VRINDAVAN
RG-MH-98773 · RERA P52100051813 · Last updated on MahaRERA portal: 28 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VRINDAVAN is a Residential / Group Housing project by Parmeshwari Schemes in Pune, Maharashtra, registered with MahaRERA as P52100051813 on 3 Jul 2023. Possession is promised by 31 Jul 2027. 1 complaint is on record with the regulator.
At a glance
Project
- NameVRINDAVAN
- TypeResidential / Group Housing
- Location
- Trilok Society
- Warje
- Haveli
- Pune
- 411058
- Pincode411058
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100051813
- ReraGenie IDRG-MH-98773
Builder
- NameParmeshwari Schemes
- Entity typePartnership
- PartnersVivek Ganesh Vaidya, Shashank Padmakar Wad, Amol Subhash Pawar, Abhijit Shivaji Marne
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Jul 2023
- Promised completion31 Jul 2027
- Revised completionNone
- Buildings4 building records
- Documents filed101 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| B | NA | 10 | 0 | 0 | 0 | 0 |
| C | NA | 10 | 0 | 0 | 0 | 0 |
| D | NA | 10 | 0 | 0 | 0 | 0 |
| E | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 28 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.
B27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
D27%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
E9%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 28 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 25% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 10% |
| Community Buildings | Yes | 1% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 25% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership23
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mrs. Leelawati Balaso Surywanshui | Karve Nagar | Pune |
| Mr. Jayant Gopinath Kharave | - | Udupi |
| Mr. Balaram Raghunath Mahadik | Warje | Pune |
| Mr. Pandurang Dhondu Bhojane | Kothrud | Pune |
| Mr. Deepak Bhagwan Kumbhar | Karve Nagar | Pune |
| Mr. Bhagwan Nivrutti Kumbhar | Karve Nagar | Pune |
| Mr. Sanjay Nilubhau Maranholkar | Warje | Pune |
| Mr. Dilip Ranba Shinde | Pune (M Corp.) | Pune |
| Mr. Prakash Jagannath bokil | Pune (M Corp.) | Pune |
| Mr. Mohan Gulabrao Takawane | Pune (M Corp.) | Pune |
| Mr, Vitthal D Ravalekar | Dhankawadi | Pune |
| Mr, Nana Bhagwan Hedau | Karve Nagar | Pune |
| Shrikrishna Dhumal | Kothrud | Pune |
| Shantaram Mahadeo Kale | Pune (M Corp.) | Pune |
| Mr. Ramesh Gopalrao Pawar | Karve Nagar | Pune |
| Mr. Baban Gopalrao Potdar | Warje | Pune |
| Suman Govind Kumbhar | Karve Nagar | Pune |
| Sharadchandra Manohar Kulkarni | Warje | Pune |
| Mr. Narayan Maruti Badhe | Dhankawadi | Pune |
| Mr. Monish Narayan Badhe | Dhankawadi | Pune |
| Ms. Sunita Anil Jadhav | Pune (M Corp.) | Pune |
| Trilok CHS Ltd | Warje | Pune |
| Chandramohan Hemchandra Makasare | Warje | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| Parmeshwari Schemes | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12600187 | Ram Gawali | Parmeshwari Schemes | 23/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jul 2027
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 1225.pdf | 28 Apr 2026 |
| Form 2File: Form 2 PS 1225.pdf | 28 Apr 2026 |
| Form 3File: Signed FORM 1225.pdf | 28 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold LH.pdf | 28 Apr 2026 |
| Self-declaration of Quarterly ProgressFile: QPR Declaration.pdf | 28 Apr 2026 |
| Form 1File: Form 1 0326.pdf | 28 Apr 2026 |
| Form 2File: Form 2 0326.pdf | 28 Apr 2026 |
| Form 3File: Form 3 0326.pdf | 28 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 0326.pdf | 28 Apr 2026 |
| Self-declaration of Quarterly ProgressFile: QPR Declaration 0326.pdf | 28 Apr 2026 |
| Form 1File: Form 1 0625.pdf | 25 Nov 2025 |
| Form 2File: Form 2 0625.pdf | 25 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory PS 1224 UL.pdf | 25 Nov 2025 |
| Form 3File: Form 3 0625.pdf | 25 Nov 2025 |
| Form 1File: Form 1 0925.pdf | 25 Nov 2025 |
| Form 2File: Form 2 0925.pdf | 25 Nov 2025 |
| Form 3File: Form 3 0925.pdf | 25 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory PS 0925.pdf | 25 Nov 2025 |
| Building plan approvalFile: Plan 1.pdf | 25 Mar 2025 |
| Building plan approvalFile: Plan 2.pdf | 25 Mar 2025 |
| Building plan approvalFile: Plan 3.pdf | 25 Mar 2025 |
| Building plan approvalFile: Plan 4.pdf | 25 Mar 2025 |
