ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / VRINDAVAN CITY PHASE -1

Registered No litigation declared Residential / Group Housing project

VRINDAVAN CITY PHASE -1

By VANDU BUILDER LLP

RG-MH-18321 · RERA P51700076670 · Last updated on MahaRERA portal: 17 Apr 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
254 of 254Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 46 documents Report an error

VRINDAVAN CITY PHASE -1 is a Residential / Group Housing project by VANDU BUILDER LLP in Thane, Maharashtra, registered with MahaRERA as P51700076670 on 20 Jun 2024. Possession is promised by 31 Dec 2030. 0 of the 254 units on this registration are recorded sold or booked, and 0 of 22 construction stages are filed complete.

At a glance

Project

  • NameVRINDAVAN CITY PHASE -1
  • TypeResidential / Group Housing
  • Location
    • DHAVALE
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700076670
  • ReraGenie IDRG-MH-18321

Builder

  • NameVANDU BUILDER LLP
  • Entity typePartnership
  • GSTIN27AAVFV6072A1ZU
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersRAMESH SAVA THANS, KHIMJI MEGHJI BARVADIYA
  • Other registrations1 more →

Key dates

this monthRegisteredJun 2024PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2024
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed46 files

Current status

0%0 of 254 units booked

Figures as on 17 Apr 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1NA11111460146
BUILDING 2NA801080108

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

BUILDING 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed289

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots289
Closed/Covered41
Open Space248
BuildingClosed/CoveredOpen SpaceTotal
BUILDING 129133162
BUILDING 212115127

Land and ownership7

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,020 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
LandownerVillageDistrict
NAJMUDDIN ABDULHUSSAIN SHOPURWALAThane (M Corp.)Thane
ABEDA NAJMUDDIN SHOPURWALAThane (M Corp.)Thane
INSIYA ABDULKADAR SHOPURWALAThane (M Corp.)Thane
ABDUL KADAR NAJMUDDIN SHOPURWALAThane (M Corp.)Thane
ATEKA MUFADDAL MANSAURWALAKandivaliMumbai Suburban
KHATIJA MUSTAFA BATAAndheriMumbai Suburban
SAMINA ABDUL MUNAF KHERADIAGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Permissible FSI12407.26
Proposed, not sanctioned12,407 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 4 AND 5, KETKAR RESIDENCY, TILAK ROAD, DOMBIVALI EAST, THANE, MAHARASHTRA 421021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE DESIGN INDIA GROUP
EngineerTHE DESIGN INDIA GROUP
Chartered AccountantJIYAN SHAH AND CO
PartnerRole in project
VANDU BUILDER LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed46

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: VANDU FORM 1_compressed.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VANDU FORM 2_compressed.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SEPT FORM 1 VANDU BUILDER_compressed.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 VANDU BUILDERS 30 DEC 24_compressed.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 VANDU BUILDERS SEP_compressed.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fom 2 vandu builders 30 dec 24_compressed.pdf31 Jan 2025
Declaration about Commencement CertificateFile: declaration about commencement certificate vandu builder (1)_compressed.pdf6 Jun 2024
Declaration about Commencement CertificateFile: CC CONFIRMATION.pdf6 Jun 2024
Other - FinanceFile: CC CONFIRMATION.pdf24 May 2024
Declaration in FORM BFile: FORM B PROMOTERS.pdf18 May 2024
Other - FinanceFile: GetUserDocumentFileContent (5).pdf18 May 2024
Layout approvalFile: BUILDING PLAN 1 FINAL_compressed.pdf13 May 2024
Layout approvalFile: BUILDING PLAN 2 FINAL_compressed.pdf13 May 2024
Building plan approvalFile: BUILDING PLAN 3 FINAL_compressed.pdf13 May 2024
Building plan approvalFile: BUILDING PLAN 4 FINAL_compressed.pdf13 May 2024
PAN CardFile: VANDU PAN CARD NEW.pdf13 May 2024
Copy of the legal title reportFile: legal title report vandu builders 1.pdf13 May 2024
Copy of the legal title reportFile: legal title report vandu builders 2.pdf13 May 2024
Details of encumbrances concerned to FinanceFile: encumbrances concern_compressed (1).pdf13 May 2024
Details of encumbrances concerned to FinanceFile: no encumbrances to legal_compressed.pdf13 May 2024
Details of encumbrances concerned to LegalFile: encumbrances concern_compressed (1).pdf13 May 2024
Details of encumbrances concerned to LegalFile: no encumbrances to legal_compressed.pdf13 May 2024
Copy of Layout Approval (in case of layout)File: BUILDING PLAN 1 FINAL_compressed.pdf13 May 2024
Copy of Layout Approval (in case of layout)File: BUILDING PLAN 2 FINAL_compressed.pdf13 May 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 3 FINAL_compressed.pdf13 May 2024
Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 4 FINAL_compressed.pdf13 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Cc copy of vandu builder.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf13 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf13 May 2024
CERSAI detailsFile: report from CERSAI_compressed (1).pdf13 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FINAL 2024.pdf13 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ORDER NO 39 - KHIMJI_compressed.pdf13 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure a ramesh_compressed.pdf13 May 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE (2).pdf13 May 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf13 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank account_compressed.pdf13 May 2024
Deviation Report with respect to Allotment letterFile: No deviation allotment letter(2)_compressed.pdf13 May 2024
Deviation Report with respect to model copy of AgreementFile: No deviation in agreement for sale(2)_compressed.pdf13 May 2024
Other - LegalFile: sale deed vandu bildar llp 1 TO 50 PAGE_compressed.pdf13 May 2024
Other - LegalFile: sale deed vandu bildar llp 51 TO 100 PAGE_compressed.pdf13 May 2024
Other - LegalFile: sale deed vandu bildar llp 101 TO 130 PAGE compressed.pdf13 May 2024
Other - LegalFile: sale deed vandu bildar llp 131 TO 163 PAGE_compressed.pdf13 May 2024
Other - LegalFile: built up area statement.pdf13 May 2024
Other - LegalFile: CC CONFIRMATION.pdf13 May 2024
Other - TechnicalFile: built up area statement.pdf13 May 2024
Other - TechnicalFile: DECLARATION CUM UNDERTAKING.pdf13 May 2024

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRINDAVAN CITY PHASE -1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DHAVALE7,600+ in Thane

Builder: VANDU BUILDER LLP

VANDU BUILDER LLP has 2 registrations on MahaRERA, including VRINDAVAN CITY PHASE -1 and Vrindavan Homes Phase 3. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if VRINDAVAN CITY PHASE -1 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRINDAVAN CITY PHASE -1?

The registered promoter entity is VANDU BUILDER LLP, a partnership as per the filing. Its GSTIN 27AAVFV6072A1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRINDAVAN CITY PHASE -1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VRINDAVAN CITY PHASE -1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRINDAVAN CITY PHASE -1?

The professionals named in the filing: Architect: THE DESIGN INDIA GROUP; Engineer: THE DESIGN INDIA GROUP; Chartered Accountant: JIYAN SHAH AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRINDAVAN CITY PHASE -1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRINDAVAN CITY PHASE -1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRINDAVAN CITY PHASE -1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.