VTP Beaumonde Building T3
By ARHUM ERECTORS PRIVATE LIMITED
RG-MH-14604 · RERA P52100022781 · Last updated on MahaRERA portal: 16 Sep 2025
Source: official MahaRERA filing
Red flags
- Litigation declared, 2 cases
- 4 complaints at MahaRERA
- Rs 489.00 crore secured on the land, in favour of KOTAK REALTY FUND
- The declared charge does not appear in the CERSAI report on the filing
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VTP Beaumonde Building T3 is a Residential / Group Housing project by ARHUM ERECTORS PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100022781 on 17 Oct 2019. The registration is recorded completed; possession was promised by 30 Jun 2025. 210 of the 212 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 4 complaints are on record with the regulator.
At a glance
Project
- NameVTP Beaumonde Building T3
- TypeResidential / Group Housing
- Location
- Manjari road
- Manjari
- MANJARI KH
- Haveli
- Pune
- 412307
- Pincode412307
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100022781
- ReraGenie IDRG-MH-14604
Builder
- NameARHUM ERECTORS PRIVATE LIMITED
- Entity typeCompany
- CINU45400PN2021PTC201688
- GSTIN27AAVCA3261F1ZI
- DirectorsBhushan Vilaskumar Palresha, Nilesh Vilaskumar Palresha, Meena Manohar karne, Anil Shantilal Kankariya
- Other registrations5 more →
- Completed4 of 6
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on17 Oct 2019
- Promised completion30 Jun 2025
- Revised completionNone
- Buildings1 building record
- Documents filed100 files
Current status
Figures as on 16 Sep 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| T3 | NA | 29 | 27 | 212 | 0 | 212 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
T3: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities19
As on 16 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 70% |
| Water Supply | Yes | 75% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 40% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 70% |
| Solid Waste Management And Disposal | Yes | 70% |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | Yes | 65% |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 85% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Water Pumps | No | Not applicable |
| Under Ground Water Tanks | No | Not applicable |
| Paving of Areas Appurtenant to Building | No | Not applicable |
| Compound Wall | No | Not applicable |
Parking filed65
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Ashdan Developers Private Ltd | Baner | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VK architect |
| Engineer | PRADYUNMA SURYAWANSHI |
| Engineer | Shahanawaz Shaikh |
| Engineer | RAVI VIVEKANANDAN |
| Chartered Accountant | Kailash Agarwal form five |
| Chartered Accountant | Priyanka Chordiya & Associates |
| Chartered Accountant | SPAK & Co |
| Partner | Role in project |
|---|---|
| ARHUM ERECTORS PRIVATE LIMITED | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 1170/2014 | ADDL.JUD.SMALL CAUSES CT AND JT.CJSD,JMFC PUNE | Ongoing |
| 401943/2015 | 6TH JOINT CIVIL JUDGE J.D. AND JMFC PUNE. | Ongoing |
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000290031 | ARHUM ERECTORS PVT. LTD. | FARZEEN SHAHED SHAIKH | 13/01/2024 |
| CC005000000290032 | ARHUM ERECTORS PVT. LTD. | RICKY RAMESH MALI | 13/01/2024 |
| CC12502377 | Abhijeet Dixit | ARHUM ERECTORS PRIVATE LIMITED | 13/07/2025 |
| CC12504578 | Gaurav Agrawal | ARHUM ERECTORS PRIVATE LIMITED | 22/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Sep 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Oct 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Oct 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 14 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 8 Feb 2025
Documents filed100
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 100 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: T-3.pdf | 16 Sep 2025 |
| Occupational CertificateFile: OC AND VERIFICATION MAIL MERGED- BEAUMONDE T3.pdf | 4 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: BEAUMONDE T3 31032025.pdf | 8 Apr 2025 |
| Other - TechnicalFile: T2 AND T3.pdf | 26 Mar 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Beaumonde R2 Tower 2 and 3 Completion Certificate.pdf | 8 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BEAUMONDE T3 31132024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BEAUMONDE T3 31122024.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: BEAUMONDE T3 31122024.pdf | 14 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BEAUMONDE T3 31122024.pdf | 10 Jan 2025 |
| Details of encumbrancesFile: T3.pdf | 20 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122021.pdf | 7 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122022.pdf | 7 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 01102022.pdf | 7 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 BEAUMONDE T3_2023-2024.pdf | 14 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BEAUMONDE T3 30092024.pdf | 13 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BEAUMONDE T3 17102024.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BEAUMONDE T3 30092024.pdf | 21 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: BEAUMONDE T3 30062024.pdf | 15 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: BEAUMONDE T3 30092024.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BEAUMONDE T3.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BEAUMONDE T3 16072024.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: BEAUMONDE 3 30062024.pdf | 17 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Vtp Beaumonde T3 300624.pdf | 16 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A BEAUMONDE T3 31032024.pdf | 16 May 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY BEAUMONDE T3 31032024.pdf | 6 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BEAUMONDE T3 31032024.pdf | 26 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BEAUMONDE T3 31032024.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BEAUMONDE T3 31032024.pdf | 4 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BEAUMONDE T3 31032022.pdf | 29 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BEAUMONDE T3 31032022.pdf | 28 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BEAUMONDE T3 30062022.pdf | 21 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BEAUMONDE T3 30062022.pdf | 21 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY BEAUMONDE T3 31122023.pdf | 16 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BEAUMONDE T3 31122023.pdf | 24 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BEAUMONDE T3 31122023.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 T3 31122023.pdf | 22 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY BEAUMONDE T3 30092023.pdf | 30 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 BEAUMONDE T3 30092023.pdf | 28 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 BEAUMONDE T3 30092023.pdf | 25 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BEAUMONDE T3 30092023.pdf | 19 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 BEAUMONDE T3 2022-23.pdf | 29 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: BEAUMONDE T3 30092022.pdf | 6 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: BEAUMONDE T3 31122022.pdf | 6 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: BEAUMONDE T3 31032023.pdf | 6 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: BEAUMONDE T3 30062023.pdf | 6 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 T3 30062023.pdf | 4 Aug 2023 |
| Details of encumbrancesFile: FE T3 010823.pdf | 1 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 T3 30062023.pdf | 1 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 T3 30062023.pdf | 31 Jul 2023 |
| Details of encumbrancesFile: T3 FE.pdf | 28 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 T3 31032023.pdf | 26 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A T3 31032022.pdf | 26 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A T3 31032023.pdf | 26 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 T3 31032023.pdf | 5 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 T3 31032023.pdf | 26 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 BEAUMONDE T3 31122021_compressed.pdf | 28 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1703-T3 31072021_compressed.pdf | 16 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VTP BEAUMONDE T3 31122021.pdf | 8 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VTP BEAUMONDE T3 30092022.pdf | 6 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 - T3 - 2122.pdf | 1 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - T3.pdf | 28 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Beaumonde T3.pdf | 28 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Tower 3_compressed.pdf | 28 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VTP BEAUMOND T3 FORM 3.pdf | 29 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 TOWER 3 BEAUMONDE.pdf | 29 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: VTP BEAUMOND T3 FORM 3.pdf | 29 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Tower 3.pdf | 25 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Tower 3.pdf | 4 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: T3.pdf | 23 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: T3.pdf | 11 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T3.pdf | 11 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Tower 3.pdf | 9 Apr 2022 |
| CERSAI detailsFile: T3.pdf | 9 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: T3.pdf | 7 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: T3 2021.pdf | 31 Dec 2021 |
| Disclosure of sold/ booked inventoryFile: T3.pdf | 12 Nov 2021 |
| Details of encumbrancesFile: Arhum Encumbrance_Signed.pdf | 21 Oct 2021 |
| Copy of the legal title reportFile: MERGED DOCUMENT compressed.pdf | 24 Sep 2021 |
| Declaration about Commencement CertificateFile: T3_CC.pdf | 23 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: T3_2A_3qtr2019_compressed.pdf | 23 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 100 filed documents as one ZIP, foldered, with a manifest
Keep VTP Beaumonde Building T3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Manjari13,700+ in Pune
Filed coordinates, straight-line distance. 44 registered projects within 2 km.
MAGNACITY - Tower A2
Malnad Project (I) Pvt Ltd
Birla Evam Phase 1
Vypak Properties Private Limited
VTP AURELIA PHASE 1
ASOJ REALTY LLP
GODREJ BOULEVARD
Manjari Housing Projects LLP
Godrej Park Springs
Manjari Housing Projects LLP
VTP DOLCE VITA Phase 1
Ashdan Developers Private Limited
Builder: ARHUM ERECTORS PRIVATE LIMITED
ARHUM ERECTORS PRIVATE LIMITED has 6 registrations on MahaRERA, including VTP Beaumonde Nation R2 Tower6 and VTP Beaumonde Building T3. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VTP Beaumonde Building T3 is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VTP Beaumonde Building T3?
The registered promoter entity is ARHUM ERECTORS PRIVATE LIMITED, a company as per the filing. Its CIN U45400PN2021PTC201688 and GSTIN 27AAVCA3261F1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VTP Beaumonde Building T3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VTP Beaumonde Building T3?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VTP Beaumonde Building T3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VTP Beaumonde Building T3?
The professionals named in the filing: Architect: VK architect; Engineer: PRADYUNMA SURYAWANSHI; Engineer: Shahanawaz Shaikh; Engineer: RAVI VIVEKANANDAN; Chartered Accountant: Kailash Agarwal form five; Chartered Accountant: Priyanka Chordiya & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VTP Beaumonde Building T3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback