Home / Browse projects / Pune, Maharashtra / VTPBelair E and F Building

Completed Litigation declared Residential / Group Housing project

VTPBelair E and F Building

By NNP BUILDCON PVT. LTD.

RG-MH-12837 · RERA P52100021327 · Last updated on MahaRERA portal: 29 Mar 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 10 complaints at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
10Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

VTPBelair E and F Building is a Residential / Group Housing project by NNP BUILDCON PVT. LTD. in Pune, Maharashtra, registered with MahaRERA as P52100021327 on 21 Jun 2019. The registration is recorded completed; possession was promised by 30 Jun 2025. 10 complaints are on record with the regulator.

At a glance

Project

  • NameVTPBelair E and F Building
  • TypeResidential / Group Housing
  • Location
    • Mhalunge Man Road
    • Mhalunge
    • Mahalunge
    • Mulshi
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100021327
  • ReraGenie IDRG-MH-12837

Builder

  • NameNNP BUILDCON PVT. LTD.
  • Entity typeCompany
  • CINU45209PN2021PTC199224
  • GSTIN27AAHCN4799F1ZY
  • DirectorsBhushan Vilas Palresha, Nilesh Vilas Palresha
  • Other registrations9 more →
  • Completed8 of 10
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredJun 2019PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Jun 2019
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed95 files

Current status

100.0%Work done, per cost certificate

Figures as on 29 Mar 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
E BUILDINGNA270000
F BUILDINGNA270000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

E BUILDING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F BUILDING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities19

As on 29 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Swimming PoolYes0%
Sky WalkYes0%
Multipurpose CourtYes0%
LoungeYes0%

Parking filed172

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots172
Closed/Covered120
Open Space52
BuildingClosed/CoveredOpen SpaceTotal
E BUILDING603090
F BUILDING602282

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,387 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Mhalunge Land Developers LLPMahalungePune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGIONAL DEVELOPMENT AUTHORITY PUNE
Permissible FSI33707.72
Proposed, not sanctioned17,437 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNariman Point,MUMBAI
Estimated costRs 111.04 cr
Cost incurredRs 111.04 cr
Work done100.0%
BuildingWingEstimatedIncurred
E BUILDINGNARs 46.35 crRs 46.35 cr
F BUILDINGNARs 46.35 crRs 46.35 cr
-NARs 18.33 crRs 18.33 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK ARCHITECTS
EngineerPREETI MAHADIK
Chartered AccountantGMKS CO.
Chartered AccountantSPAK & Co
PartnerRole in project
NNP BUILDCON PVT. LTD.-

Litigation declared1

CaseCourtStatus
1233/2014JOINT C.J.S.D AND ADDL C.J.M PUNEOngoing

Complaints filed with MahaRERA10

Case no.ComplainantRespondentFiled
CC005000000269682NNP BUILDCON PRIVATE LIMITEDVISHAL RAJENDRA SINGH02/11/2023
CC005000000269683NNP BUILDCON PRIVATE LIMITEDSHYAMLA RAJENDRA SINGH02/11/2023
CC005000000269684NNP BUILDCON PRIVATE LIMITEDSHYAMSUNDAR BAJAJ02/11/2023
CC12400870NNP BUILDCON PVT. LTD.AVINASH DATTATRAY JAGTAP23/11/2024
CC12400871NNP BUILDCON PVT. LTD.NIKHIL MAHENDRA SHIHORKAR23/11/2024
CC12400872NNP BUILDCON PVT. LTD.RAHUL ROY23/11/2024
CC12600606NNP BUILDCON PVT. LTD.SHYAMLA RAJENDRA SINGH02/02/2026
CC12600608NNP BUILDCON PVT. LTD.SHYAMSUNDAR BAJAJ02/02/2026
CC12600609NNP BUILDCON PVT. LTD.VISHAL RAJENDRA SINGH02/02/2026
CC12602531NNP BUILDCON PVT. LTD.Pallavi Nitin Tanksale30/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jun 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Aug 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Jul 2024

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: VTP BEL AIR.pdf29 Mar 2025
Disclosure of sold/ booked inventoryFile: BELAIRE EF 30092024.pdf14 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 BELAIR EF.pdf9 Oct 2024
Details of encumbrancesFile: ENCUMBRAMCE WRT FINANCE- BELAIR EF.pdf5 Aug 2024
Building plan approvalFile: BELAIR compressed.pdf27 Jul 2024
Building Plan Approval (IOD)File: BELAIR compressed.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BEALIR EF 06072024.pdf27 Jul 2024
Certificates of CA (Form 3)File: FORM 3 BELAIR EF.pdf27 Jul 2024
Architect’s Certificate on Completion of Project (Form 4)File: BELAIR EF COVERING LETTER FORM 4 COMPLETION MERGED.pdf27 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VTP BELAIR 300624.pdf18 Jul 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Belair Bldg E F Completion.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: INVENTORY BELAIR E F 31032024.pdf18 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A BELAIR A B C D E F 31032024.pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELAIR E F 31032024.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELAIR EF 31032024.pdf27 Apr 2024
Certificates of CA (Form 3)File: FORM 3 BELAIR E F 31032024.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELAIR E F 31032022.pdf21 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELAIR E F 30092022.pdf21 Mar 2024
Disclosure of sold/ booked inventoryFile: INVENTORY BELAIR EF 31122023.pdf10 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELAIR E F 31122023.pdf9 Feb 2024
Certificates of CA (Form 3)File: FORM 3 BELAIR E F 31122023.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELAIR EF 31122023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELAIR E F 30092023.pdf1 Jan 2024
Certificates of CA (Form 3)File: FORM 3 BEAIR E F 30092023.pdf1 Jan 2024
Disclosure of sold/ booked inventoryFile: INVENTORY BELAIR E F 30092023.pdf30 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELAIR E F 30092023.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 BELAIR E F 2022-23.pdf29 Sep 2023
Disclosure of sold/ booked inventoryFile: BELAIR E F 30092022.pdf30 Aug 2023
Disclosure of sold/ booked inventoryFile: BELAIR E F 31122022.pdf30 Aug 2023
Disclosure of sold/ booked inventoryFile: BELAIR E F 30062023.pdf30 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A BELAIR 31032023.pdf25 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELAIR E F 30062023_compressed.pdf25 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Belair EF.pdf25 Jul 2023
Certificates of CA (Form 3)File: FORM 3 BELAIR E F 30062023.pdf25 Jul 2023
Disclosure of sold/ booked inventoryFile: BELAIR E F_compressed.pdf12 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BELAIR E F_compressed.pdf27 May 2023
Certificates of CA (Form 3)File: FORM 3 BELAIR EF 31032023_compressed.pdf20 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BELAIR E F 31032023.pdf29 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Belair E F_compressed.pdf29 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Belair E F_compressed.pdf17 Apr 2023
Certificates of CA (Form 3)File: FORM 3 BELAIR EF 31122022_compressed (1).pdf15 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: VTP Belair Form 2A - Quality Assurance Certificate.pdf1 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 211030 -RERA Certificate - E F_compressed.pdf16 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Belair EF.pdf28 Feb 2023
Certificates of CA (Form 3)File: FORM 3 E F.pdf28 Feb 2023
Certificates of CA (Form 3)File: FORM 3 15072022 COMP.pdf27 Feb 2023
Certificates of CA (Form 3)File: FORM 3 19102022 COMP.pdf27 Feb 2023
Certificates of CA (Form 3)File: FORM 3 30072022 COMP.pdf27 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf27 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 07122022.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 13092022.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31122021.pdf23 Feb 2023
Certificates of CA (Form 3)File: FORM 3 24012022.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - BELAIR EF.pdf28 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VTP BELAIR 1327 FORM 1_compressed.pdf29 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5.pdf17 Oct 2022
CERSAI detailsFile: Belair.pdf19 Jul 2022
Other - LegalFile: 1.pdf16 Jul 2022
Other - LegalFile: 2.pdf16 Jul 2022
Other - LegalFile: 3.pdf16 Jul 2022
Other - LegalFile: 1.pdf16 Jul 2022
Other - LegalFile: 2.pdf16 Jul 2022
Other - LegalFile: 3.pdf16 Jul 2022
Other - LegalFile: 1.pdf16 Jul 2022
Other - LegalFile: 2.pdf16 Jul 2022
Other - LegalFile: 3.pdf16 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Belair EF.pdf13 Jul 2022
Disclosure of sold/ booked inventoryFile: Belair EF.pdf4 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Belair EF.pdf28 Apr 2022
CERSAI detailsFile: Belair EF.pdf14 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Belair EF.pdf13 Apr 2022
Disclosure of sold/ booked inventoryFile: Belair EF.pdf11 Apr 2022
Disclosure of sold/ booked inventoryFile: Belair EF.pdf13 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: March 21.pdf18 Nov 2021
Declaration about Commencement CertificateFile: Belair E F.pdf11 Nov 2021
Disclosure of sold/ booked inventoryFile: Belair E,F.pdf20 Oct 2021
Details of encumbrancesFile: Encumbrance Declaration NNP Buildcon.pdf30 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Belair E F.pdf11 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Belair (A, B, D, C, E, F) QA certificate 26-06-2020.pdf29 Aug 2020
Building plan approvalFile: BEL AIR LAYOUT1.pdf24 Aug 2019

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VTPBelair E and F Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mhalunge13,700+ in Pune

2 kmVTPBelair E and F BuildiCompleted 115Lapsed / revoked 117Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: NNP BUILDCON PVT. LTD.

NNP BUILDCON PVT. LTD has 10 registrations on MahaRERA, including VTP Leonara E Buidling and VTP Alpine. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VTPBelair E and F Building is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VTPBelair E and F Building?

The registered promoter entity is NNP BUILDCON PVT. LTD., a company as per the filing. Its CIN U45209PN2021PTC199224 and GSTIN 27AAHCN4799F1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VTPBelair E and F Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VTPBelair E and F Building?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VTPBelair E and F Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VTPBelair E and F Building?

The professionals named in the filing: Architect: VK ARCHITECTS; Engineer: PREETI MAHADIK; Chartered Accountant: GMKS CO.; Chartered Accountant: SPAK & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VTPBelair E and F Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VTPBelair E and F Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VTPBelair E and F Building to a free account