Home / Browse projects / Pune, Maharashtra / VTP Leonara H building
VTP Leonara H building
RG-MH-21075 · RERA P52100009529 · Last updated on MahaRERA portal: 4 Jul 2025
Source: official MahaRERA filing
Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
At a glance
Project
- NameVTP Leonara H building
- TypeResidential / Group Housing
- Location
- Mhalunge Man road
- Mhalunge
- Mahalunge
- Mulshi
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100009529
- ReraGenie IDRG-MH-21075
Builder
- NameNNP BUILDCON PVT. LTD
- Entity typeCompany
- CINU45209PN2021PTC100224
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Aug 2017
- Promised completion15 May 2025
- Revised completionRevised to 15 May 2025 (originally 1 Dec 2022)
- Buildings1 building record
- Documents filed126 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Society 6 Tower 17 H Building | NA | 24 | 22 | 0 | 0 | 0 |
These details are filed with MahaRERA and packaged in the Rs 499 buyer report. Create a free account to preview, or read the full report for the verdict.
Builder: NNP BUILDCON PVT. LTD
NNP BUILDCON PVT. LTD has 10 registrations in this build, including VTP Leonara E Buidling and VTP Alpine. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VTP Leonara H building is delayed beyond 15 May 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VTP Leonara H building?
The registered promoter entity is NNP BUILDCON PVT. LTD, a company as per the filing. Its CIN U45209PN2021PTC100224 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents, all downloadable free from this page with a login.
Is my payment protected in VTP Leonara H building?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at VTP Leonara H building?
The professionals named in the filing: Architect: Vk a Architecture; Architect: VK:a; Engineer: STRUDCOM CONSULTANTS PRIVATE LIMITED; Engineer: SIDDQUE MODAK; Engineer: Design Werkz Engineering Pvt LTD; Chartered Accountant: GMKS & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VTP Leonara H building?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Spotted something wrong? Report a data issue