Vtp Cygnus- Nation R1-Tower 9

By Ashdan Developers Private Limited

RG-MH-20267 · RERA P52100007401 · Last updated on MahaRERA portal: 30 Jun 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 15 months past the filed date
  • Litigation declared, 3 cases
  • 23 complaints at MahaRERA
  • Rs 489.00 crore secured on the land, in favour of KOTAK REALTY FUND

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2025Possession promised15 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 96%
3 of 261Units unsoldnot recorded sold or booked
23Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

Vtp Cygnus- Nation R1-Tower 9 is a Residential / Group Housing project by Ashdan Developers Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100007401 on 17 Aug 2017. Possession was promised by 18 Jul 2025 and is now 15 months past that date. 258 of the 261 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 23 complaints are on record with the regulator.

At a glance

Project

  • NameVtp Cygnus- Nation R1-Tower 9
  • TypeResidential / Group Housing
  • Location
    • Gat No 124
    • Manjri
    • MANJARI KH
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100007401
  • ReraGenie IDRG-MH-20267

Builder

  • NameAshdan Developers Private Limited
  • Entity typeCompany
  • DirectorsMeena Manohar Karne, Bhushan Vilaskumar Palresha, Nilesh Vilas Palresha, Anil Shantilal Kankariya
  • Other registrations15 more →
  • Completed4 of 16
  • No longer live1 lapsed, de-registered or revoked

Key dates

15 months past promisethis monthRegisteredAug 2017PromisedJul 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Aug 2017
  • Promised completion18 Jul 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed93 files

Current status

99%258 of 261 units booked

Figures as on 30 Jun 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kul Nation R1 Tower-9NA24222610261

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 96%.

Kul Nation R1 Tower-9: 71% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure96%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises76%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.65%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%

Progress on shared amenities16

As on 30 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes55%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes70%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Swimming PoolNoNot applicable

Parking filed102

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots102
Closed/Covered102

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area688 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofKOTAK REALTY FUND
Secured amountRs 489.00 crore
CERSAI search filedYes
Declared on1 Oct 2024
LandownerVillageDistrict
Arhum Erectors LLPVIMANNAGARPune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGION DEVELOPMENT AUTHORITY
Permissible FSI10946.08
Proposed, not sanctioned10,946 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMUMBAI

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK A ARCHITECTURE
EngineerPRADYUMNA SURYAWANSHI
EngineerJW Consultatns LLP Formerly Y S Sane Associates
EngineerRAVI VIVEKANANDAN
Chartered AccountantPriyanka Chordiya & Associates
Chartered AccountantPUSHPAK BOGATI
PartnerRole in project
Ashdan Developers Private Limited-

Litigation declared3

CaseCourtStatus
1170/2014/2014CJSDOngoing
264/2015/2015CJSDOngoing
401943/2015/2015CJM PUNEOngoing

Complaints filed with MahaRERA23

Case no.ComplainantRespondentFiled
CC005000000000096Prabhjot Singh Bhatia along with other KUL Nation Phase 1 Flat BuyersKUL Developers Private Limited10/10/2017
CC005000000053899Prabhjot Singh BhatiaKul Developers Private Limited Through Its Authorised Signatory Indarmal S Gandhi19/01/2020
CC005000000022142Mrs. Archana Mohit MathurAshdan Developers Private Limited16/10/2018
CC005000000023096Jayashri S. GiteAshdan Developers Private Limited04/06/2019
CC005000000023106Deepa Sadanand GhagAshdan Developers Private Limited08/06/2019
CC005000000053897Priti Nilesh PatilKul Developers Private Limited Through Its Authorised Signatory Indarmal S Gandhi19/01/2020
CC005000000053898Umesh Subhash KolapkarKul Developers Private Limited Through Its Authorised Signatory Indarmal S Gandhi20/01/2020
CC005000000053895Archana MathurAshdan Developers Pvt. Ltd.07/01/2020
CC005000000054054Shravan Nandkishor SikchiKul Developers Private Limited Through Its Partner Indarmal Gandhi23/02/2020
CC005000000054130Anuj DatreAshdan Developers Private Limited09/03/2020
CC005000000064906Rahul BankarAshdan Developers Private Limited07/12/2020
CC005000000064942Dattatray KandAshdan Developers Pvt Ltd17/12/2020
CC005000000075066Pratiksha JhaAshdan Developers Private Limited11/01/2021
CC005000000075071Franklin MendoncaAshdan Developers Pvt Ltd (Erstwhile Kul Developers Pvt Ltd) thro. its Director Vilas Popatrao Tambe28/01/2021
CC005000000157283sharvan karnaniVTP REALTY29/06/2022
CC005000000290019Ashdan Developers Pvt. Ltd.MANJEET SHRINIVAS PILLAY14/01/2024
CC005000000290020Ashdan Developers Pvt. Ltd.SHANTANU SHRINAND KAMBLE14/01/2024
CC005000000310489Ashdan Developers Pvt. Ltd.SANDIP SOPAN BAGATE28/02/2024
CC005000000441106Ashdan Developers Pvt. Ltd.SANDIP SOPAN BAGATE13/06/2024
CC12501457Rahul Surendra BhandariAshdan Developers Private Limited30/04/2025
CC12601054Ashdan Developers Private LimitedSANDHYA SHRIMANKAR BOSAKI26/02/2026
CC12601055Ashdan Developers Private LimitedBHARATI LALIT KHOSLA26/02/2026
CC12600598Ashdan Developers Private LimitedSANDIP SOPAN BAGATE02/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: FORM 2A CYGNUS T9.pdf30 Jun 2025
Form 1File: Form 1 Cygnus T9.pdf22 May 2025
Form 2File: Form 2 Cygnus T9.pdf22 May 2025
Form 3File: cygnus T9.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: CYGNUS T9 31032025.pdf22 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Cygnus T9.pdf21 Apr 2025
Certificates of CA (Form 3)File: cygnus T9.pdf19 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Cygnus T9.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: CYGNUS T9 31032025.pdf8 Apr 2025
Certificates of CA (Form 3)File: FORM 3 CYGNUS T9 31132024.pdf20 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CYGNUS T9 31122024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: CYGNUS T9 31122024.pdf14 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CYGNUS T9 31122024.pdf10 Jan 2025
Details of encumbrancesFile: T9.pdf20 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Vtp Cygnus Nation R1 T9 300624.pdf9 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CYGNUS T9 17102024.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 CYGNUS T9_2023-2024.pdf9 Dec 2024
Certificates of CA (Form 3)File: FORM 3 CYGNUS T9 30092024.pdf22 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CYGNUS T9 30092024.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: CYGNUS T9 30092024.pdf19 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CYGNUS T9 08072024.pdf18 Jul 2024
Certificates of CA (Form 3)File: FORM 3 CYGNUS T9 16072024.pdf18 Jul 2024
Disclosure of sold/ booked inventoryFile: CYGNUS 9 30062024.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A CYGNUS T9 31032024.pdf16 May 2024
Disclosure of sold/ booked inventoryFile: INVENTORY CYGNUS T9 31032024.pdf6 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CYGNUS T9 31032024.pdf26 Apr 2024
Certificates of CA (Form 3)File: FORM 3 CYGNUS T9 31032024.pdf26 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CYGNUS T9 31032024.pdf4 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 CYGNUS T9 2019-20.pdf1 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 CYGNUS T9 2020-21.pdf1 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 CYGNUS T9 2021-22.pdf1 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 CYGNUS T9 2022-23.pdf1 Apr 2024
Certificates of CA (Form 3)File: FORM 3 CYGNUS T9 31032022.pdf29 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CYGNUS T9 31032022.pdf28 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CYGNUS T9 30092022.pdf27 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CYGNUS T9 30062022.pdf21 Mar 2024
Certificates of CA (Form 3)File: FORM 3 CYGNUS T9 30062022.pdf21 Mar 2024
Disclosure of sold/ booked inventoryFile: INVENTORY CYGNUS T9 31122023.pdf16 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CYGNUS T9 31122023.pdf25 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CYGNUS T9 31122023.pdf22 Jan 2024
Certificates of CA (Form 3)File: FORM 3 T9 31122023.pdf22 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CYGNUS T9 30092023.pdf28 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CYGNUS T9 30092023.pdf25 Oct 2023
Disclosure of sold/ booked inventoryFile: INVENTORY CYGNUS T9 30092023.pdf19 Oct 2023
Certificates of CA (Form 3)File: FORM 3 CYGNUS T9 30092023.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: CYGNUS T9 30092022.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: CYGNUS T9 31122022.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: CYGNUS T9 31032023.pdf6 Sep 2023
Disclosure of sold/ booked inventoryFile: CYGNUS T9 30062023.pdf6 Sep 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 T9 30062023.pdf4 Aug 2023
Details of encumbrancesFile: FE T9 010823.pdf1 Aug 2023
Certificates of CA (Form 3)File: FORM 3 T9 30062023.pdf1 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 T9 30062023.pdf31 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 T9 31032023.pdf26 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A T9 31032022.pdf26 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A T9 31032023.pdf26 Jul 2023
Certificates of CA (Form 3)File: FORM 3 T9 31032023.pdf5 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 T9 31032023.pdf29 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 211019 - RERA Certificate - T9 19102021_compressed.pdf16 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - T9.pdf28 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Beaumonde T9.pdf28 Jan 2023
Certificates of CA (Form 3)File: Tower 9_compressed.pdf28 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VTP BEAUMONDE TOWER 9 FORM -2.pdf29 Oct 2022
Certificates of CA (Form 3)File: CYGNUS R1 TOWER 9 FORM -3.pdf29 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 9.pdf25 Jul 2022
Disclosure of sold/ booked inventoryFile: Tower 9.pdf4 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T9.pdf23 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 9.pdf9 Apr 2022
Disclosure of sold/ booked inventoryFile: Tower 9.pdf9 Apr 2022
Disclosure of sold/ booked inventoryFile: T999.pdf7 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: T-09-JAN 21 TO MARCH 21.pdf18 Nov 2021
Declaration about Commencement CertificateFile: T9.pdf16 Nov 2021
Disclosure of sold/ booked inventoryFile: T9.pdf12 Nov 2021
Details of encumbrancesFile: Ashdan Encumbrance_Signed.pdf21 Oct 2021
Copy of the legal title reportFile: merged document upload-compressed.pdf24 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Kulnation_T9.pdf6 Dec 2019
Certificates of CA (Form 5)File: R1 Tower -9_compressed.pdf30 Sep 2019
Certificates of CA (Form 5)File: ASHDHAN Dev Pvt Ltd_Kul Nation R1 Tower9.pdf30 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: Nation Sanction Order-T 7 to T10.pdf17 Feb 2018
Declaration in FORM BFile: Kul Nation T9.pdf16 Feb 2018

