Home / Browse projects / Pune, Maharashtra / VTP VOLARE
VTP VOLARE
By Mexus Real Estate Developers LLP
RG-MH-18716 · RERA PR1260002400020 · Last updated on MahaRERA portal: 17 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 3 complaints at MahaRERA
- Rs 100.00 crore secured on the land, in favour of Godrej Finance Limited
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VTP VOLARE is a Residential / Group Housing project by Mexus Real Estate Developers LLP in Pune, Maharashtra, registered with MahaRERA as PR1260002400020 on 26 Sep 2024. Possession is promised by 31 Dec 2029. 477 of the 739 units on this registration are recorded sold or booked, and 1 of 30 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameVTP VOLARE
- TypeResidential / Group Housing
- Location
- Hinjewadi
- Hinjavadi (CT)
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.PR1260002400020
- ReraGenie IDRG-MH-18716
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Sep 2024
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings3 building records
- Documents filed85 files
Current status
Figures as on 17 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | NA | 33 | 29 | 227 | 0 | 227 |
| Tower 2 | NA | 33 | 29 | 285 | 0 | 285 |
| Tower 3 | NA | 33 | 29 | 227 | 0 | 227 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 30 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 95%.
Tower 19%
| Activity | Progress |
|---|---|
| Excavation | 87% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower 210%
| Activity | Progress |
|---|---|
| Excavation | 95% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Tower 310%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 2% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | 0% |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | 0% |
| Solid Waste Management And Disposal | No | 0% |
| Water conservation /Rain water harvesting | No | 0% |
| Energy managemcnt | No | 0% |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1412
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Stilt / Ground | Basement | Total |
|---|---|---|---|
| Tower 1 | 260 | 188 | 448 |
| Tower 2 | 345 | 170 | 515 |
| Tower 3 | 259 | 190 | 449 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower 1 | NA | Rs 87.37 cr | Rs 19.40 cr |
| Tower 2 | NA | Rs 85.79 cr | Rs 19.40 cr |
| Tower 3 | NA | Rs 84.81 cr | Rs 19.40 cr |
| - | NA | Rs 28.66 cr | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VK designs & projects Pvt. Ltd. |
| Architect | ANA CONSORTIUM PVT LTD |
| Engineer | Pravin Patil |
| Engineer | Vinay Abhyankar |
| Chartered Accountant | Amit Singhvi |
| Chartered Accountant | Pushpak Bogati |
| Chartered Accountant | Priyanka Chordiya & Associates |
| Partner | Role in project |
|---|---|
| MEXUS REAL ESTATE DEVELOPERS | - |
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12602285 | MEXUS REAL ESTATE DEVELOPERS | SURJYA NARAYAN MOHAPATRO | 18/04/2026 |
| CC12602286 | MEXUS REAL ESTATE DEVELOPERS | Mr AMOL VASANTRAO GAWANDE | 18/04/2026 |
| CC12602287 | MEXUS REAL ESTATE DEVELOPERS | WALLOSH SOARES FRANCISCO | 18/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportNot on the file
A lawyer's report on who owns the land and what is registered against it.
- Layout approvalNot on the file
The planning authority's approval of how the plots and buildings sit on the land.
- Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Sep 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Sep 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form No-2A VTP VOLARE.pdf | 17 Jun 2026 |
| Withdrawal Update Form 1File: FORM-1 VOLARE.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2 VOLARE.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 VOLARE.pdf | 15 Apr 2026 |
| Withdrawal Update Form 1File: FORM-1 VOLARE.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: RERA - FORM 2 VOLARE.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 VTP Volare 31122025.pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1 VOLARE.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: FORM-1 VOLARE.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: FORM-1 VOLARE.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 VTP Volare.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 VTP Volare.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 VTP Volare.pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: FORM-1 VOLARE.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1File: FORM-1 VOLARE.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1File: FORM-1 VOLARE.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 VTP Volare.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 VTP Volare.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 VTP Volare.pdf | 16 Oct 2025 |
| Form 5 (FY 2024-2025)File: FORM 5- VOLARE.pdf | 12 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf | 25 Jul 2025 |
| Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf | 25 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf | 25 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf | 21 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf | 21 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf | 21 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf | 21 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf | 21 Jul 2025 |
| Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf | 21 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 - VTP Volare 190924.pdf | 21 Jul 2025 |
| Withdrawal Update Form 2File: Form 2 - VTP Volare 190924.pdf | 21 Jul 2025 |
| Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf | 21 Jul 2025 |
| Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf | 21 Jul 2025 |
| Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf | 21 Jul 2025 |
| Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf | 21 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf | 21 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf | 21 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf | 21 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf | 21 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf | 21 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf | 21 Jul 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A VTP VOLARE.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: VOLARE 31032025.pdf | 22 May 2025 |
| Form 1File: Form 1 VTP Volare.pdf | 22 May 2025 |
| Form 2File: Form 2 Volare 31032025.pdf | 22 May 2025 |
| Form 3File: Form 3 VTP Volare 31032025_11zon.pdf | 22 May 2025 |
| Form 1File: FORM 1 VOLARE 31122024.pdf | 22 May 2025 |
| Form 2File: FORM 2 VOLARE 3112024.pdf | 22 May 2025 |
| Form 3File: form 3 VTP Volare 31-12-2024_11zon.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: VOLARE 31122025.pdf | 22 May 2025 |
| Form 1File: REVISED FORM 1 13092024.pdf | 22 May 2025 |
| Form 2File: VTP Volare form 2.pdf | 22 May 2025 |
| Form 3File: Form 3 VTP Volare 13092024.pdf | 22 May 2025 |
| Form 1File: REVISED FORM 1 13092024.pdf | 22 May 2025 |
| Form 2File: VTP Volare form 2.pdf | 22 May 2025 |
| Form 3File: Form 3 VTP Volare 13092024.pdf | 22 May 2025 |
| Building plan approvalFile: Commencement Certificate.pdf | 13 Sep 2024 |
| Building plan approvalFile: 1.pdf | 13 Sep 2024 |
| Building plan approvalFile: 2.pdf | 13 Sep 2024 |
| Building plan approvalFile: 3.pdf | 13 Sep 2024 |
| Building plan approvalFile: 4.pdf | 13 Sep 2024 |
| Building plan approvalFile: 5.pdf | 13 Sep 2024 |
| Building plan approvalFile: 6.pdf | 13 Sep 2024 |
| Building plan approvalFile: 7.pdf | 13 Sep 2024 |
| Building plan approvalFile: 8.pdf | 13 Sep 2024 |
| Building plan approvalFile: 9.pdf | 13 Sep 2024 |
| Building plan approvalFile: 10.pdf | 13 Sep 2024 |
| Building plan approvalFile: 11.pdf | 13 Sep 2024 |
| Building plan approvalFile: 12.pdf | 13 Sep 2024 |
| Building plan approvalFile: 14.pdf | 13 Sep 2024 |
| Building plan approvalFile: 15.pdf | 13 Sep 2024 |
| Building plan approvalFile: 16.pdf | 13 Sep 2024 |
| Building plan approvalFile: 17.pdf | 13 Sep 2024 |
| Building plan approvalFile: 18.pdf | 13 Sep 2024 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| VTP NEW HINJEWADI PHASE 1P52100077322 | Hinjewadi, Pune | 576 | Aug 2024 | Ongoing | Dec 2029 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VTP VOLARE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Hinjavadi (CT)13,700+ in Pune
Filed coordinates, straight-line distance. 96 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: Mexus Real Estate Developers LLP
MEXUS REAL ESTATE DEVELOPERS LLP has 4 registrations on MahaRERA, including MONARQUE BY VTP LUXE PHASE 1 and VTP VOLARE. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VTP VOLARE is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VTP VOLARE?
The registered promoter entity is Mexus Real Estate Developers LLP, a limited liability partnership as per the filing. Its LLPIN ABB-7153 and GSTIN 27ABUFM5206F1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VTP VOLARE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VTP VOLARE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VTP VOLARE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VTP VOLARE?
The professionals named in the filing: Architect: VK designs & projects Pvt. Ltd.; Architect: ANA CONSORTIUM PVT LTD; Engineer: Pravin Patil; Engineer: Vinay Abhyankar; Chartered Accountant: Amit Singhvi; Chartered Accountant: Pushpak Bogati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VTP VOLARE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback