Home / Browse projects / Pune, Maharashtra / KJ TOWER

Registration lapsed No litigation declared Residential / Group Housing project

KJ TOWER

By KALYAN JAGANNATH JADHAV

RG-MH-20206 · RERA P52100008908 · Last updated on MahaRERA portal: 21 Aug 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 27 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
24 of 44Construction stages doneacross 4 buildings; furthest along: External plumbing and external plaster, 99%
102 of 160Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

KJ TOWER is a Residential / Group Housing project by KALYAN JAGANNATH JADHAV in Pune, Maharashtra, registered with MahaRERA as P52100008908 on 19 Aug 2017. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 27 months from the original filing. 58 of the 160 units on this registration are recorded sold or booked, and 24 of 44 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameKJ TOWER
  • TypeResidential / Group Housing
  • Location
    • 113
    • Urit Nagar
    • Warje
    • Haveli
    • Pune
    • 411058
  • Pincode411058
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100008908
  • ReraGenie IDRG-MH-20206

Builder

  • NameKALYAN JAGANNATH JADHAV
  • Entity typeIndividual

Key dates

4 months past promisethis monthRegisteredAug 2017First promiseMar 2024Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Mar 2024)
  • Buildings4 building records
  • Documents filed105 files

Current status

36%58 of 160 units booked
97.3%Work done, per cost certificate

Figures as on 21 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA131036440
BNA131036440
CNA131036440
DNA131036440

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 21 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

24 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is External plumbing and external plaster, at 99%.

A97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
B97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
C97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
D97%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks96%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.99%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 21 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes85%
Street LightingYes85%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes96%
Solid Waste Management And DisposalYes85%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes80%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed231

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots231
Closed/Covered231
BuildingClosed/CoveredTotal
A6060
B5757
C5757
D5757

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,560 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2025

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI14099.0
Proposed, not sanctioned9,133 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMukand Nagar, Swarget
Estimated costRs 64.15 cr
Cost incurredRs 62.45 cr
Work done97.35%
BuildingWingEstimatedIncurred
ANARs 15.16 crRs 14.88 cr
BNARs 15.16 crRs 14.88 cr
CNARs 15.16 crRs 14.88 cr
DNARs 15.16 crRs 14.88 cr
-NARs 3.50 crRs 2.92 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSATISH TAMASKAR
EngineerAditya Mule
Chartered AccountantAditya Patil
Chartered AccountantSaurabh Lalwani
PartnerRole in project
KALYAN JAGANNATH JADHAV-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019261Mar 2024 → Mar 2025

Reason as filed by the promotera) Our Project- ‘KJ TOWER bearing Reg. No. P52100008908 has its initial registration valid till 30th March, 2024. b) Our project is in progress which is indicated by the latest Form 1 Project Architect Certificate (attached with this application), where our project is almost 80% complete. In the year 2020, due to changes in UDCPR norms, our project quantum was impacted, which we had already considered in our project estimations. But inadvertently we missed to incorporate the impact of the changes in UDPCR on our ‘Proposed Completion Date’ of our project and erred to estimate the appropriate co

EXT52100027896Mar 2024 → Sep 2025

Reason as filed by the promoterDue to some financial and litigation problems.

EA01102517997Mar 2024 → Mar 2026

Reason as filed by the promoterDue to some financial, Government Approvals and litigation problems.

EA31032620485Mar 2024 → Jun 2026

Reason as filed by the promoterThe project timeline has been adjusted by three months to facilitate the finalization of outstanding construction work and the procurement of essential statutory clearances, including the Fire NOC and the Building Completion Certificate from the Municipal Corporation.

Litigation declared2

CaseCourtStatus
201537/2006/2006CIVIL COURT SENIOR DIVISION PUNEFILING OF AFIDAVIT
201537/2006/2006CIVIL COURT SENIOR DIVISION PUNEFILING OF AFIDAVIT

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000127102Natwar Hariprasad AgrawalKalyan Jagannath Jadhav10/06/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate_11zon.pdf21 Aug 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf21 Aug 2026
Withdrawal Update Form 3File: CA Form 3_11zon.pdf21 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A-2023-24.pdf21 Aug 2026
Form 5 (FY 2025-2026)File: Form 5-2023-24.pdf21 Aug 2026
Withdrawal Update Form 1File: Architect Certificate_11zon.pdf16 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf16 Apr 2026
Withdrawal Update Form 3File: CA Form 3_11zon.pdf16 Apr 2026
Withdrawal Update Form 1File: Architects Certificate.pdf2 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf2 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf2 Feb 2026
Withdrawal Update Form 1File: Architects Certificate.pdf29 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3_11zon.pdf29 Jan 2026
Building plan approvalFile: 10 -14 6th u0026 8th Floor (Prabhune).pdf1 Oct 2025
Form 1File: Architect Certificate .pdf1 Oct 2025
Form 2File: Engineer Certificate_11zon.pdf1 Oct 2025
Form 3File: Form 3.pdf1 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf1 Oct 2025
Withdrawal Update Form 1File: Architect Certificate.pdf1 Oct 2025
Withdrawal Update Form 2File: Form 2 Engineers Certificate.pdf1 Oct 2025
Withdrawal Update Form 3File: Form 3.pdf1 Oct 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Building Wise_11zon.pdf27 Mar 2025
Declaration in FORM BFile: Form B Affidavit_11zon.pdf18 Mar 2025
Building plan approvalFile: Binder 1.pdf17 Mar 2025
Building plan approvalFile: Binder 2.pdf17 Mar 2025
Building plan approvalFile: Binder 3.pdf17 Mar 2025
Building Plan Approval (IOD)File: Binder 1.pdf17 Mar 2025
Building Plan Approval (IOD)File: Binder 2.pdf17 Mar 2025
Building Plan Approval (IOD)File: Binder 3.pdf17 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf7 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf24 Feb 2025
Certificates of CA (Form 3)File: Form 3 compressed.pdf24 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate compressed.pdf24 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archirect Certificate_11zon.pdf3 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archirect Certificate_11zon.pdf3 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archirect Certificate_11zon.pdf3 Feb 2025
Certificates of CA (Form 3)File: form 3.pdf3 Feb 2025
Certificates of CA (Form 3)File: form 3.pdf3 Feb 2025
Certificates of CA (Form 3)File: form 3.pdf3 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_11zon.pdf3 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_11zon.pdf3 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Enginner Certificate.pdf3 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24_11zon.pdf3 Feb 2025
Certificates of CA (Form 3)File: Form 3_11zon.pdf9 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 2021-22.pdf9 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 2022-23.pdf9 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf8 Mar 2024
Declaration about Commencement CertificateFile: Format D.pdf8 Mar 2024
Declaration in FORM BFile: Form B.pdf8 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure sold unsold.pdf8 Mar 2024
Details of encumbrances concerned to FinanceFile: No encumbrance concerned to legal.pdf29 Feb 2024
Details of encumbrances concerned to LegalFile: No encumbrance concerned to legal.pdf29 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf17 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineers Certificate.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2019-20.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 2020-21.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2021-22.pdf17 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-23.pdf17 Feb 2024
Proforma of Agreement for saleFile: Annexure A RERA Agreement Model Form_11zon.pdf17 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Date 22-06-2021.pdf16 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Date 07-12-2022.pdf16 Feb 2024
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf16 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate organizations (If Applicable).pdf30 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about seperate bank account.pdf30 Jan 2024
Deviation Report with respect to Allotment letterFile: No deviation in Respect to allotment letter.pdf30 Jan 2024
Deviation Report with respect to model copy of AgreementFile: No deviation in model copy of Agreement.pdf30 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5.pdf28 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf28 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf28 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf28 Apr 2022
Layout approvalFile: Revised Layout 2.pdf25 Aug 2021
Layout approvalFile: Revised Layout 2_compressed.pdf25 Aug 2021
Copy of Layout Approval (in case of layout)File: Revised Layout 2.pdf25 Aug 2021
Copy of Layout Approval (in case of layout)File: Revised Layout 2_compressed.pdf25 Aug 2021
Building plan approvalFile: warje 113 sanction plan.pdf29 Jul 2017
Layout approvalFile: layout_1.pdf29 Jul 2017
PAN CardFile: jadhav sir pan.pdf29 Jul 2017
Copy of the legal title reportFile: 1_1.pdf29 Jul 2017
Copy of the legal title reportFile: 1_2.pdf29 Jul 2017

How this compares with Pune

36%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 27 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep KJ TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Warje13,700+ in Pune

2 kmKJ TOWERCompleted 37Lapsed / revoked 13Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 88 registered projects within 2 km.

Builder: KALYAN JAGANNATH JADHAV

KALYAN JAGANNATH JADHAV has 1 registration on MahaRERA, including KJ TOWER. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that KJ TOWER shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if KJ TOWER is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of KJ TOWER?

The registered promoter entity is KALYAN JAGANNATH JADHAV, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in KJ TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against KJ TOWER?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for KJ TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at KJ TOWER?

The professionals named in the filing: Architect: SATISH TAMASKAR; Engineer: Aditya Mule; Chartered Accountant: Aditya Patil; Chartered Accountant: Saurabh Lalwani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in KJ TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About KJ TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save KJ TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.