Building F4-30-09-19.pdf27 Jan 2020
Certificates of CA (Form 3)File: 300619 - Wing F4_compressed.pdf31 Dec 2019
Annual Audit Report of Statutory CA (Form 5)File: Wing F4.pdf19 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_Panvel building F4-30-06-2019.pdf11 Sep 2019
Details of encumbrancesFile: Ltr-Encumbrances-Promoters-Common.pdf12 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: Amended CC-16 Buildings-22052019_compressed.pdf11 Jul 2019
Certificates of CA (Form 3)File: 310319-WingF4.pdf11 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_Panvel Building F4-31-03-2019.pdf21 May 2019
Certificates of CA (Form 3)File: Wing F4.pdf20 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certi-Panvel F4 Build.pdf5 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_ Panvel Building F4-30-09-18.pdf8 Jan 2019

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Wise City, South Block Phase I, Plot RZ8 Bui on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadhwa Wise City5,900+ in Raigarh

2 kmWise City, South Block PCompleted 6Lapsed / revoked 5Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: Wadhwa Construction and Infrastructure Private Limited

Wadhwa Construction and Infrastructure Private Limited has 30 registrations on MahaRERA, including Wise City, South Block Phase I, Plot RZ8 Building 5 Wing D1 and Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4 is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4?

The registered promoter entity is Wadhwa Construction and Infrastructure Private Limited, a company as per the filing. Its CIN U70109MH2000PTC129871 and GSTIN 27AAACW5097J1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4?

The professionals named in the filing: Architect: Visionary Design Architects; Architect: Hiten Sethi Associates; Engineer: S R Estimation; Chartered Accountant: Gmj & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Wise City, South Block Phase I, Plot RZ8 Building 4 Wing F4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Wise City, South Block Phase I, Plot RZ8 Bui to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.