WADHWA RHODESIA PHASE-II

By WADHWA BUILDCON LLP

RG-MH-25141 · RERA P51700007370 · Last updated on MahaRERA portal: 26 Mar 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 60 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 60 months from the original
0 of 11Construction stages donefurthest along: Excavation, 50%
0Complaints at MahaRERAon this registration
Jump to the 45 documents Report an error

WADHWA RHODESIA PHASE-II is a Others project by WADHWA BUILDCON LLP in Thane, Maharashtra, registered with MahaRERA as P51700007370 on 17 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 60 months from the original filing.

At a glance

Project

  • NameWADHWA RHODESIA PHASE-II
  • TypeOthers
  • Location
    • BHIWANDI
    • Bhiwandi (M Corp.)
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700007370
  • ReraGenie IDRG-MH-25141

Builder

  • NameWADHWA BUILDCON LLP
  • Entity typePartnership
  • Other registrations4 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseDec 2022Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed45 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHIV CRYSTALNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 50%.

SHIV CRYSTAL: 5% average across the applicable activities

ActivityProgress
Excavation50%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,949 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6349.4
Proposed, not sanctioned3,949 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBANK OF INDIA PANCHPAKHADI THANE WEST

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectK K AND ASSCIOATES
EngineerKHANIS AND ASSOCIATES
PartnerRole in project
WADHWA BUILDCON LLP-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019363Dec 2022 → Dec 2027

Reason as filed by the promoterAs per Attachment

EXT51700013226Dec 2022 → Dec 2023

Reason as filed by the promoterWe, Wadhwa Buildcon LLP, have registered for our real estate project "Wadhwa Rhodesia Phase II" bearing registration no. P51700007370. The date of completion of the project was given as 30.12.2022 at the time of registration. However, we couldn’t complete said project within the stipulated period due to shortage of sand, inadequate labour supply and changes in policies. The finishing work, fire- fighting NOC, electricity main line connection and solar work are yet to be completed. We request to kindly accept our application and grant us the extension till 30.12.2023.

Litigation declared1

CaseCourtStatus
2946/MB/2019/2019NATIONAL COMPANY LAW TRIBUNALCOMPANY IS UNDER INSOLVANCY PROCEEDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed45

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B - Rhodesia phase II (1).pdf26 Mar 2024
Certificates of CA (Form 3)File: Revised Form-3 Mar 2023_compressed.pdf20 Mar 2024
Certificates of CA (Form 3)File: FORM 3 (PHASE-II) - Signed_compressed.pdf11 Mar 2024
Certificates of CA (Form 3)File: FORM 3 (PHASE-II) - Signed - converted.pdf11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 (PHASE-II).pdf11 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Wadhwa Rhodesia Form 2A (Phase - II)_compressed.pdf27 Feb 2024
Disclosure of sold/ booked inventoryFile: D TYPE Crystal.pdf27 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - Phase II Dec23.pdf16 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar23_compressed.pdf16 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June23_compressed.pdf16 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sept23_compressed.pdf16 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec23_compressed.pdf16 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 REVISED.pdf8 Aug 2023
Declaration about Commencement CertificateFile: FORM D - Wadhwa Buildcon LLP.pdf13 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2 (FY 2021-22) Q2 to Q4_compressed.pdf13 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2 (FY 2021-22) Q2 to Q4_compressed.pdf13 Feb 2023
Disclosure of sold/ booked inventoryFile: Rhodesia Stock (Phase-II)_compressed.pdf13 Feb 2023
Certificates of CA (Form 3)File: June 2020-signed.pdf7 Jan 2023
Certificates of CA (Form 3)File: Sep-2020-signed.pdf7 Jan 2023
Certificates of CA (Form 3)File: Dec-2020-signed.pdf7 Jan 2023
Certificates of CA (Form 3)File: Mar 21-signed.pdf7 Jan 2023
Certificates of CA (Form 3)File: June -signed.pdf7 Jan 2023
Certificates of CA (Form 3)File: sep-2021-signed.pdf7 Jan 2023
Certificates of CA (Form 3)File: Dec-21-signed.pdf7 Jan 2023
Certificates of CA (Form 3)File: march22-signed.pdf7 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Scanned Form 5 FY 20-21.pdf7 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Scanned Form5 FY 21-22.pdf7 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Phase II 200922 Compressed.pdf3 Dec 2022
Certificates of CA (Form 3)File: form 3 2018-19 C.pdf9 Sep 2021
Certificates of CA (Form 3)File: form 3 2019-20 C.pdf9 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5-Wadhwa Rhodesia-PhaseII 18-19.pdf9 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5-Wadhwa Rhodesia-PhaseII 19-20.pdf9 Sep 2021
Certificates of CA (Form 5)File: Form 5 Wadhwa Rhodesia (1).pdf10 Dec 2018
Layout approvalFile: WADHWA RHODESIA 7 PLANS.pdf31 Jul 2017
Building plan approvalFile: CC OF WADHWA RHODESIA.pdf31 Jul 2017
Copy of the legal title reportFile: Title Report-min.pdf31 Jul 2017
Details of encumbrancesFile: Index-II-Bank of India.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: WADHWA RHODESIA 7 PLANS.pdf31 Jul 2017
Building Plan Approval (IOD)File: CC OF WADHWA RHODESIA.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC OF WADHWA RHODESIA.pdf31 Jul 2017
Declaration in FORM BFile: WADHWA RHODESIA PHASE - II ( FORM B).pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-Final.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2-FINAL.pdf31 Jul 2017
Certificates of CA (Form 3)File: FORM-3.pdf31 Jul 2017
Proforma of Allotment letterFile: Agreement for sale- Wadhwa Rodeshia-Rera.pdf31 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 60 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WADHWA RHODESIA PHASE-II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHIWANDI7,600+ in Thane

2 kmWADHWA RHODESIA PHASE-IICompleted 30Lapsed / revoked 24Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 84 registered projects within 2 km.

Builder: WADHWA BUILDCON LLP

WADHWA BUILDCON LLP has 5 registrations on MahaRERA, including WADHWA RHODESIA and WADHWA RHODESIA PHASE-II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if WADHWA RHODESIA PHASE-II is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WADHWA RHODESIA PHASE-II?

The registered promoter entity is WADHWA BUILDCON LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WADHWA RHODESIA PHASE-II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for WADHWA RHODESIA PHASE-II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WADHWA RHODESIA PHASE-II?

The professionals named in the filing: Architect: K K AND ASSCIOATES; Engineer: KHANIS AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WADHWA RHODESIA PHASE-II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WADHWA RHODESIA PHASE-II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WADHWA RHODESIA PHASE-II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.