Home / Browse projects / Pune, Maharashtra / VTP Aethereus phase2
VTP Aethereus phase2
By HOME RISING CONSTRUCTION LLP
RG-MH-17213 · RERA P52100028131 · Last updated on MahaRERA portal: 18 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 12 complaints at MahaRERA
- Rs 875.00 crore secured on the land, in favour of ARES (SSG) SINGAPORE PTE LTD, Aditya Birla Capital Limited
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VTP Aethereus phase2 is a Residential / Group Housing project by HOME RISING CONSTRUCTION LLP in Pune, Maharashtra, registered with MahaRERA as P52100028131 on 4 Feb 2021. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 473 of the 476 units on this registration are recorded sold or booked, and 21 of 22 construction stages are filed complete. 12 complaints are on record with the regulator.
At a glance
Project
- NameVTP Aethereus phase2
- TypeResidential / Group Housing
- Location
- Mann Mhalunge Road
- Mhalunge
- Mahalunge
- Mulshi
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100028131
- ReraGenie IDRG-MH-17213
Builder
- NameHOME RISING CONSTRUCTION LLP
- Entity typePartnership
- PartnerBhushan Vilaskumar Palresha
- Other registrations2 more →
- Completed1 of 3
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on4 Feb 2021
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings2 building records
- Documents filed99 files
Current status
Figures as on 18 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower-2 | NA | 36 | 31 | 238 | 0 | 238 |
| Tower-4 | NA | 36 | 31 | 238 | 0 | 238 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
21 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 99%.
Tower-2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Tower-4100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 99% |
Progress on shared amenities15
As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 63% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 60% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 85% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed22
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Tower-2 | 1 | 10 | 11 |
| Tower-4 | 1 | 10 | 11 |
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Mhalunge Land Developers LLP | Baner | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Tower-4 | NA | Rs 75.72 cr | Rs 75.72 cr |
| Tower-2 | NA | Rs 61.24 cr | Rs 61.24 cr |
| - | NA | Rs 9.89 cr | Rs 9.89 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VK Architects |
| Architect | ANA CONSORTIUM PVT LTD |
| Engineer | UBED BAGWAN |
| Engineer | SHITAL KADAM |
| Engineer | Mukesh Jadhav |
| Chartered Accountant | GMKS & CO. |
| Chartered Accountant | Spak & Co |
| Chartered Accountant | Priyanka Chordiya & Associates |
| Partner | Role in project |
|---|---|
| HOME RISING CONSTRUCTION LLP | - |
Complaints filed with MahaRERA12
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12400864 | HOME RISING CONSTRUCTION LLP | SHANTANU SHANKAR DESHMUKH | 23/11/2024 |
| CC12400865 | HOME RISING CONSTRUCTION LLP | Anagha Gangurde | 23/11/2024 |
| CC12400866 | HOME RISING CONSTRUCTION LLP | Anagha Gangurde | 23/11/2024 |
| CC12400868 | HOME RISING CONSTRUCTION LLP | SURAJ SUDHAKAR POTDAR | 23/11/2024 |
| CC12401022 | HOME RISING CONSTRUCTION LLP | ABHISHEK KRISHAN CHOUDHARY | 04/12/2024 |
| CC12401024 | HOME RISING CONSTRUCTION LLP | SNEHA PIYUSH GUGALE | 04/12/2024 |
| CC12501218 | Suraj Hasabe | HOME RISING CONSTRUCTION LLP | 12/04/2025 |
| CC12502765 | vineet gupta | HOME RISING CONSTRUCTION LLP | 06/08/2025 |
| CC12600530 | Asif Shaikh | HOME RISING CONSTRUCTION LLP | 30/01/2026 |
| CC12600887 | Vijay Limaji Patil | HOME RISING CONSTRUCTION LLP | 18/02/2026 |
| CC12602965 | Rajendra Shankar Pawar | HOME RISING CONSTRUCTION LLP | 19/05/2026 |
| CC12603648 | Nandkumar Maruti Patil | HOME RISING CONSTRUCTION LLP | 12/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jan 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jan 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jan 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 4 Jan 2025
Documents filed99
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: VTP Aethereus RERA FORM 2A 2026.pdf | 18 Jun 2026 |
| Withdrawal Update Form 1File: RERA FORM-1 AETHEREUS PHASE 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 AETHEREUS PHASE 2.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3- AETHEREUS PHASE 2_11zon.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1- AETHEREUS PHASE 2.pdf | 16 Oct 2025 |
| Withdrawal Update Form 1 | 16 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 AETHEREUS PHASE 2.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2 | 16 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3- AETHEREUS PHASE 2_11zon.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3 | 16 Oct 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A AETHEREUS PHASE 2.pdf | 24 Jun 2025 |
| Form 1File: FORM 1 AETHEREUS PHASE 2 31032025.pdf | 22 May 2025 |
| Form 2File: Form 2 Aethereus Phase 2.pdf | 22 May 2025 |
| Form 3File: FORM 3 AETHEREUS PHASE 2 30032025.pdf | 22 May 2025 |
