ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Cavansite Phase 2

Registered No litigation declared Residential / Group Housing project

Cavansite Phase 2

By Arma Landmark LLP

RG-MH-91761 · RERA P52100051028 · Last updated on MahaRERA portal: 9 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Basement (if any), 0%
60 of 140Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 136 documents Report an error

Cavansite Phase 2 is a Residential / Group Housing project by Arma Landmark LLP in Pune, Maharashtra, registered with MahaRERA as P52100051028 on 22 May 2023. Possession is promised by 30 Jun 2027. 80 of the 140 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameCavansite Phase 2
  • TypeResidential / Group Housing
  • Location
    • ATUL NAGAR
    • WARJE
    • Haveli
    • Pune
    • 411058
  • Pincode411058
  • RERA no.P52100051028
  • ReraGenie IDRG-MH-91761

Builder

  • NameArma Landmark LLP
  • Entity typePartnership

Key dates

this monthRegisteredMay 2023PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2023
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed136 files

Current status

57%80 of 140 units booked
100.0%Work done, per cost certificate

Figures as on 9 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA16141400140

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

WING A: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes0%

Parking filed95

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots95
Closed/Covered75
Open Space20

Land and ownership21

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,592 sq m
Land owned byThe promoter, with other names on the file
Named landowners21
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Jun 2025
LandownerVillageDistrict
SAHEBRAO SUNDARRAO BHELKEKothrudPune
DILIP RAJARAM DHONEMarket YardPune
BHALCHANDRA RAJARAM DHONEDhankawadiPune
LILBAI DNYANESHWAR BARATEWarjePune
SHOBATAI RAMBAHU BARATEWarjePune
BHELKE DHONE ASSOCIATESKothrudPune
GUNWANTI GAJANAN BHELKEKothrudPune
GOPI GAJANAN BHELKEKothrudPune
GIRISH GAJANAN BHELKEKothrudPune
GAURAV GAJANAN BHELKEKothrudPune
MANGALA SAHEBRAO BHELKEKothrudPune
SAGAR SAHEBRAO BHELKEKothrudPune
SACHIN SAHEBRAO BHELKEKothrudPune
SANTOSH SAHEBRAO BHELKEKothrudPune
SHANTA UTTAM BHELKEKothrudPune
GAJANAN SUNDARRAO BHELKEKothrudPune
UDAY UTTAM BHELKEKothrudPune
UMESH UTTAM BHELKEKothrudPune
VIJAY RAJARAM DHONEMarket YardPune
SANGRAM BHALCHANDRA DHONEDhankawadiPune
ASHISH BHALCHANDRA DHONEDhankawadiPune

Approvals and building plan

Sanctioning authorityPMC
Permissible FSI14728.28
Proposed, not sanctioned14,728 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE
Estimated costRs 42.94 cr
Cost incurredRs 42.94 cr
Work done100.0%
BuildingWingEstimatedIncurred
WING ANARs 38.94 crRs 38.94 cr
-NARs 4.00 crRs 4.00 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Jay Aeram
EngineerAaditya Bagul
Chartered AccountantRavindra Rathi
PartnerRole in project
Arma Landmark LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed136

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf9 May 2026
Withdrawal Update Form 2File: Form2.pdf9 May 2026
Withdrawal Update Form 3File: Form 3.pdf9 May 2026
Withdrawal Update Form 1File: Form 1.pdf4 May 2026
Withdrawal Update Form 1File: Form 1.pdf4 May 2026
Withdrawal Update Form 2File: Engineer Certificate Jan 26.pdf4 May 2026
Withdrawal Update Form 2File: Form2.pdf4 May 2026
Withdrawal Update Form 3File: Form 3.pdf4 May 2026
Withdrawal Update Form 3File: Form 3.pdf4 May 2026
Withdrawal Update Form 1File: Architect Certificate Jan 26.pdf14 Feb 2026
Withdrawal Update Form 2File: Engineer Certificate Jan 26.pdf14 Feb 2026
Withdrawal Update Form 3File: Arma Landamrk Form - 3_compressed.pdf14 Feb 2026
Withdrawal Update Form 1File: Architectural certificate 011025_compressed.pdf8 Oct 2025
Withdrawal Update Form 2File: Engineer certificate 011025_compressed.pdf8 Oct 2025
Withdrawal Update Form 3File: Arma Landmark Form -3 Sep 25.pdf8 Oct 2025
Form 5 (FY 2023-2024)File: Form 5-warje.pdf30 Jul 2025
Form 5 (FY 2024-2025)File: Form 5-CavansiteP2.pdf30 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A -2024_compressed.pdf17 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A 2025_compressed.pdf17 Jul 2025
Withdrawal Update Form 1File: Architect Certificate 30-06-25.pdf16 Jul 2025
Withdrawal Update Form 1File: Architect Certificate 30-06-25.pdf16 Jul 2025
Withdrawal Update Form 1File: Architect Certificate 30-06-25.pdf16 Jul 2025
Withdrawal Update Form 1File: Architect Certificate 30-06-25.pdf16 Jul 2025
Withdrawal Update Form 2File: Engg Certificate 30062025 Cavansite.pdf16 Jul 2025
Withdrawal Update Form 2File: Engg Certificate 30062025 Cavansite.pdf16 Jul 2025
Withdrawal Update Form 2File: Engg Certificate 30062025 Cavansite.pdf16 Jul 2025
Withdrawal Update Form 2File: Engg Certificate 30062025 Cavansite.pdf16 Jul 2025
Withdrawal Update Form 3File: Form 3 300625-Cavansite.pdf16 Jul 2025
Withdrawal Update Form 3File: Form 3 300625-Cavansite.pdf16 Jul 2025
Withdrawal Update Form 3File: Form 3 300625-Cavansite.pdf16 Jul 2025
Withdrawal Update Form 3File: Form 3 300625-Cavansite.pdf16 Jul 2025
Form 1File: architect certificate 010425.pdf8 Jul 2025
Form 2File: Engineer Certificate 010425.pdf8 Jul 2025
Form 3File: FORM 3 24-25 Q4.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DETAILS 01042025 compressed.pdf8 Jul 2025
Form 1File: Architect Certificate 1-1-2025.pdf8 Jul 2025
Form 2File: Engineering certificate 1-1-2025_compressed.pdf8 Jul 2025
Form 3File: Form - 3 Dec24.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY LIST - 01-01-2025_compressed.pdf8 Jul 2025
Form 1File: Architectural certificate 011024.pdf8 Jul 2025
Form 2File: Engineer Certificate 011024.pdf8 Jul 2025
Form 3File: Form -3 Oct24-Cavansite_compressed.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY LIST01102024compressed.pdf8 Jul 2025
Form 1File: Architect Certificate Dtd010724.pdf8 Jul 2025
Form 2File: Engineer Certificate Dtd010724.pdf8 Jul 2025
Form 3File: Form 3 Apr to Jun 24_compressed.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY LIST - 01-07-2024_compressed.pdf8 Jul 2025
Form 1File: Architect certificate 010424.pdf8 Jul 2025
Form 2File: Engineers certificate 010424.pdf8 Jul 2025
Form 3File: Form 3-01042024-CavansiteP2_compressed.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Rera Sold Unsold1042024.pdf8 Jul 2025
OthersFile: Form 5-CavansiteP2.pdf8 Jul 2025
Self-declaration of Quarterly ProgressFile: Quality Assurance certificate.pdf8 Jul 2025
Form 1File: Arch Certificate-October 23.pdf8 Jul 2025
Form 2File: Engg Certificate October 23.pdf8 Jul 2025
Form 3File: Form 3-warje_compressed.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold-warje-RERA.pdf8 Jul 2025
OthersFile: Form 5-warje.pdf8 Jul 2025
Form 1File: Architect's Certificate_compressed.pdf8 Jul 2025
Form 2File: Engineer's Certificate_compressed.pdf8 Jul 2025
Form 3File: Form - 3 CA Certificate-Revised_compressed.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory_compressed.pdf8 Jul 2025
Form 1File: RERA architect certificate 010124.pdf8 Jul 2025
Form 2File: RERA engineer certificate 010124.pdf8 Jul 2025
Form 3File: Form 3 Oct to Dec 23-Cavansite_compressed.pdf8 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY LIST - 01-01-2024.pdf8 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 010425.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 24-25 Q4.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 010425.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DETAILS 01042025 compressed.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 1-1-2025.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering certificate 1-1-2025_compressed.pdf29 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Form - 3 Dec24.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY LIST - 01-01-2025_compressed.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Oct24-Cavansite_compressed.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architectural certificate 011024.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 011024.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD BOOKED INVENTORY LIST01102024compressed.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Apr to Jun 24_compressed.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dtd010724.pdf11 Aug 2024

How this compares with Pune

57%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Cavansite Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WARJE13,700+ in Pune

Builder: Arma Landmark LLP

Arma Landmark LLP has 1 registration on MahaRERA, including Cavansite Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Cavansite Phase 2 is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Cavansite Phase 2?

The registered promoter entity is Arma Landmark LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Cavansite Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Cavansite Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Cavansite Phase 2?

The professionals named in the filing: Architect: Ar Jay Aeram; Engineer: Aaditya Bagul; Chartered Accountant: Ravindra Rathi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Cavansite Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Cavansite Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Cavansite Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.