Wadhwa 723 Avenue

By Harshvardhan Constructions

RG-MH-48090 · RERA P51800050698 · Last updated on MahaRERA portal: 19 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 5 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2026Possession promised5 months past this date
1 of 11Construction stages donefurthest along: Basement (if any), 95%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Wadhwa 723 Avenue is a Commercial project by Harshvardhan Constructions in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050698 on 28 Apr 2023. Possession was promised by 31 May 2026 and is now 5 months past that date.

At a glance

Project

  • NameWadhwa 723 Avenue
  • TypeCommercial
  • Location
    • Marol Co-operative Industrial Estate Road
    • Village Marol lying and being at Hissa 10
    • Survey No. 49
    • Marol
    • Andheri
    • Mumbai Suburban
    • 400059
  • Pincode400059
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800050698
  • ReraGenie IDRG-MH-48090

Builder

  • NameHarshvardhan Constructions
  • Entity typePartnership
  • GSTIN27AADFH6590D1ZD
  • PartnersManoj Vasudev Wadhwa, Minal Manoj Wadhwa, Harshvardhan Manoj Wadhwa
  • Declared earlier projects3 →

Key dates

5 months past promisethis monthRegisteredApr 2023PromisedMay 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on28 Apr 2023
  • Promised completion31 May 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wadhwa 723 AvenueNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 95%.

Wadhwa 723 Avenue: 28% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)0%
Plinth95%
Stilt Floor5%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed133

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots133
Closed/Covered133

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,731 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Sep 2024
LandownerVillageDistrict
Harshvardhan ConstructionsBandraMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4350.68
Proposed, not sanctioned1,731 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLandmark Building Pali Naka Pali Hill Bandra West Mumbai - 400050

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Harshvardhan Constructions-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 MARCH 2025.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DEC 2024.pdf16 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certficate for March Quater 2025.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Sep 2024.pdf18 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_-_Wadhwa_723_as_on_Sep_2024 (1).pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certficate for December Quater 2024.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certficate for September Quater 2024.pdf12 Feb 2025
Building plan approvalFile: Amend letter 24-6-24.pdf7 Oct 2024
Building plan approvalFile: Sanctioned Plans - New Approvals.pdf7 Oct 2024
Building plan approvalFile: Amend letter 24-6-24.pdf7 Oct 2024
Building plan approvalFile: Sanctioned Plans - New Approvals.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 - June_Qtr_2024.pdf7 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Amend letter 24-6-24.pdf7 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans - New Approvals.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate - June QTR 2024.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 - June_Qtr_2024.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate - June QTR 2024.pdf7 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Amend letter 24-6-24.pdf7 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plans - New Approvals.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_March_Qtr_2024.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certficate for June Quater 2024.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2-Wadhwa_723.pdf26 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certficate.pdf4 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Dec-23.pdf23 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Wadhwa 723 Avenue as on Dec 2023.pdf5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certficate.pdf23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_-_3_Final_18_01_2024_HC_Signed.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Wadhwa 723 Avenue as on Sep 2023.pdf16 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certficate.pdf10 Nov 2023
PAN CardFile: Harshvardhan Constructions.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certficate (1).pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Cerificate June qtr.pdf13 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 June qtr.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf25 Apr 2023
Proforma of Agreement for saleFile: AgreementForSale-723.pdf12 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviations-AgreementForSale-723.pdf12 Apr 2023
Copy of the legal title reportFile: Title_report_-_Rera_format_0001_compressed.pdf4 Apr 2023
Details of encumbrances concerned to FinanceFile: encumbrance - finance - 723.pdf4 Apr 2023
Details of encumbrances concerned to FinanceFile: encumbrance - legal.pdf4 Apr 2023
Details of encumbrances concerned to LegalFile: encumbrance - finance - 723.pdf4 Apr 2023
Details of encumbrances concerned to LegalFile: encumbrance - legal.pdf4 Apr 2023
CERSAI detailsFile: CERSAI REPORT - 723.pdf4 Apr 2023
Building plan approvalFile: Drawing-IOD-723.pdf21 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Drawing-IOD-723.pdf21 Mar 2023
Proforma of Allotment letterFile: Wadhwa 723 Avenue - Allotment Letter - 17March2023(1).pdf17 Mar 2023
Deviation Report with respect to Allotment letterFile: Wadhwa 723 Avenue - Deviation - Allotment letter(1).pdf17 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_-_3_Final_25_04_2023_signed.pdf16 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf14 Mar 2023
Declaration in FORM BFile: Form - B_Rera_Declaration_compressed.pdf13 Mar 2023
Building plan approvalFile: 2334131_IOD_signed.pdf11 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 2334131_IOD_signed.pdf11 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf23 Feb 2023
Declaration about Commencement CertificateFile: Declaration for Commencement Certificate.pdf21 Feb 2023
Layout approvalFile: No Layout declaration.pdf20 Feb 2023
Building plan approvalFile: 723 N A Order.pdf20 Feb 2023
PAN CardFile: HC_Pan_Card.pdf20 Feb 2023
Copy of Layout Approval (in case of layout)File: No Layout declaration.pdf20 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: 723 N A Order.pdf20 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: 2360558_FirstCC_signed(1)(1).pdf20 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration.pdf20 Feb 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SolitaireMalwadi Rd Hadapsar Pune38CompletedDec 2019Late, Nov 2020
ReshamBandra West Mumbai13CompletedDec 2019Late, Feb 2021
ADITYAVARDHANMUMBAI108CompletedOct 2012Late, May 2013

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Wadhwa 723 Avenue on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Marol lying and being at Hissa 10, Survey No. 496,700+ in Mumbai Suburban

2 kmWadhwa 723 AvenueCompleted 100Lapsed / revoked 54Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 212 registered projects within 2 km.

Builder: Harshvardhan Constructions

Harshvardhan Constructions has 1 registration on MahaRERA, including Wadhwa 723 Avenue. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Wadhwa 723 Avenue shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Wadhwa 723 Avenue is delayed beyond 31 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Wadhwa 723 Avenue?

The registered promoter entity is Harshvardhan Constructions, a partnership as per the filing. Its GSTIN 27AADFH6590D1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Wadhwa 723 Avenue?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Wadhwa 723 Avenue?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Wadhwa 723 Avenue?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Wadhwa 723 Avenue. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Wadhwa 723 Avenue to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.