Red flags

  • Litigation declared, 3 cases
  • 24 complaints at MahaRERA
  • Completion date moved by 21 months
  • 3 extensions taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
24Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Vtp Beaumonde- Nation R2 Tower5 is a Residential / Group Housing project by Ashdan Developers Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100007384 on 17 Aug 2017. The registration is recorded completed; possession was promised by 15 Apr 2024. The completion date has moved by 21 months from the original filing. 24 complaints are on record with the regulator.

At a glance

Project

  • NameVtp Beaumonde- Nation R2 Tower5
  • TypeResidential / Group Housing
  • Location
    • Gat No 124
    • Manjri
    • MANJARI KH
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100007384
  • ReraGenie IDRG-MH-20287

Builder

  • NameAshdan Developers Private Limited
  • Entity typeCompany
  • CINU70102PN2006PTC129196
  • GSTIN27AABCL4100E1Z5
  • DirectorsMeena Manohar Karne, Buhushan Vilaskumar Palresha, Nilesh Vilaskumar Palresha, Anil Shantilal Kankariya
  • Other registrations15 more →
  • Completed4 of 16
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseJul 2022Revised toApr 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Aug 2017
  • Promised completion15 Apr 2024
  • Revised completionRevised to 15 Apr 2024 (originally 19 Jul 2022)
  • Buildings1 building record
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Kul Nation R2- Tower 5NA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Kul Nation R2- Tower 5: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 20 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes90%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsYes80%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes90%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
Swimming PoolYes0%

Parking filed133

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots133
Closed/Covered133

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,097 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Arhum Erectors LLPVIMANNAGARPune

Approvals and building plan

Sanctioning authorityPUNE METROPOLITAN REGION DEVELOPMENT AUTHORITY PUNE
Permissible FSI18860.28
Proposed, not sanctioned18,860 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMUMBAI

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Eleven
ArchitectVK ARCHITECTURE
EngineerJW Consultants LLP Formerly Y S Sane Associates
EngineerRAVI VIVEKANANDAN
Chartered AccountantSPAK AND COMPANY
Chartered AccountantBOGATI AND COMPANY
PartnerRole in project
Ashdan Developers Private Limited-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100011097Jul 2022 → Jul 2023

Reason as filed by the promoterThe promoter Ashdan Developers Private limited has registered the project VTP BEAUMONDE¬ NATION R2 TOWER5 with the Maharashtra Real Estate Regulatory Authority vide No. P52100007384. In the said project the promoter is proposing to contruct Building Tower 5 having 1Basement + 1 Plint+ 24 floors. Due to covid pandemic and lockdowns, it has caused disruption of supply chains for obtaining construction material, labour work force and slowdown in pace of construction. Due to abovementioned reasons the regular development and timely completion of the abovementioned project is adversely affected. As

EXT52100017191Jul 2022 → Mar 2024

Reason as filed by the promoterThe project is delayed due to effect of pandemic COVID-19, the operations of the project were substantially affected in the absence of material and unavailability of labour. It took long time to reorganize the labour and restore the development. Further thereafter, since then engaged Contractor could not complete the construction, hence we had to replace the earlier contractor by engaging another Contractor, the process to settle earlier contractor and mobilise another contractor took time to restore the development. The structure of the building under project has been completed and the intern

EXT52100019670Jul 2022 → Apr 2024

Reason as filed by the promoterThe project has been completed and full Occupancy Certificate thereof has been received and the same are uploaded on the project webpage. The project registration was valid upto 31.03.2024 hence we humbly request you to grant us a post facto extension for the project till 15.04.2024.

Litigation declared3

CaseCourtStatus
1170/2014/2014CJSDOngoing
264/2015/2015CJSDOngoing
401943/2015/2015CJM PUNEOngoing

Complaints filed with MahaRERA24

Case no.ComplainantRespondentFiled
CC005000000000093UMESH MAGARKUL DEVELOPERS PVT LTD18/08/2017
CC005000000043784UMESH SANDIPAN MAGARKUL DEVELOPERS PVT LTD. Alias Ashdan Developers private Ltd.14/12/2019
CC005000000011083Delay in flat possessionKul developers private limited25/02/2018
CC005000000022114Chetan Shivaji ThakareAshdan Developers Private Limited06/10/2018
CC005000000064237MOHAN LAXMIANT DESHKARASHDAN DEVELOPERS PVT LTD31/05/2020
CC005000000022889Jitendra GuptaAshdan Developers Private Limited10/04/2019
CC005000000022983Kamali SarabuKul Developers Private Limited07/05/2019
CC005000000033527Mrs Jyoti GuptaAshdan Developers Pvt Ltd22/10/2019
CC005000000043719Sudhir Kumar SrivastavaAshdan Developers Pvt Ltd30/11/2019
CC005000000043773SwastikAshdan Developers Private Limited14/12/2019
CC005000000053866Jyoti Abhijeet PatoleKul Developers Private Limited Through Its Authorised Signatory Indarmal S Gandhi23/02/2020
CC005000000064481Himanshu PrakashAshdan Developers Pvt Ltd03/09/2020
CC005000000064660Rakesh Shitaldas NagraniAshdan Developers Pvt Ltd (Erstwhile Kul Developers Pvt. Ltd) thro. its director Meena Manohar Karne27/09/2020
CC005000000064780Dillip PandaAshdan Developers Pvt Ltd12/11/2020
CC005000000064939Bhupesh wankarAshdan Developers Pvt Ltd.17/12/2020
CC005000000085365Rajeev Kumar PandeyAshdan Developers Pvt Ltd02/04/2021
CC005000000085638Sarita Sandeepkumar GiteAshdan Developers Pvt. Ltd16/11/2021
CC005000000137155Ankit GargAshdan Developers Pvt Ltd31/05/2022
CC005000000259221Rupali Sandeep ChouguleAshdan Developers Private Ltd (Erstwhile Kul Developers Pvt. Ltd.)27/07/2023
CC005000000290021Ashdan Developers Pvt. Ltd.SAGAR MAROTI KAKDE14/01/2024
CC005000000310367Alok GuptaAshdan Developers Pvt Limited12/02/2024
CC005000000310425Ankush Ulhas SolkeAshdan DevelopersPvt Ltd17/02/2024
CC12400455Mrs Archana Tushar FolaneAshdan Developers Private Limited18/10/2024
CC12603121Ankit GargAshdan Developers Private Limited25/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Feb 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Apr 2024

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Details of encumbrancesFile: T5.pdf20 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1- BEAUMONDE T5.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: BEAUMONDE T5 30092024.pdf15 Oct 2024
Disclosure of sold/ booked inventoryFile: BEAUMONDE 5 30062024.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A BEAUMONDE T5 31032024.pdf16 May 2024
Declaration in FORM BFile: Form B-compl date_rotated.pdf11 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 BEAUMONDE T5.pdf8 May 2024
Disclosure of sold/ booked inventoryFile: INVENTORY BEAUMONDE T5 31032024.pdf6 May 2024
PAN CardFile: Ashdan Developers Private Limited.pdf30 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure-Nilesh Sir.pdf30 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure_ADPL.pdf30 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Letter.pdf30 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - account.pdf30 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200305049067_For_Asset_Based_Search_27_04_2024_15_33_00_864.pdf29 Apr 2024
CERSAI detailsFile: Cersai Declaration (2).pdf29 Apr 2024
Disclosure of sold/ booked inventoryFile: Inventory- VTP Beaumonde.pdf29 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure- Bhushan Sir.pdf29 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 BEAUMONDE T5 31032024.pdf26 Apr 2024
Certificates of CA (Form 3)File: FORM 3 BEAUMONDE T5 31032024.pdf26 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Manjari Sector R 2 T5 Competition.pdf19 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BEAUMONDE T5 31032024.pdf4 Apr 2024
Certificates of CA (Form 3)File: FORM 3 BEAUMONDE T5 31032022.pdf29 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 BEAUMONDE T5 31032022.pdf28 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BEAUMONDE T5 30092022.pdf27 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 BEAUMONDE T5 30062022.pdf21 Mar 2024
Certificates of CA (Form 3)File: FORM 3 BEAUMONDE T5 30062022.pdf21 Mar 2024
Disclosure of sold/ booked inventoryFile: INVENTORY BEAUMONDE T5 31122023.pdf16 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 BEAUMONDE T5 31122023.pdf24 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BEAUMONDE T5 31122023.pdf22 Jan 2024
Certificates of CA (Form 3)File: FORM 3 T5 31122023.pdf22 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 BEAUMONDE T5 2021-22.pdf19 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 BEAUMONDE T5 2022-23.pdf19 Jan 2024
Disclosure of sold/ booked inventoryFile: INVENTORY BEAUMONDE T5 30092023.pdf30 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BEAUMONDE T5 30092023.pdf28 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 BEAUMONDE T5 30092023.pdf25 Oct 2023
Certificates of CA (Form 3)File: FORM 3 BEAUMONDE T5 30092023.pdf19 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 T5 30062023.pdf4 Aug 2023
Details of encumbrancesFile: FE T5 010823.pdf1 Aug 2023
Certificates of CA (Form 3)File: FORM 3 T5 30062023.pdf1 Aug 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 T5 30062023.pdf31 Jul 2023
Disclosure of sold/ booked inventoryFile: 30092022.pdf29 Jul 2023
Disclosure of sold/ booked inventoryFile: 31122022.pdf29 Jul 2023
Disclosure of sold/ booked inventoryFile: 31032023.pdf29 Jul 2023
Disclosure of sold/ booked inventoryFile: 30062023.pdf29 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 T5 31032023.pdf26 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A T5 31032022.pdf26 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A T5 31032023.pdf26 Jul 2023
Certificates of CA (Form 3)File: FORM 3 T5 31032023.pdf5 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 T5 31032023.pdf26 Apr 2023
Certificates of CA (Form 3)File: FORM 3 BEAUMONDE T5 30112022.pdf17 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1703-T5 31072021_compressed.pdf16 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1703-T5 31072021_compressed.pdf16 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 5.pdf15 Mar 2023
Certificates of CA (Form 3)File: FORM 3 BEAUMONDE T5 01102022.pdf10 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - T5.pdf28 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Beaumonde T5.pdf28 Jan 2023
Certificates of CA (Form 3)File: Tower 5_compressed.pdf28 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VTP BEAUMONDE TOWER 5FORM -2.pdf29 Oct 2022
Certificates of CA (Form 3)File: BEAUMONDE NATION TOWER-5 FORM -3.pdf29 Oct 2022
Disclosure of sold/ booked inventoryFile: Tower 5_compressed.pdf4 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: t5.pdf23 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Tower 5.pdf9 Apr 2022
Disclosure of sold/ booked inventoryFile: Tower 5.pdf9 Apr 2022
Disclosure of sold/ booked inventoryFile: T55.pdf7 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report_T5.pdf4 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Tower 5 19-20 Signed.pdf18 Dec 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Tower 5 20-21 Signed.pdf18 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: T-05-MARCH 20 TO JUNE 20.pdf30 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: T-5-JAN 21 TO MARCH 21.pdf18 Nov 2021
Declaration about Commencement CertificateFile: T5.pdf16 Nov 2021
Disclosure of sold/ booked inventoryFile: T5.pdf12 Nov 2021
Details of encumbrancesFile: Ashdan Encumbrance_Signed.pdf21 Oct 2021
Copy of the legal title reportFile: MERGED DOCUMENT compressed.pdf24 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Kulnation_T5.pdf6 Dec 2019
Certificates of CA (Form 5)File: R2 Tower -5_compressed.pdf30 Sep 2019
Certificates of CA (Form 5)File: ASHDHAN Dev Pvt Ltd_Kul Nation R2 Tower5.pdf30 Sep 2018
Commencement Certificates / NA Order for plotted developmentFile: Nation Collector Order T 1-2-4-5-6.pdf17 Feb 2018
Declaration in FORM BFile: Kul Nation T5.pdf16 Feb 2018
Copy of the legal title reportFile: Title Certificate Nation Tower 5.pdf31 Jul 2017
Details of encumbrancesFile: Encumbrance Certificate Nation Tower 5.pdf31 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 21 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Vtp Beaumonde- Nation R2 Tower5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Manjri13,700+ in Pune

2 kmVtp Beaumonde- Nation R2Completed 6Lapsed / revoked 4Other 25Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: Ashdan Developers Private Limited

Ashdan Developers Private Limited has 16 registrations on MahaRERA, including Vtp Cygnus- Nation R1-Tower 9 and VTP Beaumonde-Nation R2 T1. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 9 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Vtp Beaumonde- Nation R2 Tower5 is delayed beyond 15 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vtp Beaumonde- Nation R2 Tower5?

The registered promoter entity is Ashdan Developers Private Limited, a company as per the filing. Its CIN U70102PN2006PTC129196 and GSTIN 27AABCL4100E1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vtp Beaumonde- Nation R2 Tower5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Vtp Beaumonde- Nation R2 Tower5?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Vtp Beaumonde- Nation R2 Tower5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vtp Beaumonde- Nation R2 Tower5?

The professionals named in the filing: Architect: Design Eleven; Architect: VK ARCHITECTURE; Engineer: JW Consultants LLP Formerly Y S Sane Associates; Engineer: RAVI VIVEKANANDAN; Chartered Accountant: SPAK AND COMPANY; Chartered Accountant: BOGATI AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vtp Beaumonde- Nation R2 Tower5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vtp Beaumonde- Nation R2 Tower5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Vtp Beaumonde- Nation R2 Tower5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.