How this compares with Pune

99%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vtp Cygnus- Nation R1-Tower 9 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Manjri13,700+ in Pune

2 kmVtp Cygnus- Nation R1-ToCompleted 7Lapsed / revoked 3Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: Ashdan Developers Private Limited

Ashdan Developers Private Limited has 16 registrations on MahaRERA, including Vtp Cygnus- Nation R1-Tower 9 and VTP Beaumonde-Nation R2 T1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 9 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Vtp Cygnus- Nation R1-Tower 9 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Vtp Cygnus- Nation R1-Tower 9 is delayed beyond 18 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vtp Cygnus- Nation R1-Tower 9?

The registered promoter entity is Ashdan Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vtp Cygnus- Nation R1-Tower 9?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Vtp Cygnus- Nation R1-Tower 9?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Vtp Cygnus- Nation R1-Tower 9?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vtp Cygnus- Nation R1-Tower 9?

The professionals named in the filing: Architect: VK A ARCHITECTURE; Engineer: PRADYUMNA SURYAWANSHI; Engineer: JW Consultatns LLP Formerly Y S Sane Associates; Engineer: RAVI VIVEKANANDAN; Chartered Accountant: Priyanka Chordiya & Associates; Chartered Accountant: PUSHPAK BOGATI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vtp Cygnus- Nation R1-Tower 9?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vtp Cygnus- Nation R1-Tower 9. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vtp Cygnus- Nation R1-Tower 9 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.