ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / VTP AETHEREUS HIGH STREET

Completed No litigation declared Commercial project

VTP AETHEREUS HIGH STREET

By HOME RISING CONSTRUCTION LLP

RG-MH-34995 · RERA P52100055356 · Last updated on MahaRERA portal: 18 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 75.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
18 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 25%
39 of 62Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

VTP AETHEREUS HIGH STREET is a Commercial project by HOME RISING CONSTRUCTION LLP in Pune, Maharashtra, registered with MahaRERA as P52100055356 on 22 Mar 2024. The registration is recorded completed; possession was promised by 31 Mar 2026. The completion date has moved by 12 months from the original filing. 23 of the 62 units on this registration are recorded sold or booked, and 18 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameVTP AETHEREUS HIGH STREET
  • TypeCommercial
  • Location
    • Hinjewadi Maan Mahalunge road
    • Mahalunge
    • Mulshi
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055356
  • ReraGenie IDRG-MH-34995

Builder

  • NameHOME RISING CONSTRUCTION LLP
  • Entity typePartnership
  • PartnerBhushan Vilaskumar Palresha
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2024First promiseMar 2025Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Mar 2024
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 31 Mar 2025)
  • Buildings3 building records
  • Documents filed90 files

Current status

37%23 of 62 units booked
84.1%Work done, per cost certificate

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Commercial 1NA2101111
Commercial 2NA3202828
Commercial 3NA3202323

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 25%.

Commercial 159%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises6%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.14%
Commercial 259%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises6%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.14%
Commercial 359%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises6%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.14%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes15%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes50%
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,808 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 75.00 crore
CERSAI search filedYes
Declared on10 Nov 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority, Pune
Permissible FSI7554.06
Proposed, not sanctioned6,554 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch5C/II Mittal Court 224 Nariman Point Mumbai Maharashtra 400021
Estimated costRs 42.33 cr
Cost incurredRs 35.61 cr
Work done84.11%
BuildingWingEstimatedIncurred
Commercial 2NARs 17.81 crRs 14.84 cr
Commercial 3NARs 14.73 crRs 12.27 cr
Commercial 1NARs 7.77 crRs 6.48 cr
-NARs 2.02 crRs 2.02 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK Architects
ArchitectANA CONSORTIUM PVT LTD
EngineerSheetal Kadam
EngineerUBED BAGWAN
EngineerSHITAL KADAM
Chartered AccountantSpak & Co
Chartered AccountantGMKS & CO.
Chartered AccountantPriyanka Chordiya & Associates
PartnerRole in project
HOME RISING CONSTRUCTION LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100028048Mar 2025 → Mar 2026

Reason as filed by the promoterThe promoter Home Rising Construction LLP has registered the project ‘AETHEREUS HIGH STREET’ with the Maharashtra Real Estate Regulatory Authority vide no. P52100055356 The project registration is valid up to 31.03.2025. The Promoter hereby seeking for extension up to 31.03.2026. Project Details: The project comprises 62 shops, out of which 18 shops have been sold/booked. As per MahaRERA guidelines, we have obtained 10 consents from allottees, which are attached herewith under the Project Extension section on the MahaRERA portal. Reasons for extension request are, Market-Driven Challenges: The

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12603347HOME RISING CONSTRUCTION LLPMR SANTOSH RAMDAS BENDRE01/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Mar 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: VTP AETHEREUS RERA FORM 2A 2026 high street.pdf18 Jun 2026
Occupational CertificateFile: OC - VTP Aethereus Highstreet - Copy.pdf15 Nov 2025
Occupational CertificateFile: OC - VTP Aethereus Highstreet.pdf6 Nov 2025
Withdrawal Update Form 1File: FORM 1- AETHEREUS HIGHSTREET.pdf16 Oct 2025
Withdrawal Update Form 1File: FORM 1- AETHEREUS HIGHSTREET.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM 2 AETHEREUS HIGHSTREET.pdf16 Oct 2025
Withdrawal Update Form 2File: FORM 2 AETHEREUS HIGHSTREET.pdf16 Oct 2025
Withdrawal Update Form 3File: FORM 3- AETHEREUS HIGHSTREET_11zon.pdf16 Oct 2025
Withdrawal Update Form 3File: FORM 3- AETHEREUS HIGHSTREET_11zon.pdf16 Oct 2025
Form 2A (FY 2024-2025)File: FORM 2A AETHEREUS HIGHSTREET.pdf24 Jun 2025
Form 1File: FORM 1 AETHEREUS HIGH STREET 31032025.pdf22 May 2025
Form 2File: Form 2 Aethereus Highstreet.pdf22 May 2025
Form 3File: FORM 3 AETHEREUS HIGHSTREET 30032025.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: AETHEREUS HIGH STREET 31032025.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: AETHEREUS HIGH STREET 31032025.pdf22 May 2025
Form 3File: FORM 3 AETHEREUS HIGHSTREET 30032025.pdf22 May 2025
Form 2File: Form 2 Aethereus Highstreet.pdf22 May 2025
Form 1File: FORM 1 AETHEREUS HIGH STREET 31032025.pdf22 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS HIGH STREET 31032025.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS HIGHSTREET 30032025.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Aethereus Highstreet.pdf19 Apr 2025
Other - TechnicalFile: PERT CHART - Commercial 1.pdf9 Apr 2025
Other - TechnicalFile: PERT CHART - Commercial 2.pdf9 Apr 2025
Other - TechnicalFile: PERT CHART - Commercial 3.pdf9 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 AETHEREUS HIGHSTREET 2023-2024.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: AETHEREUS HIGH STREET 31032025.pdf4 Apr 2025
Declaration in FORM BFile: Form B 25032025.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 AETHEREUS HIGHSTREET 31122024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS HIGHSTREET 31122024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS HIGHSTREET 31122024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: AETHEREUS HIGH STREET 31122024.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS HIGH STREET 30092024.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS HIGH STREET 30092024.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS HIGH STREET.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS HIGH STREET 30092024.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS HIGH STREET.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: ATHEREUS HIGH STREET 30092024.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS HIGH STREET JUNE 2024.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS HIGH STREET 30062024.pdf27 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 02 31032024 VTP Aethereus High Street.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 VTPAethereus Phase Commercial 30062024.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: VTP Aethereus High Street 30062024.pdf6 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A AETHEREUS HIGH STREET 31032024.pdf16 May 2024
Disclosure of sold/ booked inventoryFile: INVENTORY AETHEREUS HIGH STREET 31032024.pdf8 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 AETHEREUS HIGH STREET 31032024.pdf30 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 AETHEREUS HIGH STREET 31032024.pdf30 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 AETHEREUS HIGH STREET 31032024.pdf30 Apr 2024
Declaration about Commencement CertificateFile: PROPONENT CONSENT LETTER.pdf21 Mar 2024
Declaration about Commencement CertificateFile: FORMAT D AETHEREUS.pdf19 Mar 2024
Proforma of Agreement for saleFile: AFS_VTP Aethereus High Street.pdf19 Mar 2024
Deviation Report with respect to model copy of AgreementFile: aethereus - afs deviation.pdf19 Mar 2024
Other - LegalFile: DECLARATION AS TO OWNERSHIP AETHEREUS.pdf19 Mar 2024
Other - FinanceFile: CERSAI DECLARATION - AETHEREUS.pdf19 Mar 2024
Layout approvalFile: MMH R10 - LAYOUT PLAN.pdf5 Mar 2024
Layout approvalFile: Aethereus High Street - Declaration 05032024.pdf5 Mar 2024
Copy of the legal title reportFile: TSR 05032024.pdf5 Mar 2024
Copy of Layout Approval (in case of layout)File: MMH R10 - LAYOUT PLAN.pdf5 Mar 2024
Copy of Layout Approval (in case of layout)File: Aethereus High Street - Declaration 05032024.pdf5 Mar 2024
Other - LegalFile: 8155 2021 Conveyance Deed.pdf5 Mar 2024
Other - LegalFile: LLP Agreement.pdf5 Mar 2024
Building plan approvalFile: 30_37.pdf23 Feb 2024
Building plan approvalFile: 31_37.pdf23 Feb 2024
Building plan approvalFile: 32_37.pdf23 Feb 2024
Building plan approvalFile: 33_37.pdf23 Feb 2024
Building plan approvalFile: 34_37.pdf23 Feb 2024
Building plan approvalFile: 35_37.pdf23 Feb 2024
Building plan approvalFile: 36_37.pdf23 Feb 2024
PAN CardFile: PAN CARD.pdf23 Feb 2024
Details of encumbrances concerned to FinanceFile: Finance encumbrance (2).pdf23 Feb 2024
Details of encumbrances concerned to FinanceFile: Legal encumbrance (2).pdf23 Feb 2024
Details of encumbrances concerned to LegalFile: Finance encumbrance (2).pdf23 Feb 2024
Details of encumbrances concerned to LegalFile: Legal encumbrance (2).pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 30_37.pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 31_37.pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 32_37.pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 33_37.pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 34_37.pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 35_37.pdf23 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 36_37.pdf23 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: MMH R10 Commencement Certificate_compressed.pdf23 Feb 2024

How this compares with Pune

37%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VTP AETHEREUS HIGH STREET on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mahalunge13,700+ in Pune

2 kmVTP AETHEREUS HIGH STREECompleted 22Lapsed / revoked 9Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 65 registered projects within 2 km.

Builder: HOME RISING CONSTRUCTION LLP

HOME RISING CONSTRUCTION LLP has 3 registrations on MahaRERA, including VTP Aethereus- Phase1 and VTP Aethereus phase2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VTP AETHEREUS HIGH STREET is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VTP AETHEREUS HIGH STREET?

The registered promoter entity is HOME RISING CONSTRUCTION LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VTP AETHEREUS HIGH STREET?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VTP AETHEREUS HIGH STREET?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VTP AETHEREUS HIGH STREET?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VTP AETHEREUS HIGH STREET?

The professionals named in the filing: Architect: VK Architects; Architect: ANA CONSORTIUM PVT LTD; Engineer: Sheetal Kadam; Engineer: UBED BAGWAN; Engineer: SHITAL KADAM; Chartered Accountant: Spak & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VTP AETHEREUS HIGH STREET?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VTP AETHEREUS HIGH STREET. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VTP AETHEREUS HIGH STREET to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.