Home / Browse projects / Pune, Maharashtra / VTP Leonara A and D Building

Completed No litigation declared Residential / Group Housing project

VTP Leonara A and D Building

By NNP BUILDCON PRIVATE LIMITED

RG-MH-04725 · RERA P52100020112 · Last updated on MahaRERA portal: 29 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

VTP Leonara A and D Building is a Residential / Group Housing project by NNP BUILDCON PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100020112 on 28 Mar 2019. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NameVTP Leonara A and D Building
  • TypeResidential / Group Housing
  • Location
    • Mhalunge Man road
    • Mhalunge
    • Mahalunge
    • Mulshi
    • Pune
    • 411045
  • Pincode411045
  • RERA no.P52100020112
  • ReraGenie IDRG-MH-04725

Builder

  • NameNNP BUILDCON PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsBhushan Vilas Palresha, Nilesh Vilas Palresha
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredMar 2019PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Mar 2019
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings2 building records
  • Documents filed102 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA260000
D buildingNA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

A Building100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
D building100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed42

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots42
Closed/Covered2
Open Space40
BuildingClosed/CoveredOpen SpaceTotal
A Building12021
D building12021

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,382 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Mhalunge Land Developers LLPBanerPune
MAHALUNGE LAND DEVELOPERS LLPBanerPune

Approvals and building plan

Permissible FSI28791.9
Proposed, not sanctioned27,286 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNariman Point

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK ARCHITECTS
PartnerRole in project
NNP BUILDCON PRIVATE LIMITED-

Litigation declared1

CaseCourtStatus
1233/2014/2014CJSDNOT RELATED TO PROJECT LAND STATUS PENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Mar 2024

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: VTP LEONARA.pdf29 Mar 2025
Details of encumbrancesFile: ENCUMBRANCE- LEONARA AD.pdf20 Aug 2024
Disclosure of sold/ booked inventoryFile: VTP Leonara A D 30062024.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A LEONARA A B C D E F G 31032024.pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 LEONARA A D 31032024.pdf6 May 2024
Disclosure of sold/ booked inventoryFile: INVENTORY LEONARA A D 31032024.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 LEONARA A D 31032024.pdf27 Apr 2024
Certificates of CA (Form 3)File: FORM 3 LEONARA A D 31032024.pdf27 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 LEONARA A D 30032024.pdf17 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: Leonara AD - COVERING LETTER.pdf17 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Leonara C D - Completion Certificatte 04032024.pdf30 Mar 2024
Disclosure of sold/ booked inventoryFile: INVENTORY LEONARA AD 31122023.pdf10 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 LEONARA A D 31122023.pdf9 Feb 2024
Certificates of CA (Form 3)File: FORM 3 LEONARA A D 31122023.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 LEONARA AD 31122023.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 LEONARA A D 30092023.pdf1 Jan 2024
Certificates of CA (Form 3)File: FORM 3 LEONARA A D 30092023.pdf1 Jan 2024
Disclosure of sold/ booked inventoryFile: INVENTORY LEONARA A D 30092023.pdf11 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 LEONARA A D 30092023.pdf30 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A LEONARA 31032023.pdf30 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 LEONARA A D 2022-23.pdf29 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC - Leonara A E F.pdf29 Sep 2023
Disclosure of sold/ booked inventoryFile: LEONARA A D 30092022.pdf30 Aug 2023
Disclosure of sold/ booked inventoryFile: LEONARA A D 31122022.pdf30 Aug 2023
Disclosure of sold/ booked inventoryFile: LEONARA A D 30062023.pdf30 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: VTP Leonara.pdf25 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 LEONARA A D 30062023_compressed.pdf25 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Leonara A D_compressed.pdf25 Jul 2023
Certificates of CA (Form 3)File: FORM 3 LEONARA A D 30062023_compressed.pdf25 Jul 2023
Disclosure of sold/ booked inventoryFile: LEONARA A D.pdf12 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 LEONARA AD.pdf26 May 2023
Certificates of CA (Form 3)File: FORM 3 LEONARA AD 31032023_compressed.pdf20 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Leonara A D_compressed.pdf29 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 LEONARA AD 31032023.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Leonara A D_compressed.pdf17 Apr 2023
Certificates of CA (Form 3)File: FORM 3 LEONARA AD 31122022_compressed.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 211030 - RERA Certificate - A D.pdf16 Mar 2023
Certificates of CA (Form 3)File: FORM 3 31032019.pdf11 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31032020.pdf28 Feb 2023
Certificates of CA (Form 3)File: FORM 3 31032019.pdf28 Feb 2023
Certificates of CA (Form 3)File: FORM 3 31032020.pdf28 Feb 2023
Certificates of CA (Form 3)File: FORM 3 15072022 COMP.pdf27 Feb 2023
Certificates of CA (Form 3)File: FORM 3 19102022 COMP.pdf27 Feb 2023
Certificates of CA (Form 3)File: FORM 3 30072022 COMP.pdf27 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 07122022.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 13092022.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 21072022.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 31122021.pdf23 Feb 2023
Certificates of CA (Form 3)File: FORM 3 24012022.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - LEONARA AD.pdf28 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VTP LEONARA 0112 FORM 1_compressed.pdf29 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 (3).pdf17 Oct 2022
CERSAI detailsFile: Leonara AD.pdf19 Jul 2022
OtherFile: 1.pdf16 Jul 2022
OtherFile: 2.pdf16 Jul 2022
OtherFile: 3.pdf16 Jul 2022
OtherFile: 1.pdf16 Jul 2022
OtherFile: 2.pdf16 Jul 2022
OtherFile: 3.pdf16 Jul 2022
OtherFile: 4.pdf16 Jul 2022
OtherFile: 1.pdf16 Jul 2022
OtherFile: 2.pdf16 Jul 2022
OtherFile: 3.pdf16 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Leonara Ad.pdf13 Jul 2022
Disclosure of sold/ booked inventoryFile: Leonara AD_compressed.pdf4 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Leonara AD.pdf28 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Leonara AD.pdf13 Apr 2022
CERSAI detailsFile: Leonara AD.pdf13 Apr 2022
Disclosure of sold/ booked inventoryFile: Leonra AD.pdf11 Apr 2022
Disclosure of sold/ booked inventoryFile: Leonara AD.pdf14 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Leo A D.pdf31 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: March 19.pdf22 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: March 21.pdf22 Nov 2021
Declaration about Commencement CertificateFile: Leonara A D.pdf11 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Leonara QA no 3.pdf8 Nov 2021
Disclosure of sold/ booked inventoryFile: Leonara A, D.pdf20 Oct 2021
OtherFile: Declaration NNP Buildcon Leonara A D C F.pdf9 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Leonara A D.pdf11 May 2021
Details of encumbrancesFile: NNP_-_Encumbrance_Certificate.pdf3 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Leonara (A,D, B, C, F, E, G, H) QA certificate 26-06-2020.pdf29 Aug 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VTP Leonara A and D Building on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mhalunge13,700+ in Pune

Builder: NNP BUILDCON PRIVATE LIMITED

NNP BUILDCON PRIVATE LIMITED has 2 registrations on MahaRERA, including VTP Leonara building C and F and VTP Leonara A and D Building. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VTP Leonara A and D Building is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VTP Leonara A and D Building?

The registered promoter entity is NNP BUILDCON PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VTP Leonara A and D Building?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VTP Leonara A and D Building?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VTP Leonara A and D Building?

The professionals named in the filing: Architect: VK ARCHITECTS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VTP Leonara A and D Building?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VTP Leonara A and D Building. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VTP Leonara A and D Building to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.