| Building plan approvalFile: Plan 5.pdf | 25 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 25 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf | 25 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 25 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf | 25 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 4.pdf | 25 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf | 25 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PS 1224.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PS 1224 UL.pdf | 18 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PS 1224.pdf | 18 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory PS 1224 UL.pdf | 18 Feb 2025 |
| CERSAI detailsFile: CERSAI_Search_Report_200337846814_For_Debtor_Based_Search_30_01_2025_18_00_45_808.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 31 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 31 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 31 Dec 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: ok_Order_No_34.pdf | 30 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 26 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory.pdf | 26 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 26 Dec 2024 |
| Layout approvalFile: 1-1 Layout.pdf | 29 Nov 2024 |
| Building plan approvalFile: 1-5 1024.pdf | 29 Nov 2024 |
| Building plan approvalFile: 2-5 1024.pdf | 29 Nov 2024 |
| Building plan approvalFile: 3-5 1024.pdf | 29 Nov 2024 |
| Building plan approvalFile: 4-5 1024.pdf | 29 Nov 2024 |
| Building plan approvalFile: 5-5 1024.pdf | 29 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: 1-1 Layout.pdf | 29 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 1024.pdf | 29 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3-5 1024.pdf | 29 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 5-5 1024.pdf | 29 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4-5 1024.pdf | 29 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2-5 1024.pdf | 29 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1-5 1024.pdf | 29 Nov 2024 |
| Proforma of Agreement for saleFile: DRAFT RERA.pdf | 29 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter.pdf | 23 Nov 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter.pdf | 23 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter.pdf | 23 Nov 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter.pdf | 23 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 15 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory.pdf | 15 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 15 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 23-24.pdf | 13 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PS 23-24.pdf | 5 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A PS 23-24.pdf | 5 Apr 2024 |
| Copy of the legal title reportFile: SandT PS 140623 compressed.pdf | 15 Jun 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Self Declaration CC.pdf | 15 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PS 010623.pdf | 15 Jun 2023 |
| Proforma of Agreement for saleFile: AFS Comp 3.pdf | 15 Jun 2023 |
| Other - TechnicalFile: Form1 and cc declaration.pdf | 15 Jun 2023 |
| Other - TechnicalFile: area stats.pdf | 15 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: int in oth PS 050623_compressed.pdf | 5 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PS 030623_compressed.pdf | 3 Jun 2023 |
| Layout approvalFile: Layout_compressed.pdf | 2 Jun 2023 |
| Layout approvalFile: Wing B_compressed.pdf | 2 Jun 2023 |
| Layout approvalFile: Building C.pdf | 2 Jun 2023 |
| Layout approvalFile: Wing D_compressed.pdf | 2 Jun 2023 |
| Layout approvalFile: Building E.pdf | 2 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VRINDAVAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Warje13,700+ in Pune
Filed coordinates, straight-line distance. 117 registered projects within 2 km.
ONE PARK PLACE PH-I
LJB REALTY LLP
Vatika
kishor Laxmanrao Nimhan
KJ TOWER
KALYAN JAGANNATH JADHAV
Ved Laurels Phase I
Vednirmitee Projects
Cavansite Phase 2
Arma Landmark LLP
SHUBH SERENITY
SHUBH DEVELOPERS
Builder: Parmeshwari Schemes
Parmeshwari Schemes has 1 registration on MahaRERA, including VRINDAVAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if VRINDAVAN is delayed beyond 31 Jul 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VRINDAVAN?
The registered promoter entity is Parmeshwari Schemes, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VRINDAVAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against VRINDAVAN?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for VRINDAVAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in VRINDAVAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback