ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / Wise City RZ8 Wing D5

Registered No litigation declared Residential / Group Housing project

Wise City RZ8 Wing D5

By Wadhwa Construction and infrastructure Private Limited

RG-MH-75861 · RERA P52000080955 · Last updated on MahaRERA portal: 5 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 29 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Installation of Lifts, 30%
103 of 103Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Wise City RZ8 Wing D5 is a Residential / Group Housing project by Wadhwa Construction and infrastructure Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000080955 on 1 Sep 2025. Possession is promised by 31 Dec 2030. 0 of the 103 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameWise City RZ8 Wing D5
  • TypeResidential / Group Housing
  • Location
    • 36 Mtr DP Road
    • Wadhwa Wise City
    • Wardoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000080955
  • ReraGenie IDRG-MH-75861

Builder

  • NameWadhwa Construction and infrastructure Private Limited
  • Entity typeCompany
  • CINU70109MH2000PTC129871
  • GSTIN27AAACW5097J1ZU
  • DirectorsManohar Moolchand Chhabria, Navin Amarlal Makhija
  • Other registrations29 more →
  • Completed7 of 30
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed59 files

Current status

0%0 of 103 units booked
42.6%Work done, per cost certificate

Figures as on 5 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wise city RZ8 Building No 5 wing D5NA31291030103

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 30%.

Wise city RZ8 Building No 5 wing D5: 24% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure13%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 5 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes15%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes98%
Landscaping & Tree PlantingYes95%
Street LightingYes90%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes98%
Solid Waste Management And DisposalYes97%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes99%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed198

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots198
Open Space198

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area786 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Valuable Properties Private LimitedMumbai SuburbanMumbai Suburban

Approvals and building plan

Sanctioning authorityCIDCO-NAINA
Permissible FSI14385.33
Proposed, not sanctioned14,385 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Plot No. 206 221, 27Th Rd., Crystal Building, Waterfield Road, Bandra W, Mumbai.400050
Estimated costRs 69.09 cr
Cost incurredRs 29.46 cr
Work done42.63%
BuildingWingEstimatedIncurred
Wise city RZ8 Building No 5 wing D5NARs 62.18 crRs 25.04 cr
-NARs 6.91 crRs 4.42 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVisionary Design Architects
EngineerMillion Jobs Private Limited
Chartered AccountantS.M.BHATT & ASSOCIATES
PartnerRole in project
Wadhwa Construction and infrastructure Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 D5.pdf5 Mar 2026
Withdrawal Update Form 1File: FORM 1 D5.pdf5 Mar 2026
Withdrawal Update Form 2File: REVISED D5 FORM 2 (29-03-25).pdf5 Mar 2026
Withdrawal Update Form 2File: D5.pdf5 Mar 2026
Withdrawal Update Form 3File: Form 3 - D5 NEW.pdf5 Mar 2026
Withdrawal Update Form 3File: Form 3 - D5 NEW.pdf5 Mar 2026
Building plan approvalFile: CIDCO corrigendum dated 20_8_25 corrected building 5 type J D5.pdf20 Aug 2025
Building Plan Approval / NA Order for plotted developmentFile: CIDCO corrigendum dated 20_8_25 corrected building 5 type J D5.pdf20 Aug 2025
Commencement Certificates / NA Order for plotted developmentFile: CIDCO NAINA_dated 3rd July_CC E-mail confirmation.pdf24 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: CIDCO NAINA_dated 23rd July_CC E-mail Confirmation.pdf24 Jul 2025
Declaration about Commencement CertificateFile: CLARIFICATION QUERY.pdf24 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: OLD CC.pdf8 Jul 2025
Other - TechnicalFile: declaration D5 proportionate to land certificate.pdf7 Jul 2025
Building plan approvalFile: PODIUM DWG D5.pdf4 Jul 2025
Building plan approvalFile: 14-19 DRAWING 5.pdf4 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: PODIUM DWG D5.pdf4 Jul 2025
Building Plan Approval / NA Order for plotted developmentFile: 14-19 DRAWING 5.pdf4 Jul 2025
Other - TechnicalFile: DD D5_merged.pdf4 Jun 2025
Details of encumbrances concerned to FinanceFile: encumbrance legal and finance 20-05-25.pdf26 May 2025
Details of encumbrances concerned to LegalFile: encumbrance legal and finance 20-05-25.pdf26 May 2025
Other - TechnicalFile: ANNEXURE A -Declaration cum undertaking signed 10-07-25.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: REVISED D5 FORM 2 (29-03-25).pdf31 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A SCANNED.pdf29 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf29 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: merged disclosure secured-unsecured 26-06-25.pdf29 Mar 2025
Layout approvalFile: Amended ITP_08_10_2024 compressed.pdf12 Feb 2025
Building plan approvalFile: D5 Amended Submission Drawing for issuance-1 Pg no 1 FINAL 21-07-25.pdf12 Feb 2025
Building plan approvalFile: DRAWING 2.pdf12 Feb 2025
Building plan approvalFile: DRAWING 3.pdf12 Feb 2025
Building plan approvalFile: 13-19 DRAWING 4.pdf12 Feb 2025
Copy of Layout Approval (in case of layout)File: Amended ITP_08_10_2024 compressed.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA - FORM 3 (Wise City RZ8 Wing D5) - New Project - Revised 10-07-25-compressed.pdf12 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: D5 Amended Submission Drawing for issuance-1 Pg no 1 FINAL 21-07-25.pdf12 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: DRAWING 2.pdf12 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: DRAWING 3.pdf12 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 13-19 DRAWING 4.pdf12 Feb 2025
Details of encumbrances concerned to FinanceFile: encumbrance certificate d5 signed 26-06-25.pdf31 Jan 2025
Proforma of Allotment letterFile: Proforma of Allotment Letter - RZ 8 Wing D5 26-6-2025.pdf31 Jan 2025
Declaration in FORM BFile: WCIPL DECLARATION FORM B D5 TOWER date(2030).pdf31 Jan 2025
Other - LegalFile: VPPL DA-WithAnnexures_Part-1_1-28.pdf31 Jan 2025
Other - LegalFile: VPPL highlighted Survey nos-compressed.pdf31 Jan 2025
Other - LegalFile: VPPL DA-WithAnnexures_Part-6_78-86.pdf31 Jan 2025
Other - LegalFile: VPPL DA-WithAnnexures_Part-5_68-77.pdf31 Jan 2025
Other - LegalFile: VPPL DA-WithAnnexures_Part-3_42-55.pdf31 Jan 2025
Other - LegalFile: VPPL DA-WithAnnexures_Part-2_29-41.pdf31 Jan 2025
Other - LegalFile: VPPL DA-WithAnnexures_Part-4_56-67.pdf31 Jan 2025
Declaration about Commencement CertificateFile: Declaration CC REVISED 24-07-25.pdf31 Jan 2025
Deviation Report with respect to Allotment letterFile: Deviation Report- Model Allotment Letter RZ-8 Wing D5.pdf31 Jan 2025
Details of encumbrances concerned to LegalFile: encumbrance certificate d5 signed 26-06-25.pdf31 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Deviation report D5 Revised 24-07-2025 (1).pdf31 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: NM Disclosure of Interest Signed D5-compressed.pdf31 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: MMC Disclosure of Interest signed D5-compressed.pdf31 Jan 2025
PAN CardFile: 01 PAN Card.pdf30 Jan 2025
Copy of the legal title reportFile: The legal title report D5-25-06-25.pdf30 Jan 2025
Copy of the legal title reportFile: TitleCertificate-LawPoint-29Nov2018 revised n highlighted-25-06-25.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 D5 SIGNED.pdf30 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC 21-07-2025.pdf30 Jan 2025
CERSAI detailsFile: REVISED 2 CERSAI REPORT WITH UNDERTAKING 26-06-25.pdf30 Jan 2025
Proforma of Agreement for saleFile: Clean Version Proforma of Agreement -AFS- RZ 8 Wing D5 (in trackmode) RM -Mk 26-6-2025.pdf30 Jan 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A1Wadhwa Wise City253CompletedDec 2026Sep 2023

How this compares with Raigarh

0%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Wise City RZ8 Wing D5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadhwa Wise City5,900+ in Raigarh

2 kmWise City RZ8 Wing D5Completed 5Lapsed / revoked 3Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: Wadhwa Construction and infrastructure Private Limited

Wadhwa Construction and Infrastructure Private Limited has 30 registrations on MahaRERA, including Wise City, South Block Phase I, Plot RZ8 Building 5 Wing D1 and Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Wise City RZ8 Wing D5 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Wise City RZ8 Wing D5?

The registered promoter entity is Wadhwa Construction and infrastructure Private Limited, a company as per the filing. Its CIN U70109MH2000PTC129871 and GSTIN 27AAACW5097J1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Wise City RZ8 Wing D5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Wise City RZ8 Wing D5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Wise City RZ8 Wing D5?

The professionals named in the filing: Architect: Visionary Design Architects; Engineer: Million Jobs Private Limited; Chartered Accountant: S.M.BHATT & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Wise City RZ8 Wing D5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Wise City RZ8 Wing D5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Wise City RZ8 Wing D5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.