Completed No litigation declared Residential / Group Housing project

VRINDANAND ELITE

By MAKWANA AND TANMAY CONSTRUCTION

RG-MH-22070 · RERA P52100030243 · Last updated on MahaRERA portal: 20 Jul 2023

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Staircases, 80%
3Complaints at MahaRERAon this registration
Jump to the 26 documents Report an error

VRINDANAND ELITE is a Residential / Group Housing project by MAKWANA AND TANMAY CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100030243 on 10 Aug 2021. The registration is recorded completed; possession was promised by 31 Dec 2023. 3 complaints are on record with the regulator.

At a glance

Project

  • NameVRINDANAND ELITE
  • TypeResidential / Group Housing
  • Location
    • KONDHWA ROAD
    • KONDHWA BUDRUK
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100030243
  • ReraGenie IDRG-MH-22070

Builder

  • NameMAKWANA AND TANMAY CONSTRUCTION
  • Entity typePartnership
  • PartnersUTTAM RAMNIKBHAI MAKWANA, UMESH RAJENDRA BORA
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredAug 2021PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Aug 2021
  • Promised completion31 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed26 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
VRINDANAND ELITENA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 80%.

VRINDANAND ELITE: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure6%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered10

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area308 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI958.47
Proposed, not sanctioned758 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKondhwa

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCUBIX ARCHITECT ASSOCIATES
EngineerUmesh Bora
Chartered AccountantSAC & Co LLP
PartnerRole in project
MAKWANA AND TANMAY CONSTRUCTION-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC12600339Aniket Kisan Gujrathi and OthersMAKWANA AND TANMAY CONSTRUCTION18/01/2026
CC12603077Mrunal Milind BichkarMAKWANA AND TANMAY CONSTRUCTION24/05/2026
CC12603355Ritu Abhijeet GoyalMAKWANA AND TANMAY CONSTRUCTION01/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Jun 2023

Documents filed26

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: engineer certificate vrindanand elite.pdf20 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 3-Makhwana-Vrindanand Elite-both sign_compressed.pdf20 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion certificate of vrindanand elite.pdf19 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: form 4 vrindanand elite.pdf19 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf9 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 engineer certificate.pdf9 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 ca certificate.pdf9 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: vrindanand elite architect certificate.pdf27 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certifate vrindanad elite.pdf23 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate elite.pdf23 Dec 2022
Proforma of Allotment letterFile: Agreement of Sale-compressed.pdf7 Mar 2022
Declaration about Commencement CertificateFile: Declaration about commencement certificate-1_compressed NEW.pdf27 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Site Engineer certificate_compressed NEW.pdf27 Jul 2021
Layout approvalFile: 05 Approved Layout Plan.pdf24 Jul 2021
Building plan approvalFile: 06 Approved Sanction building plan.pdf24 Jul 2021
PAN CardFile: 01 Pan Firm.pdf24 Jul 2021
Copy of the legal title reportFile: 04 Title Peport-Vrindanand Elite-compressed (1).pdf24 Jul 2021
Details of encumbrancesFile: Declaration for emcumbrances.pdf24 Jul 2021
Copy of Layout Approval (in case of layout)File: 05 Approved Layout Plan.pdf24 Jul 2021
Building Plan Approval / NA Order for plotted developmentFile: 06 Approved Sanction building plan.pdf24 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: 07 Commencement Certificate New.pdf24 Jul 2021
Declaration in FORM BFile: Declaration Form B New.pdf24 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 1.pdf24 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Final.pdf24 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 CA Certificate.pdf24 Jul 2021
Proforma of Allotment letterFile: Declaration for Agreement.pdf24 Jul 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VRINDANAND ELITE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KONDHWA BUDRUK13,700+ in Pune

2 kmVRINDANAND ELITECompleted 67Lapsed / revoked 30Other 97Dot size: filed unitsN

Filed coordinates, straight-line distance. 194 registered projects within 2 km.

Builder: MAKWANA AND TANMAY CONSTRUCTION

MAKWANA AND TANMAY CONSTRUCTION has 3 registrations on MahaRERA, including VRINDANAND ELITE and VRINDANAND-BLISS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if VRINDANAND ELITE is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VRINDANAND ELITE?

The registered promoter entity is MAKWANA AND TANMAY CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VRINDANAND ELITE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against VRINDANAND ELITE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for VRINDANAND ELITE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VRINDANAND ELITE?

The professionals named in the filing: Architect: CUBIX ARCHITECT ASSOCIATES; Engineer: Umesh Bora; Chartered Accountant: SAC & Co LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VRINDANAND ELITE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VRINDANAND ELITE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VRINDANAND ELITE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.