ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / VRINDAVAN FLORA

Registered No litigation declared Residential / Group Housing project

VRINDAVAN FLORA

By Thalia Labh Home Makers Private Limited

RG-MH-21820 · RERA P52000023789 · Last updated on MahaRERA portal: 26 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

VRINDAVAN FLORA is a Residential / Group Housing project by Thalia Labh Home Makers Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000023789 on 6 Jan 2020. Possession is promised by 30 Dec 2028.

At a glance

Project

  • NameVRINDAVAN FLORA
  • TypeResidential / Group Housing
  • Location
    • CHAMBHARLI
    • KHALAPUR
    • Raigarh
    • 410202
  • Pincode410202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000023789
  • ReraGenie IDRG-MH-21820

Builder

  • NameThalia Labh Home Makers Private Limited
  • Entity typeCompany
  • CINU45200MH2006PTC160423
  • GSTIN27AABCL1994Q1ZS
  • DirectorBinit Praful Shah

Key dates

this monthRegisteredJan 2020PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Jan 2020
  • Promised completion30 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO-2 - GULMOHAR - C AND D WINGNA140000
BUILDING NO - 6 - MULTI PURPOSE HALLNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 26 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

BUILDING NO-2 - GULMOHAR - C AND D WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO - 6 - MULTI PURPOSE HALL100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 26 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
SOCIETY OFFICEYes100%
CLUBHOUSEYes45%

Parking filed82

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots82
Closed/Covered82

Land and ownership6

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,430 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
LandownerVillageDistrict
SUSHIL KUMAR BHUTIANavi Mumbai (M Corp.)Thane
THALIA VASTU INFRA PROJECTKhargharRaigarh
RAJAN PRABHAKAR BAGADEKhalapurRaigarh
VISHWANATH VITHOBA BADEPathardi(MC)Ahmednagar
ASHVIN LAXMAN PATELKhargharRaigarh
BINIT PRAFUL SHAHMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMaharashta State Road Development Corporation Limited
Permissible FSI15781.69
Proposed, not sanctioned15,782 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 2 3 AND 4 BHOOMI PARADISE PLOT NO 2 AND 3 SECTOR 11 SANPADA NAVI MUMBAI 400 705

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISTAAR ARCHITECTS AND PLANNER
EngineerS V PATEL AND ASSOCIATES
Chartered AccountantPRITESH GADA AND CO
PartnerRole in project
Thalia Labh Home Makers Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Dec 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Feb 2025

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 24.pdf26 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 4 TLHMPL.pdf19 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC TLHMPL.pdf19 Feb 2025
Other - TechnicalFile: FORM 4 TLHMPL.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 B2.pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 B2.pdf12 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 B6.pdf12 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 1.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 2.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 1.pdf7 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 2.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM - 1 - 31-03-2024.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 - BLDG NO - 2 - 31-03-2024.pdf8 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 - BLDG NO - 6 - 31-03-2024.pdf8 May 2024
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY - 31-03-2024.pdf8 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3 - 31-03-2024.pdf8 May 2024
Other - FinanceFile: LETTER.pdf8 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - 01-10-2023 TO 31-12-2023 - P52000023789.pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO-1 - BUILDING NO - 02 - 31-12-2023.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO-2 - BUILDING NO - 02 - 31-12-2023.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM NO-2 - BUILDING NO - 06 - 31-12-2023.pdf6 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY - BLDG NO - 2.pdf6 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION OF BANK ACCOUNT.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE - 05-10-2023.pdf21 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE - BLDG NO 2 - 06-10-2023.pdf21 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE - BLDG NO 6 - 06-10-2023.pdf21 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - 08-12-2023_.pdf21 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 - 2022-23.pdf21 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHTECT CERTIFICATE - BLD NO 2.pdf5 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHTECT CERTIFICATE - BLDG NO 6.pdf5 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - BLDG NO 2.pdf5 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - BLDG NO 6.pdf5 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf5 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - 31-12-2022.pdf18 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - 20-01-2023.pdf18 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - 1 - 20-01-2023.pdf18 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A - 2021-22.pdf18 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - VRINDAVAN FLORA.pdf11 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 - THALIA LABH HOMEMAKERS PVT LTD - 21-22.pdf24 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: VRINDAVAN FLORA - 2 - 6.pdf21 Jan 2023
Declaration about Commencement CertificateFile: DECLARATION OF COMMENCEMENT CERTIFICATE - THALIA LABH HOME MAKERS PVT LTD.pdf9 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A - 19-20 - GULHOMAR - THALIA LABH HOME MAKERS PVT LTD.pdf9 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A - 20-21 - GULHOMAR - THALIA LABH HOME MAKERS PVT LTD.pdf9 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 - THALIA LABH HOME MAKERS PVT LTD.pdf9 Nov 2021
Declaration in FORM BFile: FORM B - THALIA LABH HOME MAKER.pdf23 Dec 2019
Building plan approvalFile: COMMENCEMENT CERTIFICATE - THALIA LABH HOME MAKERS PVT LTD.pdf21 Dec 2019
Layout approvalFile: LAYOUT PLAN - THALIA LABH HOME MAKERS PVT LTD.pdf21 Dec 2019
PAN CardFile: PAN CARD - THALIA LABH HOME MAKERS PVT LTD.pdf21 Dec 2019
Details of encumbrancesFile: LETTER OF ENCUMBRANCES - THALIA LABH HOME MAKER PVT LTD.pdf21 Dec 2019
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - THALIA LABH HOME MAKERS PVT LTD.pdf21 Dec 2019
Building Plan Approval / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE - THALIA LABH HOME MAKERS PVT LTD.pdf21 Dec 2019
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE - THALIA LABH HOME MAKERS PVT LTD.pdf21 Dec 2019
Proforma of Allotment letterFile: PROFORMA OF ALLOTMENT LETTER - THALIA LABH HOME MAKERS PVT LTD.pdf21 Dec 2019
Proforma of Allotment letterFile: proforma of agreement for sale - THALIA LABH HOME MKRS.pdf21 Dec 2019
Copy of the legal title reportFile: LEGAL TITLE REPORT - THALIA LABHA HOME MAKERS PVT LTD.pdf20 Dec 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE - THALIA LABHA HOME MAKERS PVT LTD.pdf20 Dec 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - THALIA LABHA HOME MAKERS PVT LTD.pdf20 Dec 2019

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRINDAVAN FLORA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHALAPUR5,900+ in Raigarh

2 kmVRINDAVAN FLORALapsed / revoked 8Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 17 registered projects within 2 km.

Builder: Thalia Labh Home Makers Private Limited

Thalia Labh Home Makers Private Limited has 1 registration on MahaRERA, including VRINDAVAN FLORA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if VRINDAVAN FLORA is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRINDAVAN FLORA?

The registered promoter entity is Thalia Labh Home Makers Private Limited, a company as per the filing. Its CIN U45200MH2006PTC160423 and GSTIN 27AABCL1994Q1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRINDAVAN FLORA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRINDAVAN FLORA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRINDAVAN FLORA?

The professionals named in the filing: Architect: VISTAAR ARCHITECTS AND PLANNER; Engineer: S V PATEL AND ASSOCIATES; Chartered Accountant: PRITESH GADA AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRINDAVAN FLORA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRINDAVAN FLORA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRINDAVAN FLORA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.