VTP VOLARE

By Mexus Real Estate Developers LLP

RG-MH-18716 · RERA PR1260002400020 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Rs 100.00 crore secured on the land, in favour of Godrej Finance Limited

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
1 of 30Construction stages doneacross 3 buildings; furthest along: Excavation, 95%
262 of 739Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

VTP VOLARE is a Residential / Group Housing project by Mexus Real Estate Developers LLP in Pune, Maharashtra, registered with MahaRERA as PR1260002400020 on 26 Sep 2024. Possession is promised by 31 Dec 2029. 477 of the 739 units on this registration are recorded sold or booked, and 1 of 30 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameVTP VOLARE
  • TypeResidential / Group Housing
  • Location
    • Hinjewadi
    • Hinjavadi (CT)
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1260002400020
  • ReraGenie IDRG-MH-18716

Builder

  • NameMexus Real Estate Developers LLP
  • Entity typeLimited Liability Partnership
  • LLPINABB-7153
  • GSTIN27ABUFM5206F1Z2
  • Designated PartnersSumit Ramesh Diwane, Ayush Arun Jhanwar
  • Other registrations3 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2024PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Sep 2024
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings3 building records
  • Documents filed85 files

Current status

65%477 of 739 units booked
20.3%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 1NA33292270227
Tower 2NA33292850285
Tower 3NA33292270227

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 30 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 95%.

Tower 19%
ActivityProgress
Excavation87%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 210%
ActivityProgress
Excavation95%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 310%
ActivityProgress
Excavation100%
Basement (if any)2%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1412

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,412
Stilt / Ground864
Basement548
BuildingStilt / GroundBasementTotal
Tower 1260188448
Tower 2345170515
Tower 3259190449

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area10,633 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofGodrej Finance Limited
Secured amountRs 100.00 crore
Declared on2 Sep 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI69917.4
Proposed, not sanctioned69,917 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Office No. 1, Plot No. 55/56/57/58, Lalwani Plaza, A Wing, Sakore Nagar, Pune.411014, Maharashtra
Estimated costRs 286.64 cr
Cost incurredRs 58.20 cr
Work done20.3%
BuildingWingEstimatedIncurred
Tower 1NARs 87.37 crRs 19.40 cr
Tower 2NARs 85.79 crRs 19.40 cr
Tower 3NARs 84.81 crRs 19.40 cr
-NARs 28.66 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK designs & projects Pvt. Ltd.
ArchitectANA CONSORTIUM PVT LTD
EngineerPravin Patil
EngineerVinay Abhyankar
Chartered AccountantAmit Singhvi
Chartered AccountantPushpak Bogati
Chartered AccountantPriyanka Chordiya & Associates
PartnerRole in project
MEXUS REAL ESTATE DEVELOPERS-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC12602285MEXUS REAL ESTATE DEVELOPERSSURJYA NARAYAN MOHAPATRO18/04/2026
CC12602286MEXUS REAL ESTATE DEVELOPERSMr AMOL VASANTRAO GAWANDE18/04/2026
CC12602287MEXUS REAL ESTATE DEVELOPERSWALLOSH SOARES FRANCISCO18/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalNot on the file

    The planning authority's approval of how the plots and buildings sit on the land.

  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Sep 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Sep 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form No-2A VTP VOLARE.pdf17 Jun 2026
Withdrawal Update Form 1File: FORM-1 VOLARE.pdf15 Apr 2026
Withdrawal Update Form 2File: FORM 2 VOLARE.pdf15 Apr 2026
Withdrawal Update Form 3File: FORM 3 VOLARE.pdf15 Apr 2026
Withdrawal Update Form 1File: FORM-1 VOLARE.pdf16 Jan 2026
Withdrawal Update Form 2File: RERA - FORM 2 VOLARE.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3 VTP Volare 31122025.pdf16 Jan 2026
Withdrawal Update Form 1File: FORM-1 VOLARE.pdf17 Oct 2025
Withdrawal Update Form 1File: FORM-1 VOLARE.pdf17 Oct 2025
Withdrawal Update Form 1File: FORM-1 VOLARE.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 VTP Volare.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 VTP Volare.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 VTP Volare.pdf17 Oct 2025
Withdrawal Update Form 1File: FORM-1 VOLARE.pdf16 Oct 2025
Withdrawal Update Form 1File: FORM-1 VOLARE.pdf16 Oct 2025
Withdrawal Update Form 1File: FORM-1 VOLARE.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3 VTP Volare.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3 VTP Volare.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3 VTP Volare.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5- VOLARE.pdf12 Sep 2025
Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf25 Jul 2025
Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf25 Jul 2025
Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf25 Jul 2025
Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf21 Jul 2025
Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf21 Jul 2025
Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf21 Jul 2025
Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf21 Jul 2025
Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf21 Jul 2025
Withdrawal Update Form 1File: Form 1 Volare 30062025.pdf21 Jul 2025
Withdrawal Update Form 2File: Form 2 - VTP Volare 190924.pdf21 Jul 2025
Withdrawal Update Form 2File: Form 2 - VTP Volare 190924.pdf21 Jul 2025
Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf21 Jul 2025
Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf21 Jul 2025
Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf21 Jul 2025
Withdrawal Update Form 2File: FORM-2 VTP VOLARE june 2025.pdf21 Jul 2025
Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf21 Jul 2025
Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf21 Jul 2025
Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf21 Jul 2025
Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf21 Jul 2025
Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf21 Jul 2025
Withdrawal Update Form 3File: Form 3 VTP Volare 30062025 JUNE.pdf21 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A VTP VOLARE.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: VOLARE 31032025.pdf22 May 2025
Form 1File: Form 1 VTP Volare.pdf22 May 2025
Form 2File: Form 2 Volare 31032025.pdf22 May 2025
Form 3File: Form 3 VTP Volare 31032025_11zon.pdf22 May 2025
Form 1File: FORM 1 VOLARE 31122024.pdf22 May 2025
Form 2File: FORM 2 VOLARE 3112024.pdf22 May 2025
Form 3File: form 3 VTP Volare 31-12-2024_11zon.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: VOLARE 31122025.pdf22 May 2025
Form 1File: REVISED FORM 1 13092024.pdf22 May 2025
Form 2File: VTP Volare form 2.pdf22 May 2025
Form 3File: Form 3 VTP Volare 13092024.pdf22 May 2025
Form 1File: REVISED FORM 1 13092024.pdf22 May 2025
Form 2File: VTP Volare form 2.pdf22 May 2025
Form 3File: Form 3 VTP Volare 13092024.pdf22 May 2025
Building plan approvalFile: Commencement Certificate.pdf13 Sep 2024
Building plan approvalFile: 1.pdf13 Sep 2024
Building plan approvalFile: 2.pdf13 Sep 2024
Building plan approvalFile: 3.pdf13 Sep 2024
Building plan approvalFile: 4.pdf13 Sep 2024
Building plan approvalFile: 5.pdf13 Sep 2024
Building plan approvalFile: 6.pdf13 Sep 2024
Building plan approvalFile: 7.pdf13 Sep 2024
Building plan approvalFile: 8.pdf13 Sep 2024
Building plan approvalFile: 9.pdf13 Sep 2024
Building plan approvalFile: 10.pdf13 Sep 2024
Building plan approvalFile: 11.pdf13 Sep 2024
Building plan approvalFile: 12.pdf13 Sep 2024
Building plan approvalFile: 14.pdf13 Sep 2024
Building plan approvalFile: 15.pdf13 Sep 2024
Building plan approvalFile: 16.pdf13 Sep 2024
Building plan approvalFile: 17.pdf13 Sep 2024
Building plan approvalFile: 18.pdf13 Sep 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
VTP NEW HINJEWADI PHASE 1P52100077322Hinjewadi, Pune576Aug 2024OngoingDec 2029Not due yet

How this compares with Pune

65%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VTP VOLARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hinjavadi (CT)13,700+ in Pune

2 kmVTP VOLARECompleted 37Lapsed / revoked 15Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 96 registered projects within 2 km.

Builder: Mexus Real Estate Developers LLP

MEXUS REAL ESTATE DEVELOPERS LLP has 4 registrations on MahaRERA, including MONARQUE BY VTP LUXE PHASE 1 and VTP VOLARE. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VTP VOLARE is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VTP VOLARE?

The registered promoter entity is Mexus Real Estate Developers LLP, a limited liability partnership as per the filing. Its LLPIN ABB-7153 and GSTIN 27ABUFM5206F1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VTP VOLARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VTP VOLARE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VTP VOLARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VTP VOLARE?

The professionals named in the filing: Architect: VK designs & projects Pvt. Ltd.; Architect: ANA CONSORTIUM PVT LTD; Engineer: Pravin Patil; Engineer: Vinay Abhyankar; Chartered Accountant: Amit Singhvi; Chartered Accountant: Pushpak Bogati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VTP VOLARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VTP VOLARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VTP VOLARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.