| Disclosure of Sold and Booked InventoryFile: AETHEREUS PHASE II 31032025.pdf | 22 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 2 30032025.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aethereus Phase 2.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PHASE 2 31032025.pdf | 12 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: AETHEREUS PHASE II 31032025.pdf | 5 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PHASE 2 31122024.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 2 31122024.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS PHASE 2 31122024.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: AETHEREUS PHASE 2 31122024.pdf | 8 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: MMH R-10 Completion Certificate (2).pdf | 4 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PH 2 30092024.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 2 30092024.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS PHASE 2 30092024.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 2 30092024.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS PHASE 2 30092024.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: ATHEREUS PH2 30092024.pdf | 14 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 AETHEREUS PHASE 2.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 2 JUNE 2024.pdf | 2 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PHASE 2 30062024.pdf | 27 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02 30062024 VTP Aethereus Phase 02.pdf | 22 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTP Aethereus Phase 2 Jun 24.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: VTP Aethereus P 2 30062024.pdf | 6 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A AETHEREUS PHASE 2 31032024.pdf | 16 May 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY AETHEREUS PHASE 2 31032024.pdf | 6 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS PHASE 2 31032024.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PHASE 2 31032024.pdf | 27 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 2 31032024.pdf | 27 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PHASE 2 30092022.pdf | 4 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS 2 30062022.pdf | 28 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS 2 30092022.pdf | 28 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY AETHEREUS PHASE 2 31122023.pdf | 8 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS PHASE 2 31122023.pdf | 5 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Aethereus Phase 2 31122023.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 2 31122023.pdf | 22 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 AETHEREUS PHASE 2 2022-23.pdf | 30 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VTP Aethereus_Form2_Ph 2_30092023.pdf | 28 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS PHASE 2 30092023.pdf | 28 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PHASE 2 30092023.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: FORM 1 AETHEREUS PHASE 2 30092023.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY AETHEREUS PHASE 2 30092023.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: AETHEREUS PHASE 2 30092022.pdf | 30 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: AETHEREUS PHASE 2 31122022.pdf | 30 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: AETHEREUS PHASE 2 30062023.pdf | 30 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A AETHEREUS PHASE 2 31032023.pdf | 29 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: VTP Aethereus Phase 2.pdf | 25 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PH 2 30062023_compressed.pdf | 24 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETH PH 2 30062023.pdf | 24 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETH PH 2_compressed.pdf | 24 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: AETHEREUS PHASE 2.pdf | 12 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Aethereus PH II.pdf | 30 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS PH 2 31032023.pdf | 29 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31032023_compressed.pdf | 15 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A June 2021 VTP Aethereus 2.pdf | 1 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Sep 2021 Aethereus 2.pdf | 1 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETH 2 31122021.pdf | 28 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS 2 31122021.pdf | 28 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HomeRising Phase 2 Dec Form 3.pdf | 2 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - AETHEREUS 2.pdf | 28 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 8131 FORM 5.pdf | 17 Oct 2022 |
| CERSAI detailsFile: Aethereus 1, 2.pdf | 19 Jul 2022 |
| Other - LegalFile: 4_8155_2021_Conveyance_22792_compressed.pdf | 15 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aethreus Phase 2_compressed.pdf | 9 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Aethereus 2_compressed.pdf | 4 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aethereus Phase 2.pdf | 28 Apr 2022 |
| CERSAI detailsFile: Aethereus 1, 2.pdf | 14 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Aethereus 2.pdf | 11 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 99 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VTP Aethereus phase2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mhalunge13,700+ in Pune
Filed coordinates, straight-line distance. 65 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: HOME RISING CONSTRUCTION LLP
HOME RISING CONSTRUCTION LLP has 3 registrations on MahaRERA, including VTP Aethereus- Phase1 and VTP Aethereus phase2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that VTP Aethereus phase2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if VTP Aethereus phase2 is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VTP Aethereus phase2?
The registered promoter entity is HOME RISING CONSTRUCTION LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VTP Aethereus phase2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VTP Aethereus phase2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VTP Aethereus phase2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VTP Aethereus phase2?
The professionals named in the filing: Architect: VK Architects; Architect: ANA CONSORTIUM PVT LTD; Engineer: UBED BAGWAN; Engineer: SHITAL KADAM; Engineer: Mukesh Jadhav; Chartered Accountant: GMKS & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VTP Aethereus phase2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback