Home / Browse projects / Raigarh, Maharashtra / Wise City RZ8 Wing E2
Wise City RZ8 Wing E2
By Wadhwa Construction and infrastructure Private Limited
RG-MH-05855 · RERA P52000051752 · Last updated on MahaRERA portal: 28 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Rs 16.00 crore secured on the land, in favour of Axis Finance Limited
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Wise City RZ8 Wing E2 is a Residential / Group Housing project by Wadhwa Construction and infrastructure Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000051752 on 27 Jun 2023. Possession is promised by 31 Dec 2029. 59 of the 111 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameWise City RZ8 Wing E2
- TypeResidential / Group Housing
- Location
- 36 Mtr DP Road
- Wadhwa Wise City
- Wardoli
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000051752
- ReraGenie IDRG-MH-05855
Builder
- NameWadhwa Construction and infrastructure Private Limited
- Entity typeCompany
- CINU70109MH2000PTC129871
- GSTIN27AAACW5097J1ZU
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsManohar Moolchand Chhabria, Navin Amarlal Makhija
- Other registrations29 more →
- Completed7 of 30
- No longer live4 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jun 2023
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed84 files
Current status
Figures as on 28 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wise City RZ8 Wing E2 | NA | 31 | 30 | 111 | 0 | 111 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 33%.
Wise City RZ8 Wing E2: 22% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 10% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 20% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | Yes | 98% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 90% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 98% |
| Solid Waste Management And Disposal | Yes | 97% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 99% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed203
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Valuable Properties Private Limited | Mumbai Suburban | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wise City RZ8 Wing E2 | NA | Rs 27.16 cr | Rs 10.96 cr |
| - | NA | Rs 4.79 cr | Rs 57.67 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Hiten Sethi Associates |
| Architect | Visionary Design Architects |
| Engineer | Million Jobs Private Limited |
| Chartered Accountant | S.M.BHAT & ASSOCIATES |
| Partner | Role in project |
|---|---|
| Wadhwa Construction and infrastructure Private Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600058 | Bhakti Achrekar | Wadhwa Construction and infrastructure Private Limited | 12/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: E2_Form1_December 25.pdf | 28 May 2026 |
| Withdrawal Update Form 2File: E2_Form 2_December 2025.pdf | 28 May 2026 |
| Withdrawal Update Form 3File: E2_Form 3_December 2025.pdf | 28 May 2026 |
| Form 1File: FORM 1 E2.pdf | 19 Feb 2026 |
| Form 2File: E2.pdf | 19 Feb 2026 |
| Form 3File: E2_260122_165822.pdf | 19 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: E2.pdf | 19 Feb 2026 |
| Form 1File: E2.pdf | 19 Feb 2026 |
| Form 2File: E2 FORM 2 JUN25.pdf | 19 Feb 2026 |
| Form 3File: FORM 3 (Dec-24) - E2_June-2025.pdf | 19 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: E2.pdf | 19 Feb 2026 |
| Commencement Certificates / NA Order for plotted developmentFile: CIDCO_NAINA_Panvel_vardoli_ITP_BP-236_Amended perm_585_SAP_162_Amm4_Amm2_CCLetter.pdf | 22 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: E2.pdf | 13 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E2 FORM 2 DEC 24.pdf | 28 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: E2 disclosure of inventory dec24.pdf | 28 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: E2_page-0001.pdf | 11 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (Dec-24) - E2-Final.pdf | 11 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: E2.pdf | 15 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: E 2 june24.pdf | 15 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Wing E 2 sep 24.pdf | 15 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - E2 FY 2023-24.pdf | 5 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: wing E2.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (New Format) - E2 - Final - Updated.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (New Format) - E2 - Final.pdf | 18 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Wing E 2.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: wing E2.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (New Format) - E2 - Final - Updated.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (New Format) - E2 - Final.pdf | 18 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Wing E 2.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E2 FORM 2 JUN 24.pdf | 7 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E2 FORM 2 SEP 24.pdf | 7 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E2 FORM 2 SEP 24.pdf | 7 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E2 Form 2 March 24.pdf | 16 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAR-24 E2.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: wing E2_001.pdf | 2 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E 2_001.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: E 2_001.pdf | 11 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: wing E 2_001.pdf | 14 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Wing E2_001.pdf | 11 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: E2.pdf | 10 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: wing E2_001.pdf | 9 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RZ 8 wing E 2_001.pdf | 15 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E2.pdf | 11 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Wing E2_001.pdf | 4 Jan 2024 |
| Copy of the legal title reportFile: 2_10 Title report _26 06 2023.pdf | 26 Jun 2023 |
| Proforma of Agreement for saleFile: 13_AFS - With Deviation in Yellow 23-06-23.pdf | 26 Jun 2023 |
| Other - LegalFile: 24_Legal_E2 Tower.pdf | 26 Jun 2023 |
| Other - LegalFile: VPPL DA-WithAnnexures_Part-1_1-28.pdf | 26 Jun 2023 |
| Other - LegalFile: VPPL DA-WithAnnexures_Part-2_29-41.pdf | 26 Jun 2023 |
| Other - LegalFile: VPPL DA-WithAnnexures_Part-3_42-55.pdf | 26 Jun 2023 |
| Other - LegalFile: VPPL DA-WithAnnexures_Part-4_56-67.pdf | 26 Jun 2023 |
| Other - LegalFile: VPPL DA-WithAnnexures_Part-5_68-77.pdf | 26 Jun 2023 |
| Other - LegalFile: VPPL DA-WithAnnexures_Part-6_78-86.pdf | 26 Jun 2023 |
| Other - LegalFile: JDA - VPPL WCIPL _CTS Marking.pdf | 26 Jun 2023 |
| Other - LegalFile: Marathon DA_Registered-Part-1_1-24.pdf | 26 Jun 2023 |
| Other - LegalFile: Marathon DA_Registered-Part-2_25-47.pdf | 26 Jun 2023 |
| Other - LegalFile: Marathon DA_Registered-Part-3_48-66.pdf | 26 Jun 2023 |
| Deviation Report with respect to model copy of AgreementFile: 30 Deviations Agreement For Sale - E2.pdf | 13 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: 31 Deviations Allotment Letter E2.pdf | 9 Jun 2023 |
| Building plan approvalFile: Plan E2_4.pdf | 1 Jun 2023 |
| Building plan approvalFile: Plan E2_5.pdf | 1 Jun 2023 |
| Building plan approvalFile: Plan E2_6.pdf | 1 Jun 2023 |
| Building plan approvalFile: Plan E2_1.pdf | 1 Jun 2023 |
| Building plan approvalFile: Plan E2_2.pdf | 1 Jun 2023 |
| Building plan approvalFile: Plan E2_3.pdf | 1 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: 3_4 Details of Encumbrances concerned to Legal and Finance - E2.pdf | 1 Jun 2023 |
| Details of encumbrances concerned to LegalFile: 3_4 Details of Encumbrances concerned to Legal and Finance - E2.pdf | 1 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan E2_1.pdf | 1 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan E2_2.pdf | 1 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan E2_3.pdf | 1 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan E2_4.pdf | 1 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan E2_5.pdf | 1 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan E2_6.pdf | 1 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 22 -05-2013 -CIDCO_NAINA_Panvel_vardoli_ITP_BP-236_Amended perm_585_SAP_162_Amm4_CCLetter. | 1 Jun 2023 |
| Declaration about Commencement CertificateFile: 8 Declaration Commencement Certificate - Format D - E2.pdf | 1 Jun 2023 |
| CERSAI detailsFile: E2 - CERSAI Final.pdf | 1 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA - FORM 3 (New Format) - E2 - compressed.pdf | 1 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 29 Separate 70 Account - E2.pdf | 1 Jun 2023 |
| Layout approvalFile: 05 Wadhwa ITP Rev Master Layout.pdf | 30 May 2023 |
| PAN CardFile: 01 PAN Card.pdf | 30 May 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A1 | Wadhwa Wise City | 253 | Completed | Dec 2026 | Sep 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 29 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Wise City RZ8 Wing E2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wadhwa Wise City5,900+ in Raigarh
Filed coordinates, straight-line distance. 28 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Wadhwa Construction and infrastructure Private Limited
Wadhwa Construction and Infrastructure Private Limited has 30 registrations on MahaRERA, including Wise City, South Block Phase I, Plot RZ8 Building 5 Wing D1 and Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Wise City RZ8 Wing E2 is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Wise City RZ8 Wing E2?
The registered promoter entity is Wadhwa Construction and infrastructure Private Limited, a company as per the filing. Its CIN U70109MH2000PTC129871 and GSTIN 27AAACW5097J1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Wise City RZ8 Wing E2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Wise City RZ8 Wing E2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Wise City RZ8 Wing E2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Wise City RZ8 Wing E2?
The professionals named in the filing: Architect: Hiten Sethi Associates; Architect: Visionary Design Architects; Engineer: Million Jobs Private Limited; Chartered Accountant: S.M.BHAT & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Wise City RZ8 Wing E2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback