Home / Browse projects / Pune, Maharashtra / WEONE 121

Registered No litigation declared Others project

WEONE 121

By GRD INFRAPROJECTS PRIVATE LIMITED

RG-MH-74934 · RERA P52100049391 · Last updated on MahaRERA portal: 27 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 19 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 19 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
36 of 49Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 107 documents Report an error

WEONE 121 is a Others project by GRD INFRAPROJECTS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100049391 on 7 Feb 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 19 months from the original filing. 13 of the 49 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameWEONE 121
  • TypeOthers
  • Location
    • -
    • Wakad
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049391
  • ReraGenie IDRG-MH-74934

Builder

  • NameGRD INFRAPROJECTS PRIVATE LIMITED
  • Entity typeCompany
  • ChairpersonDEVIDAS RAMDAS ATTARDE
  • Managing DirectorGaurav Devidas Attarde
  • Other registrations3 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2023First promiseMay 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 May 2025)
  • Buildings1 building record
  • Documents filed107 files

Current status

27%13 of 49 units booked
62.0%Work done, per cost certificate

Figures as on 27 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WEONE 121NA8748149

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

WEONE 121: 50% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises72%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 27 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed112

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots112
Closed/Covered112

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,270 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Jun 2025
LandownerVillageDistrict
MEERA RAVINDRA DUBEY AND OTHERSPimple NilakhPune
Ramdas Natha NilakhThane (M Corp.)Thane
Santosh Panjabrao GavhaleNavi Mumbai (M Corp.)Thane
Subhash Rajaram Gaikwad-Mumbai City

Approvals and building plan

Sanctioning authorityPCMC
Permissible FSI1703.61
Proposed, not sanctioned1,704 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCity Tower, A Wing,Ganesh Nagar, Dapodi,Pune-411012
Estimated costRs 5.75 cr
Cost incurredRs 3.56 cr
Work done62.0%
BuildingWingEstimatedIncurred
WEONE 121NARs 5.75 crRs 3.56 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN ASSOCIATES ARCHITECTURAL CONSULTANTS
EngineerSuhel Abbas Patel
EngineerANIL Bawaskar
EngineerPRANAV MANOJ KHALATE
Chartered AccountantV S A P & Company
Chartered AccountantPILLAY & ASSOCIATES
Chartered AccountantSnehal G Patil
Chartered AccountantPravin Pise & Associates
PartnerRole in project
GRD Infraprojects Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA18072502101May 2025 → Dec 2026

Reason as filed by the promoterDelay reason- My project is approximately 80% complete. The delay has occurred due to revisions in the project planning arising from an increase in the approved FSI and TDR, which required additional design changes, approvals, and execution time. Hence, I request an extension of one additional year to complete the project.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed107

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 107 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Weone 121 Form 1.pdf27 Jul 2026
Withdrawal Update Form 2File: Form 2 - Weone 121.pdf27 Jul 2026
Withdrawal Update Form 3File: F 3 - WEONE 121_compressed.pdf27 Jul 2026
Withdrawal Update Form 1File: Weone 121 - Form 1 FY25-26 Q4_page-0001 (1).pdf10 May 2026
Withdrawal Update Form 2File: Weone 121 Form 2 FY25-26 Q4_page-0002.pdf10 May 2026
Withdrawal Update Form 3File: Form 3 - Weone 121.pdf10 May 2026
Form 2A (FY 2024-2025)File: FORM 2A 2024-2025 GRD 121.pdf1 May 2026
Form 2A (FY 2025-2026)File: FORM 2A 2025-2026 GRD 121.pdf1 May 2026
Building plan approvalFile: PLAN 1 .pdf1 Apr 2026
Building plan approvalFile: PLAN 2.pdf1 Apr 2026
Building plan approvalFile: PLAN 3.pdf1 Apr 2026
Building plan approvalFile: PLAN 4.pdf1 Apr 2026
Building plan approvalFile: PLAN 5.pdf1 Apr 2026
Building plan approvalFile: PLAN 6.pdf1 Apr 2026
Withdrawal Update Form 1File: Q 3 form 1 121 .pdf1 Apr 2026
Withdrawal Update Form 2File: Q 3 FORM 2 121.pdf1 Apr 2026
Withdrawal Update Form 3File: Q3 -2025 Weone 121 - .pdf1 Apr 2026
Withdrawal Update Form 1File: 121 Form 1 JULY TO SEP.pdf29 Mar 2026
Withdrawal Update Form 2File: 121 Form 2 JULY TO SEP.pdf29 Mar 2026
Withdrawal Update Form 3File: WO 121 Form 3 JULY TO SEP.pdf29 Mar 2026
Form 5 (FY 2024-2025)File: FORM 5 121 24 25.pdf23 Dec 2025
Form 1File: Form 1.pdf11 Jun 2025
Form 2File: Form 2.pdf11 Jun 2025
Form 3File: form 3.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf11 Jun 2025
Self-declaration of Quarterly ProgressFile: delcartion self.pdf11 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Weone 121.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Signed Form 1.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q 3 2024-25 WO 121.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certificate WO 121 Q3.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: Promoter Disclosure FY 24-25 Q1.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: WO 121 Form 1.pdf25 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WO 121 Form 2.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 FY 2024-25 Q1 W-121.pdf25 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3FY 23-24 Q-121.pdf27 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 FY 23-24 Q4 W121.pdf20 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 FY 23-24 Q4 W-121.pdf20 May 2024
Disclosure of sold/ booked inventoryFile: Promoter Disclosure W-121 Q4.pdf20 May 2024
CERSAI detailsFile: CERSAI GRD Search Report.PDF5 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Weone 121 Q3 2023-24.pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Weone 121 Form 2 Engineer Certificate Q3.pdf6 Mar 2024
Disclosure of sold/ booked inventoryFile: Promoters Disclosure unit wise Weone 121 Q3.pdf6 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 CA Certificate Weone 121 FY 23-24 Q3.pdf6 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual Audit Signed (W121) FY 22-23.pdf14 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Weone 121 RERA quarterly update Architect Certificate - Form 1 30-09-2023.pdf9 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate - Form 2 Weone 121 Dt 30-09-2023.pdf9 Nov 2023
Disclosure of sold/ booked inventoryFile: Weone 121 Dicloser List Sold and unsold Dt 30-09-2023.pdf9 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 -Q2 Weone 121.pdf9 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A-Declaration for separate bank account (2).pdf13 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A.pdf21 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 Q1.pdf2 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Form 2 W 121.pdf2 Aug 2023
Disclosure of sold/ booked inventoryFile: Promoter Disclosure Q1 W 121.pdf2 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - WEONE- 121 Q1.pdf2 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (W 121) Q4.pdf7 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate form 2 Weone 121 Q4.pdf7 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer certificate - Form 2A (FY 2022-23) W 121.pdf7 Jun 2023
Disclosure of sold/ booked inventoryFile: Promoter Disclosure - W121 Q4.pdf7 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - WEONE- 121 Q4.pdf7 Jun 2023
Building plan approvalFile: Plan No 1.pdf27 May 2023
Building plan approvalFile: Plan No 2.pdf27 May 2023
Building plan approvalFile: Plan No 3.pdf27 May 2023
Building plan approvalFile: Plan No 4.pdf27 May 2023
Building plan approvalFile: Plan No 5.pdf27 May 2023
Building plan approvalFile: Plan No 6.pdf27 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 1.pdf27 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 2.pdf27 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 3.pdf27 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 4.pdf27 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 5.pdf27 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan No 6.pdf27 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Dated 23-05-2023.pdf27 May 2023
Other - LegalFile: RERA Declaration of Weone 121.pdf16 Jan 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale_compressed.pdf13 Jan 2023
Copy of the legal title reportFile: Search Of GRD dt.pdf5 Jan 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of legal encumbrances concerned to.pdf5 Jan 2023
Details of encumbrances concerned to FinanceFile: 2 b Details of encumbrances concerned to finance.pdf5 Jan 2023
Details of encumbrances concerned to LegalFile: 1 a Details of legal encumbrances concerned to.pdf5 Jan 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Gaurav ResidencyS. No.128-67CompletedJul 2014Jul 2014

How this compares with Pune

27%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 19 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WEONE 121 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

2 kmWEONE 121Completed 53Lapsed / revoked 32Other 60Dot size: filed unitsN

Filed coordinates, straight-line distance. 145 registered projects within 2 km.

Builder: GRD INFRAPROJECTS PRIVATE LIMITED

GRD INFRAPROJECTS PRIVATE LIMITED has 4 registrations on MahaRERA, including Gaurav Pride and WESTFIELD 3. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if WEONE 121 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WEONE 121?

The registered promoter entity is GRD INFRAPROJECTS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WEONE 121?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for WEONE 121?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WEONE 121?

The professionals named in the filing: Architect: DESIGN ASSOCIATES ARCHITECTURAL CONSULTANTS; Engineer: Suhel Abbas Patel; Engineer: ANIL Bawaskar; Engineer: PRANAV MANOJ KHALATE; Chartered Accountant: V S A P & Company; Chartered Accountant: PILLAY & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WEONE 121?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WEONE 121. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WEONE 121 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.