Home / Browse projects / Raigarh, Maharashtra / Wise City RZ-02 Plotted Development
Wise City RZ-02 Plotted Development
By Wadhwa Construction and Infrastructure Private Limited
RG-MH-66916 · RERA P52000048913 · Last updated on MahaRERA portal: 29 Apr 2026
Source: official MahaRERA filing
Red flags
- Litigation declared, 7 cases
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Wise City RZ-02 Plotted Development is a Plotted project by Wadhwa Construction and Infrastructure Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000048913 on 24 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2025. 53 of the 58 units on this registration are recorded sold or booked.
At a glance
Project
- NameWise City RZ-02 Plotted Development
- TypePlotted
- Location
- 36 m DP road
- Wise City ITP
- Wardoli
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000048913
- ReraGenie IDRG-MH-66916
Builder
- NameWadhwa Construction and Infrastructure Private Limited
- Entity typeCompany
- CINU70109MH2000PTC129871
- GSTIN27AAACW5097J1ZU
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsNavin Amarlal Makhija, Manohar Moolchand Chhabria, Navin Amarlal Makhija, Manohar Moolchand Chhabria
- Other registrations29 more →
- Completed7 of 30
- No longer live4 lapsed, de-registered or revoked
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on24 Jan 2023
- Promised completion31 Dec 2025
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed90 files
Current status
Figures as on 29 Apr 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 75% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Valuable Properties Private Limited | Mumbai Suburban | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 2.29 cr | Rs 1.17 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Spaceage Consultants Devayani Khadilkar |
| Architect | Visionary Design Architects |
| Engineer | Mahimtura Consultants |
| Engineer | Million Jobs Private Limited |
| Chartered Accountant | SM Bhat and Associates |
| Chartered Accountant | S M Bhat and associates |
| Partner | Role in project |
|---|---|
| Wadhwa Construction and Infrastructure Private Limited | - |
Litigation declared7
| Case | Court | Status |
|---|---|---|
| RCS 182/2014/2014 | Civil Judge Panvel | Matter not related to this Project Inadvertently added here |
| RCS 259/2015/2015 | Civil Judge Panvel | Matter not related to this Project Inadvertently added here |
| SCS 40/2016/2016 | Civil Judge Panvel | Matter not related to this Project Inadvertently added here |
| SCS 279/2016/2016 | Civil Judge Panvel | Matter not related to this Project Inadvertently added here |
| SCS 48/2014/2014 | Civil Judge Panvel | Matter not related to this Project Inadvertently added here |
| SCS 421/2014/2014 | Civil Judge Panvel | Matter not related to this Project Inadvertently added here |
| SCS 227/2009/2009 | Civil Judge Panvel | Matter not related to this Project Inadvertently added here |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 29 Apr 2026
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Completion CertificateFile: RZ 2 Approved Plans.pdf | 29 Apr 2026 |
| Completion CertificateFile: CC MAIL- H.pdf | 29 Apr 2026 |
| Completion CertificateFile: RZ-02-03_CC Letter_merged.pdf | 16 Mar 2026 |
| Completion CertificateFile: OC Mail.pdf | 16 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 SIGNED RZ-02.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 SIGNED RZ-02.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 SIGNED RZ-02.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 SIGNED RZ-02.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: RZ-02.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: RZ-02 FORM 2 JUN 24.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: RZ-02 FORM 2 JUN 24.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: RZ-02 FORM 2 JUN 24.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: RZ-02 FORM 2 JUN 24.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: RZ 02.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: RZ 02_001.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: RZ 02_001.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: RZ 02_001.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: RZ 02_001.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: Form_3_RZ02 - Final.pdf | 14 Jan 2026 |
| Commencement Certificates / NA Order for plotted developmentFile: CIDCO_NAINA_LT-00594_2023_Amm1_CCLetter.pdf | 10 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: RZ-02-03_CC Letter.pdf | 10 Mar 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: RZ-02 Form 4.pdf | 23 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RZ 02.pdf | 14 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: RZ-02.pdf | 13 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_RZ02 - Final.pdf | 12 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: RZ-02.pdf | 12 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: wise City Rz 02.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RZ-02-compressed.pdf | 9 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_RZ02 - Final.pdf | 7 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 RZ02 FY 2023-24.pdf | 7 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RZ-02 FORM 2 JUN 24.pdf | 6 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RZ-02 FORM 2 MARCH -24.pdf | 14 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MAR-24 RZ-02.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SIGNED RZ-02.pdf | 2 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: RZ-02.pdf | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RZ 02 _001 SIGNED.pdf | 10 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RZ 02_001.pdf | 10 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: RZ 02 _001.pdf | 14 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RZ 02_001.pdf | 11 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RZ-02.pdf | 10 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: wise city 02_001.pdf | 9 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RZ-02 signed form 1.pdf | 15 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: RZ02_Plotted Development.pdf | 14 Feb 2024 |
| Details of encumbrances concerned to LegalFile: RZ02_Plotted Development.pdf | 14 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RZ 02 Form 5 (2022-23).pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RZ-02_001.pdf | 11 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RZ-02_001.pdf | 4 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1_Architect Certificate_RZ-02 Jul-23.pdf | 11 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 EngineerCert_RZ02 Jul23.pdf | 11 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Revised Budget RZ02 Jul23.pdf | 11 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 RZ-2 Plotted Development - 31st May 2023.pdf | 17 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RZ-2 ENGINEER CERTIFICATE FORM 2.pdf | 17 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RZ 2 - May - 2023 new.pdf | 17 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: RZ-02_001.pdf | 11 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RZ-02.pdf | 19 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RZ-2.pdf | 19 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Completion certificate RZ-2.pdf | 16 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: RZ-02.pdf | 16 May 2023 |
| Disclosure of sold/ booked inventoryFile: RZ-02.pdf | 16 May 2023 |
| Copy of the legal title reportFile: RZ-02 Litigation letter with Plaints.pdf | 2 May 2023 |
| Proforma of Agreement for saleFile: AFS Plotted Development RERA Format with Annexures _8Feb23_compressed.pdf | 13 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of Encumbrances related to Legal and Finance RZ-02.pdf | 6 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of Encumbrances related to Legal and Finance RZ-02.pdf | 6 Feb 2023 |
| Layout approvalFile: RZ-02-03 Layout Approval 1-2.pdf | 17 Jan 2023 |
| Building plan approval or NA orderFile: NA not required 12-12-22_compressed.pdf | 17 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: RZ-02-03 Layout Approval 1-2.pdf | 17 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: NA not required 12-12-22_compressed.pdf | 17 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CIDCO_NAINA_LT-00594_2023_CCLetter.pdf | 17 Jan 2023 |
| Declaration about Commencement CertificateFile: Declaration for CC RZ-02.pdf | 17 Jan 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate projects.pdf | 16 Jan 2023 |
| Copy of the legal title reportFile: TITLE REPORT PANVEL IN RERA FORMAT-FurtherRevised.pdf | 21 Dec 2022 |
| Other - LegalFile: VPPL DA-WithAnnexures_Part-1_1-28.pdf | 21 Dec 2022 |
| Other - LegalFile: VPPL DA-WithAnnexures_Part-2_29-56.pdf | 21 Dec 2022 |
| Other - LegalFile: VPPL DA-WithAnnexures_Part-3_57-86 (1)-RZ02.pdf | 21 Dec 2022 |
| Other - LegalFile: RZ02 Plot Numbers highlighted.pdf | 21 Dec 2022 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER-RZ02(1).pdf | 19 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation to AFS 12-12-22.pdf | 19 Dec 2022 |
| Other - LegalFile: AFS Plotted Development RERA Format-12Dec2022.pdf | 19 Dec 2022 |
| Other - LegalFile: VPPL Letter RZ02.pdf | 12 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf | 7 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 29 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
Keep Wise City RZ-02 Plotted Development on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Wise City ITP5,900+ in Raigarh
Filed coordinates, straight-line distance. 38 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Wadhwa Construction and Infrastructure Private Limited
Wadhwa Construction and Infrastructure Private Limited has 30 registrations on MahaRERA, including Wise City, South Block Phase I, Plot RZ8 Building 5 Wing D1 and Wise City, South Block Phase I, Plot RZ8 Building 1 Wing A1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Wise City RZ-02 Plotted Development is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Wise City RZ-02 Plotted Development?
The registered promoter entity is Wadhwa Construction and Infrastructure Private Limited, a company as per the filing. Its CIN U70109MH2000PTC129871 and GSTIN 27AAACW5097J1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Wise City RZ-02 Plotted Development?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Wise City RZ-02 Plotted Development?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Wise City RZ-02 Plotted Development?
The professionals named in the filing: Architect: Spaceage Consultants Devayani Khadilkar; Architect: Visionary Design Architects; Engineer: Mahimtura Consultants; Engineer: Million Jobs Private Limited; Chartered Accountant: SM Bhat and Associates; Chartered Accountant: S M Bhat and associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Wise City RZ-02 Plotted Development?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback