Home / Browse projects / Pune, Maharashtra / Vtp Cygnus- Nation R1-Tower 8

Completed Litigation declared Residential / Group Housing project

Vtp Cygnus- Nation R1-Tower 8

By Ashdan Developers Private Limited

RG-MH-20404 · RERA P52100007722 · Last updated on MahaRERA portal: 20 Dec 2024

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case
  • 20 complaints at MahaRERA
  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
20Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Vtp Cygnus- Nation R1-Tower 8 is a Residential / Group Housing project by Ashdan Developers Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100007722 on 17 Aug 2017. The registration is recorded completed; possession was promised by 14 Jul 2024. The completion date has moved by 12 months from the original filing. 20 complaints are on record with the regulator.

At a glance

Project

  • NameVtp Cygnus- Nation R1-Tower 8
  • TypeResidential / Group Housing
  • Location
    • Gat No 124
    • Manjri
    • MANJARI KH
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100007722
  • ReraGenie IDRG-MH-20404

Builder

  • NameAshdan Developers Private Limited
  • Entity typeCompany
  • CINU70102PN2006PTC129196
  • DirectorsMeena Manohar Karne, Bhushan Vilaksumar Palresha, Nilesh Vilaskumar Palresha, Anil Shantilal Kankariya
  • Other registrations15 more →
  • Completed4 of 16
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseJul 2023Revised toJul 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion14 Jul 2024
  • Revised completionRevised to 14 Jul 2024 (originally 15 Jul 2023)
  • Buildings1 building record
  • Documents filed79 files

Current status

62.2%Work done, per cost certificate

Figures as on 20 Dec 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kul Nation R1 Tower 8NA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Kul Nation R1 Tower 8: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 20 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes80%
Street LightingYes90%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%
Swimming PoolNoNot applicable

Parking filed88

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots88
Closed/Covered88

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area688 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Arhum Erectors LLPVIMANNAGARPune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGIONAL DEVELOPMENT AUTHORITY
Permissible FSI10946.08
Proposed, not sanctioned10,946 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMUMBAI
Estimated costRs 58.99 cr
Cost incurredRs 36.67 cr
Work done62.17%
BuildingWingEstimatedIncurred
Kul Nation R1 Tower 8NARs 43.05 crRs 30.24 cr
-NARs 15.94 crRs 6.43 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK A ARCHITECTURE
EngineerJ W Consultants LLP
EngineerRAVI VIVEKANANDAN
Chartered AccountantPriyanka Chordiya & Associates
Chartered AccountantSAC & CO LLP
PartnerRole in project
Ashdan Developers Private Limited-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100016915Jul 2023 → Jan 2024

Reason as filed by the promoterThe project registration is valid up to 15.07.2023 and we are applying for its extension by 6 months. We state that, the world was hit by the COVID - 19 pandemic. The Real Estate Industry was badly affected even after the post covid period as the material supplies and labour availability took long time, hence the operations were severally affected for long time, hence the construction activities were affected and delayed the completion of project. In view of above, we humbly request you to grant us extension for the project till 14.01.2024.

EXT52100018880Jul 2023 → Jul 2024

Reason as filed by the promoterProject is completed and we have applied for the Occupancy Certificate on 12.01.2024, however after receipt of occupancy certificate, time is required to upload & approve Form 4, hence we have applied for extension till 14.07.2024

Litigation declared1

CaseCourtStatus
1170/2014/2014CJSDLITIGATION ON OTHER SECTOR OF TOWNSHIP LAND NOT RELATED TO VTP CYGNUS TOWER EIGHT

Complaints filed with MahaRERA20

Case no.ComplainantRespondentFiled
CC005000000054165Prem PalAshdan Developers Private Limited20/03/2020
CC005000000023107Mohit AgarwalAshdan Developers private limited08/06/2019
CC005000000218312Avinash Pandurang KarcheAshdan Developers Private Ltd (Erstwhile Kul Developers Pvt. Ltd.)Through its Director Vilas P Tambe16/02/2023
CC005000000043718Dineshkumar Arun GhiyyaAshdan Developers Pvt Ltd30/11/2019
CC005000000054097Trupti SinhaKul Developers Private Limited Through its Authorised Signatory Shri. Indarmal S. Gandhi09/03/2020
CC005000000054022Mangesh RalegankarKul Developers Private Limited through its Authorised Signatory Shri. Indarmal Gandhi16/02/2020
CC005000000064488Pabitra K PandaAshdan Developers Pvt Ltd (erstwhile Kul Developers Pvt Ltd) thro its Director Meena M Karne21/08/2020
CC005000000085471Namish SolankiAshdan Developers Private Limited12/06/2021
CC005000000177978Asiya Rais PathanAshdan Developers Pvt Ltd (Formerly known as Kul Developers Pvt Ltd) Thro its Director Meena Karne23/12/2022
CC005000000259125RAKESH MALLIKARJUN BHANDARIashdan developers07/07/2023
CC005000000290018Ashdan Developers Pvt. Ltd.FARIDA ANWAR QURESHI14/01/2024
CC005000000290026Ashdan Developers Pvt. Ltd.ELVEENA MANISH DONGARE14/01/2024
CC005000000370956Ashdan Developers Pvt. Ltd.Dineshkumar Ghiyya25/05/2024
CC005000000370984Ashdan Developers Pvt. Ltd.Amol Arya25/05/2024
CC005000000370986Ashdan Developers Pvt. Ltd.Amrita Nanasaheb Patil25/05/2024
CC12500739Himanshu Sekhar BeheraAshdan Developers Private Limited04/03/2025
CC12602255Ashdan Developers Private LimitedPrashant Tukaram Yewale17/04/2026
CC12602256Ashdan Developers Private LimitedShashikant Kisanrao Kale17/04/2026
CC12602257Ashdan Developers Private LimitedAnjali Shishikant Kale17/04/2026
CC12602258Ashdan Developers Private LimitedSUMAN POPAT GAWALI17/04/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Apr 2024

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrancesFile: T8.pdf20 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- CYGNUS T8.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: CYGNUS T8 30062024.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: CYGNUS T8 30092024.pdf15 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: CYGNUS CC FORM 4 OC.pdf29 Jun 2024
PAN CardFile: Ashdan Developers Private Limited.pdf20 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A CYGNUS T8 31032024.pdf16 May 2024
Disclosure of sold/ booked inventoryFile: INVENTORY CYGNUS T8 31032024.pdf6 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CYGNUS T8 31032024.pdf26 Apr 2024
Certificates of CA (Form 3)File: FORM 3 CYGNUS T8 31032024.pdf26 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Manjari Sector R 1 T8 Completion.pdf19 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CYGNUS T8 31032024.pdf4 Apr 2024
Certificates of CA (Form 3)File: FORM 3 CYGNUS T8 31032022.pdf29 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CYGNUS T8 31032022.pdf28 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CYGNUS T8 30092022.pdf27 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CYGNUS T8 30062022.pdf21 Mar 2024
Certificates of CA (Form 3)File: FORM 3 CYGNUS T8 30062022.pdf21 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 CYGNUS T8 2019-20.pdf7 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 CYGNUS T8 2020-21.pdf7 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 CYGNUS T8 2021-22.pdf7 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 CYGNUS T8 2022-23.pdf7 Feb 2024
Disclosure of sold/ booked inventoryFile: INVENTORY 31122023 CYGNUS T8.pdf31 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CYGNUS T8 31122023.pdf25 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CYGNUS T8 31122023.pdf22 Jan 2024
Certificates of CA (Form 3)File: FORM 3 T8 31122023.pdf22 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CYGNUS T8 30092023.pdf28 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 CYGNUS T8 30092023.pdf25 Oct 2023
Disclosure of sold/ booked inventoryFile: INVENTORY CYGNUS T8 30092023.pdf19 Oct 2023
Certificates of CA (Form 3)File: FORM 3 CYGNUS T8 30092023.pdf19 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 T8 30062023.pdf7 Aug 2023
Details of encumbrancesFile: FE T8 010823.pdf1 Aug 2023
Certificates of CA (Form 3)File: FORM 3 T8 30062023.pdf1 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 T8 30062023.pdf31 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 T8 31032023.pdf26 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 T8 31032023.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A T8 31032022.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A T8 31032023.pdf25 Jul 2023
Disclosure of sold/ booked inventoryFile: T8 30092022.pdf25 Jul 2023
Disclosure of sold/ booked inventoryFile: T8 31122022.pdf25 Jul 2023
Disclosure of sold/ booked inventoryFile: T8 31032023.pdf25 Jul 2023
Disclosure of sold/ booked inventoryFile: T8 30062023.pdf25 Jul 2023
Certificates of CA (Form 3)File: FORM 3 T8 31032023.pdf5 Jul 2023
Certificates of CA (Form 3)File: tower 8 (1)_compressed.pdf4 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 T8 31032023.pdf29 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 T8 30092022.pdf28 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 211019 - RERA Certificate - T8 19102021_compressed (1).pdf20 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - T8 - 31122022_compressed.pdf20 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Beaumonde T8.pdf20 Mar 2023
Certificates of CA (Form 3)File: Form 3_VTP-Cygnus Tower 8_Sept 2022_compressed.pdf20 Mar 2023
Certificates of CA (Form 3)File: Form 3- Cygnus T8_compressed.pdf20 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 8.pdf25 Jul 2022
Disclosure of sold/ booked inventoryFile: Tower 8_compressed.pdf4 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: T8.pdf23 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 8.pdf9 Apr 2022
Disclosure of sold/ booked inventoryFile: Tower 8.pdf9 Apr 2022
Disclosure of sold/ booked inventoryFile: T888.pdf7 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: T-08-JAN 21 TO MARCH 21.pdf18 Nov 2021
Declaration about Commencement CertificateFile: T8.pdf16 Nov 2021
Disclosure of sold/ booked inventoryFile: T8.pdf12 Nov 2021
Details of encumbrancesFile: Ashdan Encumbrance_Signed.pdf21 Oct 2021
Copy of the legal title reportFile: merged document upload-compressed.pdf24 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Kulnation_T8.pdf6 Dec 2019
Certificates of CA (Form 5)File: R1 Tower -8_compressed.pdf30 Sep 2019
Certificates of CA (Form 5)File: ASHDHAN Dev Pvt Ltd_Kul Nation R1 Tower8.pdf30 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: Nation Sanction Order-T 7 to T10.pdf17 Feb 2018
Declaration in FORM BFile: Kul Nation T8.pdf16 Feb 2018
Building plan approvalFile: Floor plan R1 tower 7 8 9.pdf31 Jul 2017
Copy of the legal title reportFile: Title Certificate Nation Tower 8.pdf31 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate Nation Tower 8.pdf31 Jul 2017
Building Plan Approval (IOD)File: Floor plan R1 tower 7 8 9.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate for Nation R1 Tower 8.pdf31 Jul 2017
Layout approvalFile: R1 Proposed Layout.pdf30 Jul 2017
Layout approvalFile: R1 Current Layout.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: R1 Proposed Layout.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: R1 Current Layout.pdf30 Jul 2017
Declaration in FORM BFile: Affidivate.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA Certificate.pdf30 Jul 2017
Proforma of Allotment letterFile: Tower 8-Nation Under Taking.pdf30 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vtp Cygnus- Nation R1-Tower 8 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Manjri13,700+ in Pune

2 kmVtp Cygnus- Nation R1-ToCompleted 10Lapsed / revoked 4Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 40 registered projects within 2 km.

Builder: Ashdan Developers Private Limited

Ashdan Developers Private Limited has 16 registrations on MahaRERA, including Vtp Cygnus- Nation R1-Tower 9 and VTP Beaumonde-Nation R2 T1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 9 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Vtp Cygnus- Nation R1-Tower 8 is delayed beyond 14 Jul 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vtp Cygnus- Nation R1-Tower 8?

The registered promoter entity is Ashdan Developers Private Limited, a company as per the filing. Its CIN U70102PN2006PTC129196 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vtp Cygnus- Nation R1-Tower 8?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Vtp Cygnus- Nation R1-Tower 8?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Vtp Cygnus- Nation R1-Tower 8?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vtp Cygnus- Nation R1-Tower 8?

The professionals named in the filing: Architect: VK A ARCHITECTURE; Engineer: J W Consultants LLP; Engineer: RAVI VIVEKANANDAN; Chartered Accountant: Priyanka Chordiya & Associates; Chartered Accountant: SAC & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vtp Cygnus- Nation R1-Tower 8?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vtp Cygnus- Nation R1-Tower 8. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vtp Cygnus- Nation R1-Tower 8 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.