Home / Browse projects / Nashik, Maharashtra / VRAJ LANDMARK 1B
VRAJ LANDMARK 1B
RG-MH-13666 · RERA P51600027219 · Last updated on MahaRERA portal: 19 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
VRAJ LANDMARK 1B is a Others project by SHREE INFRA SPACE in Nashik, Maharashtra, registered with MahaRERA as P51600027219 on 24 Nov 2020. Possession is promised by 30 Jun 2031. 59 of the 120 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameVRAJ LANDMARK 1B
- TypeOthers
- Location
- MAKHAMALABAD PETH ROAD
- NEAR MARKET YARD
- NASHIK.
- MARKET YARD
- Nashik (M Corp.)
- Nashik
- 422007
- Pincode422007
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600027219
- ReraGenie IDRG-MH-13666
Builder
- NameSHREE INFRA SPACE
- Entity typePartnership
- GSTIN27AEAFS9458Q1Z1
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersVARSHA MANOJ LADANI, MANOJKUMAR JAMNADAS LADANI
- Other registrations3 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Nov 2020
- Promised completion30 Jun 2031
- Revised completionNone
- Buildings1 building record
- Documents filed124 files
Current status
Figures as on 19 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| VRAJ LANDMARK 1B | NA | 7 | 7 | 35 | 85 | 120 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 80%.
VRAJ LANDMARK 1B: 85% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80% |
Progress on shared amenities15
As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed100
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| VRAJ LANDMARK 1B | NA | Rs 15.00 cr | Rs 4.67 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VASTUMITRA |
| Engineer | DELTACOM STRUCTURAL CONSULTANTS |
| Engineer | SHAILESH P DHUMANE |
| Chartered Accountant | ANIL KHETMAL DAHIYA |
| Chartered Accountant | RUSHIKESH VIJAY NANDAPURE |
| Chartered Accountant | SIMRAN KAUR JEETCHANDER RAIT |
| Partner | Role in project |
|---|---|
| SHREE INFRA SPACE | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 7 Nov 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Nov 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jun 2031
Documents filed124
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 124 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 19 May 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 May 2026 |
| Withdrawal Update Form 3File: Form 3_compressed.pdf | 19 May 2026 |
| Withdrawal Update Form 1File: FORM 1 8-7-2025 VRA LANDMARK 1B.pdf | 28 Feb 2026 |
| Withdrawal Update Form 1File: Form-1-1B_compressed.pdf | 28 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 1B.pdf | 28 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 VRAJ LANDMARK 1B.pdf | 28 Feb 2026 |
| Withdrawal Update Form 3File: Form-3 Vraj Landmark 1B.pdf | 28 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3 30-09-2025 VRAJ LANDMARK 1B_compressed.pdf | 28 Feb 2026 |
| Form 5 (FY 2024-2025)File: form-5 Shree Infra Space-1B.pdf | 19 Dec 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: _FORM 1 23-04-2024 VRAJ LADNMARK 1B-f.pdf | 10 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VRAJ LANDMARK 1B-f.pdf | 10 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VRAJ LANDMARK 1B-f.pdf | 10 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VRAJ LANDMARK 1B -f.pdf | 10 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VRAJ LANDMARK 1B -f.pdf | 10 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VRAJ LANDMARK 1B -f.pdf | 10 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VRAJ LANDMARK 1B-f.pdf | 10 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 VRAJ LANDMARK 1B-f.pdf | 10 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure_of_Sold_Unsold_units.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure_of_Sold_Unsold_units.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure_of_Sold_Unsold_units.pdf | 10 Jul 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 30-09-2024 VRAJ LANDMARK 1B.pdf | 10 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Vraj Landmark 1B.pdf | 5 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vraj Landmark 1B.pdf | 5 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3-final.pdf | 4 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf | 4 Jun 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format - A- Bank Account Disclosure.pdf | 4 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1B.pdf | 24 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31-12-2024 VRAJ LANDMARK 1B_compressed.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1B Form 1 Sep 24_compressed.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1B Form 1 June 24_compressed.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1B Form 2 Dec 24.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1B Form 2 sep 23_compressed.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 08-07-2024 VRAJ LANDMARK 1B.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2-FORM-1-30-06-2021VL.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1- FORM -1-31-03-2021vl.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12-FORM-1-31-12-2023V L.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11-FORM-1-30-09-2023VL.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10-FORM-1-30-06-2023VL.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9-FORM-1-31-03-2023VL.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8-FORM-1-31-12-2022VL.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9-FORM-1-31-03-2023VL.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9-FORM-1-31-03-2023VL.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8-FORM-1-31-12-2022VL.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7-FORM-1-30-09-2022VL.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6- FORM-1-30-06-2022VL.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5-FORM-1-31-03-2022V L.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4-FORM-1-31-12-2021V L.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3-FORM-1-30-09-2021V L.pdf | 11 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7-FORM-1-30-09-2022VL.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2-FORM-2-30-06-2021VL.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13-FORM-2.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12-FORM-2.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11-FORM-2.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10-FORM-2.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9-FORM-2.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8-FORM-2.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7-FORM-2.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6-FORM-2.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5-FORM-2.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4-FORM-231-12-2021VL.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3-FORM-2-30-09-2021VL.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1-FORM-2-31-03-2021VL.pdf | 11 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form_2A_20-21.pdf | 11 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory March 24.pdf | 23 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Declaration.pdf | 23 Dec 2024 |
| Declaration about Commencement CertificateFile: FORMAT-D DECLARATION ABOUT COMMENCMENT CERTIFICATE.pdf | 23 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form_2A_21-22.pdf | 23 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form_2A_22-23.pdf | 23 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form_2A_23-24.pdf | 23 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 23-04-2024 VRAJ LANDMARK 1B.pdf | 18 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 23-04-2024 VRAJ LANDMARK 1B.pdf | 18 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL.pdf | 18 May 2024 |
| Disclosure of sold/ booked inventoryFile: Dec 20_Final.pdf | 13 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: March 21_Final.pdf | 13 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: June 21_Final.pdf | 13 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sep 21_Final.pdf | 13 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Dec 21_Final.pdf | 13 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: March 22_Final.pdf | 13 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 124 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep VRAJ LANDMARK 1B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MARKET YARD4,100+ in Nashik
Filed coordinates, straight-line distance. 95 registered projects within 2 km.
SHREE GANESH SRUSHTI
JYK NIRMITI INFRA LLP
BOLKAR MAJESTIC
GANESH TUKARAM BOLKAR
PALM TOWN
VAKRATUNDA PROPERTIES
Swaraj 1 and 2 BHK Homes
Kothawale Patil Builders And Developers Pv
HAPPY LIFE AT APNA GHAR PHASE V
M/S Shweta Infrastructure & Housing (I) Pv
Balaji Heights
Geeta Developers
See every Nashik project, with the district possession charts
Builder: SHREE INFRA SPACE
SHREE INFRA SPACE has 4 registrations on MahaRERA, including VRAJ LANDMARK 1A and VRAJ LANDMARK 1B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if VRAJ LANDMARK 1B is delayed beyond 30 Jun 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of VRAJ LANDMARK 1B?
The registered promoter entity is SHREE INFRA SPACE, a partnership as per the filing. Its GSTIN 27AEAFS9458Q1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in VRAJ LANDMARK 1B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for VRAJ LANDMARK 1B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at VRAJ LANDMARK 1B?
The professionals named in the filing: Architect: VASTUMITRA; Engineer: DELTACOM STRUCTURAL CONSULTANTS; Engineer: SHAILESH P DHUMANE; Chartered Accountant: ANIL KHETMAL DAHIYA; Chartered Accountant: RUSHIKESH VIJAY NANDAPURE; Chartered Accountant: SIMRAN KAUR JEETCHANDER RAIT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in VRAJ LANDMARK 1B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback