Home / Browse projects / Pune, Maharashtra / WESTWOOD ESTATES PHASE II

Completed No litigation declared Residential / Group Housing project

WESTWOOD ESTATES PHASE II

By A K CONSTRUCTIONS

RG-MH-47378 · RERA P52100019780 · Last updated on MahaRERA portal: 3 Mar 2025

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
12 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

WESTWOOD ESTATES PHASE II is a Residential / Group Housing project by A K CONSTRUCTIONS in Pune, Maharashtra, registered with MahaRERA as P52100019780 on 5 Mar 2019. The registration is recorded completed; possession was promised by 30 Jun 2023.

At a glance

Project

  • NameWESTWOOD ESTATES PHASE II
  • TypeResidential / Group Housing
  • Location
    • WAKAD ROAD
    • KASPATEWASTI
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100019780
  • ReraGenie IDRG-MH-47378

Builder

  • NameA K CONSTRUCTIONS
  • Entity typePartnership
  • PartnersRAHUL KALATE, SMT ASHA ARUN SANE
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2019PromisedJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Mar 2019
  • Promised completion30 Jun 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed96 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RESIDENTIAL WING CNA130000
RESIDENTIAL WING DNA130000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.

RESIDENTIAL WING C81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
RESIDENTIAL WING D80%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 3 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed54

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots54
Closed/Covered54
BuildingClosed/CoveredTotal
RESIDENTIAL WING C2626
RESIDENTIAL WING D2828

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,224 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
SITARAM R KASPATEWakadPune
KRISHNA R KASPATEWakadPune
SAMPAT KASPATEWakadPune
TARABAI D KASPATEWakadPune
VIKAS D KASPATEWakadPune
RAHUL KASPATEWakadPune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL AUTHORITY
Permissible FSI8501.0
Proposed, not sanctioned3,980 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFORT MUMBAI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAMESH TEPAN
EngineerSTRUDCOM CONSULTANTS PVT LTD
PartnerRole in project
A K CONSTRUCTIONS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100016952Jun 2023 → Jun 2024

Reason as filed by the promoterThe two building consists of 13 floor each. We would like to state that, at the time of registration of the project, the firm had received sanction upto 12 floors only. However, there was considerable time required for getting the sanction of 13 floor and the firm received sanction for 13rd floor on 29/03/2022 vide PCMC sanction letter reference no. 47/2022 dated 29/03/2022 viz commencement certificate no. B.P./Wakad/47/2022. Hence, extension for completion is requested for execution of balance floor till 28/06/2024.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Nov 2024

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: FORM 4_PHASE II.pdf3 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-06-2023-1-3.pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-09-2023.pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-12-2023.pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-03-2024.pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-06-2024.pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-09-2024.pdf11 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-12-2024.pdf11 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: PHASE II.pdf11 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: AK Construction Form 5.pdf25 Dec 2024
Disclosure of sold/ booked inventoryFile: Ak Sales inventory 5-07-23.pdf29 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Phase II OC.pdf7 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Westwoods FORM 5.pdf5 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer.pdf26 Jun 2023
Certificates of CA (Form 3)File: C A Form 3 A K Construction.pdf26 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A K Construction Architect Form 1.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: AK cons inventory.pdf20 Apr 2023
Disclosure of sold/ booked inventoryFile: Inventory.pdf20 Apr 2023
Certificates of CA (Form 3)File: Phase II Form 3 31-12-22.pdf23 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A K Construction Rera Engineer FORM 2.pdf17 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf13 Oct 2022
Certificates of CA (Form 3)File: Form 3 AK Cons_SIGNED.pdf12 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer FORM 2 A K Construction.pdf11 Oct 2022
Disclosure of sold/ booked inventoryFile: C D inventory.pdf11 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: AK Cons form 5 21-22.pdf6 Oct 2022
Certificates of CA (Form 3)File: Form 3.pdf6 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_PhaseII-compressed.pdf9 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase II.pdf8 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase II.pdf8 Jul 2022
Certificates of CA (Form 3)File: A K CONSTRUCTION FORM -3_compressed-compressed.pdf26 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf7 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Phase II_compressed.pdf7 Apr 2022
Form 2AFile: Form 2A _Phase II.pdf31 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf22 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 AK.pdf22 Jan 2022
Certificates of CA (Form 3)File: Form 3.pdf22 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: 2 Commencement Certificates _ NA Order for plotted development.pdf20 Oct 2021
Building plan approvalFile: 3Building C 8 to 11.pdf18 Oct 2021
Building plan approvalFile: 5Building D 1 to 7 Floor.pdf18 Oct 2021
Building plan approvalFile: Building D 8 to 11.pdf18 Oct 2021
Layout approvalFile: 1Layout plan.pdf18 Oct 2021
Copy of Layout Approval (in case of layout)File: 1Layout plan.pdf18 Oct 2021
Building Plan Approval (IOD)File: 3Building C 8 to 11.pdf18 Oct 2021
Building Plan Approval (IOD)File: 5Building D 1 to 7 Floor.pdf18 Oct 2021
Building Plan Approval (IOD)File: Building D 8 to 11.pdf18 Oct 2021
Declaration about Commencement CertificateFile: A k const1.pdf14 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Westwood phase 2 _30092021_compressed.pdf7 Oct 2021
Certificates of CA (Form 3)File: PHASE II as on 30092021 Signed.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: AK CONST PHASE II FORM 5FY 2021.pdf2 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf14 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Form 2AQ12122PII.pdf14 Aug 2021
Disclosure of sold/ booked inventoryFile: Sold Unsold C D.pdf14 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf13 Aug 2021
Certificates of CA (Form 3)File: Form 3 Signed_compressed.pdf13 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AK Constructions Engineer Certificate Phase II.PDF9 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: AK CONS PHASE-II FORM 5-min.pdf25 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert .pdf21 Sep 2020
Certificates of CA (Form 3)File: Phase II - AK Constr- Westwood (1)_compressed.pdf25 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert phase 2 .pdf24 Feb 2020
Certificates of CA (Form 3)File: RERA Certificate- AK Construction- Phase II_compressed (1).pdf21 Jan 2020
Form 2AFile: Cert 01 Quality Assurance Certificate Form 2A.pdf11 Jan 2020
Form 2AFile: Cert No 02 Quality Assurance.pdf11 Jan 2020
Form 2AFile: Cert No 03 Quality Assurance.pdf11 Jan 2020
Certificates of CA (Form 3)File: CA RERA Certificate Phase II.pdf8 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certi phase 2.pdf3 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AK phase 2 cert.pdf26 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert Phase 2.pdf21 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: AK CoN phase 2_compressed.pdf20 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate 300619.pdf18 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certi 2 3062019.pdf18 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ak phase 2 cert 3.pdf5 Sep 2019
Certificates of CA (Form 3)File: CA Certificates 300619.pdf5 Sep 2019
Certificates of CA (Form 3)File: ak phase 2 cert 3.pdf5 Sep 2019
Certificates of CA (Form 3)File: FORM 3_WEST WOOD PH 2.pdf20 Aug 2019
Form 2AFile: Quality Assurance Certificate Form 2A.pdf15 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CA Certificate Phase II 31032019.pdf7 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Cert Phase II 28032019.pdf7 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert PhaseII.pdf7 Jun 2019
Certificates of CA (Form 3)File: CA Certificate Phase 31032019.pdf7 Jun 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WESTWOOD ESTATES PHASE II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KASPATEWASTI13,700+ in Pune

Builder: A K CONSTRUCTIONS

A K CONSTRUCTIONS has 2 registrations on MahaRERA, including WESTWOOD ESTATES PHASE I and WESTWOOD ESTATES PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if WESTWOOD ESTATES PHASE II is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WESTWOOD ESTATES PHASE II?

The registered promoter entity is A K CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WESTWOOD ESTATES PHASE II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for WESTWOOD ESTATES PHASE II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WESTWOOD ESTATES PHASE II?

The professionals named in the filing: Architect: RAMESH TEPAN; Engineer: STRUDCOM CONSULTANTS PVT LTD. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WESTWOOD ESTATES PHASE II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WESTWOOD ESTATES PHASE II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WESTWOOD ESTATES PHASE II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.