Home / Browse projects / Mumbai Suburban, Maharashtra / TRILIVE MAROL TOWER B

Registered No litigation declared Residential / Group Housing project

TRILIVE MAROL TOWER B

By I-STAY HOUSING PRIVATE LIMITED

RG-MH-06499 · RERA P51800053082 · Last updated on MahaRERA portal: 30 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 12 months from the original
2 of 11Construction stages donefurthest along: Stilt Floor, 20%
0 of 294Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

TRILIVE MAROL TOWER B is a Residential / Group Housing project by I-STAY HOUSING PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800053082 on 16 Oct 2023. Possession is promised by 31 Dec 2028. The completion date has moved by 12 months from the original filing. 294 of the 294 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameTRILIVE MAROL TOWER B
  • TypeResidential / Group Housing
  • Location
    • Shivaji Nagar
    • Andheri East
    • Marol
    • Andheri
    • Mumbai Suburban
    • 400059
  • Pincode400059
  • RERA no.P51800053082
  • ReraGenie IDRG-MH-06499

Builder

  • NameI-STAY HOUSING PRIVATE LIMITED
  • Entity typeCompany
  • CINU68100MH2025PTC447656
  • GSTIN27AAICI1975P1ZT
  • PartnersRAJEEV DUBE, JITENDRA VORA
  • Other registrations6 more →

Key dates

this monthRegisteredOct 2023First promiseDec 2027Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on16 Oct 2023
  • Promised completion31 Dec 2028
  • Revised completionRevised to 31 Dec 2028 (originally 31 Dec 2027)
  • Buildings1 building record
  • Documents filed74 files

Current status

100%294 of 294 units booked
14.9%Work done, per cost certificate

Figures as on 30 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
I-STAY TOWER J STUDIONA23212940294

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 20%.

I-STAY TOWER J STUDIO: 20% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor20%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed38

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots38
Closed/Covered38

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,917 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Jul 2025

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI6248.96
Proposed, not sanctioned42 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHAKALI BRANCH, MUMBAI
Estimated costRs 32.30 cr
Cost incurredRs 4.82 cr
Work done14.94%
BuildingWingEstimatedIncurred
I-STAY TOWER J STUDIONARs 25.02 crRs 4.82 cr
-NARs 7.28 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMITIE DESIGNERS AND PLANNERS PVT
ArchitectMITIE DESIGNERS AND PLANNERS PVT LTD
ArchitectMITIE DESIGNERS AND PLANNERS
EngineerSUSHIL TRIPATHI
Chartered AccountantROHIT JHA
PartnerRole in project
I-STAY HOUSING PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA12122518653Dec 2027 → Dec 2028

Reason as filed by the promoterWe Would like to request you that the Project TRILIVE MAROL TOWER B which is located at CTS NO. 47, 48, 51/A, 52, 53/A, 1702 at Marol, Andheri, Mumbai Suburban, PIN 400093. having its Registration No P51800053082 was mentioned to be completed on 31/12/2027. "Due to the open space constraints at the construction site of the Trilive Marol Tower B which is in turn slowing down the vehicular movements carrying the construction materials resulting in delay in the construction progress of Trilive Marol Tower B, hence an extension owing to the aforesaid is hereby sought by the Promoter". The project

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Nov 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: form 2A (engineer certificate) Trilive Marol Tower B_FY 2025-26.pdf30 Sep 2026
Withdrawal Update Form 1File: form 1.pdf24 Aug 2026
Withdrawal Update Form 2File: form 2.pdf24 Aug 2026
Withdrawal Update Form 3File: CA CERTIFICATE_TRILIVE MAROL TOWER B_30062026.pdf24 Aug 2026
Withdrawal Update Form 1File: ARCHITTECT.pdf14 May 2026
Withdrawal Update Form 2File: FORM 2.pdf14 May 2026
Withdrawal Update Form 3File: CA.pdf14 May 2026
Withdrawal Update Form 1File: Architect Certificate TRILIVE MAROL TOWER B.pdf10 Feb 2026
Withdrawal Update Form 2File: ENGINEER FORM 2.pdf10 Feb 2026
Withdrawal Update Form 3File: CA CERTIFICATE TRILIVE MAROL TOWER B.pdf10 Feb 2026
Withdrawal Update Form 1File: form 1.pdf3 Dec 2025
Withdrawal Update Form 2File: form 2.pdf3 Dec 2025
Withdrawal Update Form 3File: form 3.pdf3 Dec 2025
Withdrawal Update Form 1File: Architect Certificate I Stay Tower J Studio dt 30 06 2025.pdf1 Dec 2025
Withdrawal Update Form 2File: ENGINEERu0027S CERTIFICATE_I-Stay Tower-J_30062025.pdf1 Dec 2025
Withdrawal Update Form 3File: CA CERTIFICATE_I-Stay Tower-J_30062025.pdf1 Dec 2025
Building plan approvalFile: AMENDED IOA.pdf3 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf17 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory disclosure _Tower J_31032025 (1).pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf8 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory disclosure _Tower J_31032025 (1).pdf8 Apr 2025
Layout approvalFile: J wing Plans_1-2.pdf1 Apr 2025
Layout approvalFile: J wing Plans_3-5.pdf1 Apr 2025
Layout approvalFile: J wing Plans_6-end.pdf1 Apr 2025
Building plan approvalFile: IOA.pdf1 Apr 2025
Copy of Layout Approval (in case of layout)File: J wing Plans_1-2.pdf1 Apr 2025
Copy of Layout Approval (in case of layout)File: J wing Plans_3-5.pdf1 Apr 2025
Copy of Layout Approval (in case of layout)File: J wing Plans_6-end.pdf1 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf1 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf19 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A -Tower J - 2023-24.pdf31 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 CA certificate -2023-24 Tower-J.pdf31 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate I-Stay Tower.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate I-Stay Tower.pdf23 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 (CA certificate)_FY 2023-24_Tower-J.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate I-Stay Tower-J (Studio) dt.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE_I-Stay Tower-J_31032024.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_I-Stay Tower-J_31032024.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate I-Stay Tower-J.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE_I-Stay Tower-J.pdf18 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_I-Stay Tower-J.pdf18 Jan 2024
Declaration about Commencement CertificateFile: CC COVERING LETTER I STAY Tower-J.pdf4 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate I Stay Tower J Studio.pdf26 Aug 2023
Building plan approvalFile: Amended IOA CC.pdf11 Aug 2023
Layout approvalFile: 1 BLOCK PLAN.pdf11 Aug 2023
Layout approvalFile: 2 J WING FLOOR PLAN.pdf11 Aug 2023
Layout approvalFile: 3 J WING SECTION.pdf11 Aug 2023
PAN CardFile: Company pan card.pdf11 Aug 2023
Copy of the legal title reportFile: RERA Title Report_Tower J_09-02-2023.PDF11 Aug 2023
Details of encumbrances concerned to FinanceFile: no encumbrance self declaration TOWER J.pdf11 Aug 2023
Details of encumbrances concerned to LegalFile: no encumbrance self declaration TOWER J.pdf11 Aug 2023
Copy of Layout Approval (in case of layout)File: 1 BLOCK PLAN.pdf11 Aug 2023
Copy of Layout Approval (in case of layout)File: 2 J WING FLOOR PLAN.pdf11 Aug 2023
Copy of Layout Approval (in case of layout)File: 3 J WING SECTION.pdf11 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Amended IOA CC.pdf11 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Shivaji Nagar Composite bldg Plinth CC reendosement.pdf11 Aug 2023
Declaration in FORM BFile: FORM B_Tower-J_Promoter.pdf11 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - J - 30062023.pdf11 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE_I-Stay Tower-J.pdf11 Aug 2023
CERSAI detailsFile: CERSAI DECLARATION TOWER J.pdf11 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A DOI.pdf11 Aug 2023
Proforma of Agreement for saleFile: Draft Agreement for Sale.pdf11 Aug 2023
Proforma of Allotment letterFile: DRAFT OF ALLOTMENT LETTER TOWER- J.pdf11 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank details letter rera_J Wing.pdf11 Aug 2023
Deviation Report with respect to Allotment letterFile: deviation report on allotment letter TOWER J.pdf11 Aug 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report on agreement for Sale.pdf11 Aug 2023

How this compares with Mumbai Suburban

100%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep TRILIVE MAROL TOWER B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Andheri East6,700+ in Mumbai Suburban

Builder: I-STAY HOUSING PRIVATE LIMITED

I-STAY HOUSING PRIVATE LIMITED has 7 registrations on MahaRERA, including I STAY TOWER K (STUDIO) and I-STAY TOWER -G. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if TRILIVE MAROL TOWER B is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of TRILIVE MAROL TOWER B?

The registered promoter entity is I-STAY HOUSING PRIVATE LIMITED, a company as per the filing. Its CIN U68100MH2025PTC447656 and GSTIN 27AAICI1975P1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in TRILIVE MAROL TOWER B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for TRILIVE MAROL TOWER B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at TRILIVE MAROL TOWER B?

The professionals named in the filing: Architect: MITIE DESIGNERS AND PLANNERS PVT; Architect: MITIE DESIGNERS AND PLANNERS PVT LTD; Architect: MITIE DESIGNERS AND PLANNERS; Engineer: SUSHIL TRIPATHI; Chartered Accountant: ROHIT JHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in TRILIVE MAROL TOWER B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About TRILIVE MAROL TOWER B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save TRILIVE MAROL TOWER B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.